Difference between revisions of "Ghana FSRU LNG Import Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === Ownership: Website: Location: Port of Tema Capacity: million tons/annum Status: Under Construction Brief Description The teminal will utilise the...") |
Abarrelfull (talk | contribs) |
||
(7 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | Ownership: | + | * Ownership: Helios |
− | Website: | + | * Website: |
− | Location: Port of Tema | + | * Location: Port of Tema |
− | Capacity: million tons/annum | + | * Capacity: 2 million tons/annum |
− | Status: | + | * Status: In operation |
− | |||
− | + | === Brief Description === | |
− | + | * Floating Regas Unit (FRU) works in conjunction with an upgraded 127,500 m3 LNG Carrier, to deliver 250mmscfd natural gas, as well as facilities to bunker, reload or break bulk LNG | |
+ | * It is connected to shore by a 6 km long pipeline | ||
+ | * The terminal is operated by Reganosa | ||
− | + | === Technical Details === | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | + | * Storage capacity: 170,000 | |
− | + | * Unloading capacity: | |
+ | * Send out capacity: 250mmscfd | ||
+ | * Constructor: | ||
+ | ** Jiangnan Shipyard of China: Floating regasification unit | ||
+ | ** China Harbour Engineering Company: Marine facilities | ||
− | Suppliers: | + | === Ongoing Projects/Project Status === |
− | Customers: | + | * Under construction |
− | History | + | * Commissioning is expected in 2020 |
+ | === Suppliers / Customers === | ||
+ | * Suppliers: Rosneft is to supply 1.7 million tpa | ||
+ | * Customers: | ||
+ | === History === | ||
− | 2015 - Contract signed with Golar for the vessel | + | * 2015 - Contract signed with Golar for the vessel |
− | + | * 2018 - Construction contracts signed | |
+ | * 2021 - The terminal began operations | ||
+ | === Other Information === | ||
+ | * Golar was to be a partner to the project, but is no longer involved | ||
- | - | ||
+ | |||
=== Links === | === Links === | ||
# [http://killajoules.wikidot.com/blog:6084 Golar and West African Gas Limited Agree Ghana FSRU Contract] | # [http://killajoules.wikidot.com/blog:6084 Golar and West African Gas Limited Agree Ghana FSRU Contract] | ||
+ | # [https://a-barrel-full.blogspot.com/2020/10/agreement-for-construction-of-tema-lng.html Agreement For Construction Of Tema LNG Terminal Project Signed] | ||
+ | # [https://a-barrel-full.blogspot.com/2020/10/rosneft-and-gnpc-arrange-lng-supply-to.html Rosneft and GNPC arrange LNG supply to Ghana and sign a cooperation agreement] | ||
+ | # [https://abarrelfull.blogspot.com/2022/01/reganosa-to-operate-and-maintain-sub.html Reganosa To Operate And Maintain Sub-Saharan Africa’s First Offshore LNG Receiving Terminal In Ghana] |
Latest revision as of 10:52, 17 January 2022
Contents
Summary Information
- Ownership: Helios
- Website:
- Location: Port of Tema
- Capacity: 2 million tons/annum
- Status: In operation
Brief Description
- Floating Regas Unit (FRU) works in conjunction with an upgraded 127,500 m3 LNG Carrier, to deliver 250mmscfd natural gas, as well as facilities to bunker, reload or break bulk LNG
- It is connected to shore by a 6 km long pipeline
- The terminal is operated by Reganosa
Technical Details
- Storage capacity: 170,000
- Unloading capacity:
- Send out capacity: 250mmscfd
- Constructor:
- Jiangnan Shipyard of China: Floating regasification unit
- China Harbour Engineering Company: Marine facilities
Ongoing Projects/Project Status
- Under construction
- Commissioning is expected in 2020
Suppliers / Customers
- Suppliers: Rosneft is to supply 1.7 million tpa
- Customers:
History
- 2015 - Contract signed with Golar for the vessel
- 2018 - Construction contracts signed
- 2021 - The terminal began operations
Other Information
- Golar was to be a partner to the project, but is no longer involved
-
Links
- Golar and West African Gas Limited Agree Ghana FSRU Contract
- Agreement For Construction Of Tema LNG Terminal Project Signed
- Rosneft and GNPC arrange LNG supply to Ghana and sign a cooperation agreement
- Reganosa To Operate And Maintain Sub-Saharan Africa’s First Offshore LNG Receiving Terminal In Ghana