Difference between revisions of "Delfin LNG Export Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 8: | Line 8: | ||
=== Brief Description === | === Brief Description === | ||
− | * - | + | * The project is a modular offshore export facility that uses up to 4 standardised vessels |
+ | * The Delfin LNG deepwater port will reuse and repurpose two existing offshore natural gas pipelines; the former U-T Operating System (UTOS) pipeline and the High Island Offshore System (HIOS) pipeline | ||
=== Technical Details === | === Technical Details === |
Revision as of 12:42, 14 January 2022
Contents
Summary Information
- Ownership:
- Website:
- Location:
- Capacity: million tons/annum
- Status: (In Operation / Planned / Under Construction)
Brief Description
- The project is a modular offshore export facility that uses up to 4 standardised vessels
- The Delfin LNG deepwater port will reuse and repurpose two existing offshore natural gas pipelines; the former U-T Operating System (UTOS) pipeline and the High Island Offshore System (HIOS) pipeline
Technical Details
- Storage capacity:
- Constructor: Samsung Heavy Industries and Black & Veatch: FEED for vessel
- Licensor: Black & Veatch
Ongoing Projects/Project Status
- Commissioning is expected in 202X
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2020 - FEED completed for LNG vessel