Difference between revisions of "Moscow Refinery Euro V+ Project"
		
		
		
		
		Jump to navigation
		Jump to search
		
| Abarrelfull (talk | contribs) | Abarrelfull (talk | contribs)  | ||
| Line 13: | Line 13: | ||
| * Budget: | * Budget: | ||
| − | + | === The Project === | |
| * Project Type: Upgrade | * Project Type: Upgrade | ||
| Line 19: | Line 19: | ||
| * Main Contractors | * Main Contractors | ||
| − | + | === Refining Units === | |
| * Vacuum distillation unit | * Vacuum distillation unit | ||
| * Fluidised catalytic cracker | * Fluidised catalytic cracker | ||
| − | + | === Terminal Capacity === | |
| * Crude Oil:   | * Crude Oil:   | ||
| * Refined Products:   | * Refined Products:   | ||
| − | + | === Crude Supply === | |
| * - | * - | ||
| − | + | === Products Produced === | |
| * The project will result in more gasoline and less residual fuel oil | * The project will result in more gasoline and less residual fuel oil | ||
| − | + | === History === | |
| * 2017 - The VDU was delivered to the site | * 2017 - The VDU was delivered to the site | ||
| + | * 2020 - The project was completed | ||
| − | + | === Other Information === | |
| * - | * - | ||
Revision as of 11:51, 11 January 2022
Contents
Summary Information
- Ownership: Sibir / Gazprom Neft
- Website: http://www.gazprom-neft.com/
- Location: Moscow, Russia
- Wiki Page: Moscow Refinery
- Location:
- Capacity: million tons/annum & bbl/day
- Nelson Complexity:
- Project Stage:
- Expected Completion: [[[Refinery Projects to be Completed in 2019 | 2019]]]
- Budget:
The Project
- Project Type: Upgrade
- Project Summary:
- Main Contractors
Refining Units
- Vacuum distillation unit
- Fluidised catalytic cracker
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
- -
Products Produced
- The project will result in more gasoline and less residual fuel oil
History
- 2017 - The VDU was delivered to the site
- 2020 - The project was completed
Other Information
- -
