Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: * Website: * Location: * Capacity: million tons/annum * Status: === Brief Description === === Technical Details === * Storage...") |
Abarrelfull (talk | contribs) (→Links) |
||
| (12 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
| − | * Ownership: | + | * Ownership: Hangjiaxin (Jiaxing Gas/Hangzhou Gas) |
* Website: | * Website: | ||
| − | * Location: | + | * Location: Zhejiang, China |
| − | * Capacity: million tons/annum | + | * Capacity: 1.0 million tons/annum |
| − | * Status: | + | * Status: Under construction |
| + | |||
=== Brief Description === | === Brief Description === | ||
| − | + | * A small scale onshore LNG terminal | |
| + | * The design capability is 1 million tons per annum (mtpa), with regasification capacity of 0.6 mtpa and LNG truck export capacity of 0.4 mtpa. | ||
=== Technical Details === | === Technical Details === | ||
| − | * Storage capacity: | + | * Storage capacity: 2x 100,000 m3 tanks |
* Unloading capacity: | * Unloading capacity: | ||
* Send out capacity: | * Send out capacity: | ||
* Constructor: | * Constructor: | ||
| + | ** HalcrowSea: Evaluate the proposed LNG sites & prepare EPC Tender Documents | ||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
| − | + | * Under construction | |
| + | * Commissioning is scheduled for [[LNG Terminal Projects to be Completed in 2023 | 2023]] | ||
=== Suppliers / Customers === | === Suppliers / Customers === | ||
| − | * Suppliers: | + | * Suppliers: |
| − | * Customers: | + | ** Pavilion Energy will supply 0.5 mtpa from 2023 |
| + | ** Saibu gas will supply 0.14 mtpa from Novatek | ||
| + | * Customers: The terminal will supply the local grid | ||
=== History === | === History === | ||
| − | * | + | * 2021 - Hangjiaxin signs agreement with Novatak and Saibu Gas for LNG Transhipment |
| + | * 2021 - Hangjiaxin and Pavilion Energy sign LNG supply agreement | ||
=== Other Information === | === Other Information === | ||
| Line 32: | Line 39: | ||
- | - | ||
=== Links === | === Links === | ||
| − | # | + | # [http://www.halcrowgroup.com/Projects/152901874663.html Halcrow Group] |
| + | # [https://lng-news.blogspot.com/2022/01/pavilion-energy-inks-deal-to-supply.html Pavilion Energy Inks Deal to Supply Small-Scale LNG to Hangjiaxin] | ||
| + | # [https://abarrelfull.blogspot.com/2022/01/saibu-gas-signed-hoa-with-novatek-on.html Saibu Gas signed HOA with Novatek on LNG Transshipment Project] | ||
[[category:LNG]] | [[category:LNG]] | ||
[[category:China]] | [[category:China]] | ||
Latest revision as of 09:30, 7 January 2022
Contents
Summary Information
- Ownership: Hangjiaxin (Jiaxing Gas/Hangzhou Gas)
- Website:
- Location: Zhejiang, China
- Capacity: 1.0 million tons/annum
- Status: Under construction
Brief Description
- A small scale onshore LNG terminal
- The design capability is 1 million tons per annum (mtpa), with regasification capacity of 0.6 mtpa and LNG truck export capacity of 0.4 mtpa.
Technical Details
- Storage capacity: 2x 100,000 m3 tanks
- Unloading capacity:
- Send out capacity:
- Constructor:
- HalcrowSea: Evaluate the proposed LNG sites & prepare EPC Tender Documents
Ongoing Projects/Project Status
- Under construction
- Commissioning is scheduled for 2023
Suppliers / Customers
- Suppliers:
- Pavilion Energy will supply 0.5 mtpa from 2023
- Saibu gas will supply 0.14 mtpa from Novatek
- Customers: The terminal will supply the local grid
History
- 2021 - Hangjiaxin signs agreement with Novatak and Saibu Gas for LNG Transhipment
- 2021 - Hangjiaxin and Pavilion Energy sign LNG supply agreement
Other Information
-