Difference between revisions of "Jiaxing LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 12: | Line 12: | ||
=== Technical Details === | === Technical Details === | ||
− | * Storage capacity: | + | * Storage capacity: 2x 100,000 m3 tanks |
* Unloading capacity: | * Unloading capacity: | ||
* Send out capacity: | * Send out capacity: |
Revision as of 09:29, 7 January 2022
Contents
Summary Information
- Ownership: Hangjiaxin (Jiaxing Gas/Hangzhou Gas)
- Website:
- Location: Zhejiang, China
- Capacity: 1.0 million tons/annum
- Status: Under construction
Brief Description
- A small scale onshore LNG terminal
Technical Details
- Storage capacity: 2x 100,000 m3 tanks
- Unloading capacity:
- Send out capacity:
- Constructor:
- HalcrowSea: Evaluate the proposed LNG sites & prepare EPC Tender Documents
Ongoing Projects/Project Status
- Under construction
- Commissioning is scheduled for 2023
Suppliers / Customers
- Suppliers:
- Pavilion Energy will supply 0.5 mtpa from 2023
- Saibu gas will supply 0.14 mtpa from Novatek
- Customers: The terminal will supply the local grid
History
- 2021 - Hangjiaxin signs agreement with Novatak and Saibu Gas for LNG Transhipment
- 2021 - Hangjiaxin and Pavilion Energy sign LNG supply agreement
Other Information
-