Difference between revisions of "Longkou Nanshan LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (→Links) |
Abarrelfull (talk | contribs) (→Links) |
||
Line 37: | Line 37: | ||
# [https://abarrelfull.blogspot.com/2022/01/the-civil-works-for-storage-tank-of.html The Civil Works for the Storage Tank of Longkou LNG Project Kicks off Successfully] | # [https://abarrelfull.blogspot.com/2022/01/the-civil-works-for-storage-tank-of.html The Civil Works for the Storage Tank of Longkou LNG Project Kicks off Successfully] | ||
# [https://lng-news.blogspot.com/2021/12/tank-roofs-raised-on-all-four-220000.html Tank Roofs raised on all four 220,000 cubic meters storage tanks of the Longkou LNG project] | # [https://lng-news.blogspot.com/2021/12/tank-roofs-raised-on-all-four-220000.html Tank Roofs raised on all four 220,000 cubic meters storage tanks of the Longkou LNG project] | ||
+ | |||
+ | [[category:LNG]] | ||
+ | [[category:China]] | ||
+ | [[category:PipeChina]] |
Revision as of 17:04, 6 January 2022
Contents
Summary Information
- Ownership: PipeChina
- Website: https://www.pipechina.com.cn/
- Location: Longkou Port District, Yantai City, Shandong Province
- Capacity: 5.0 million tons/annum
- Status: Under construction
Brief Description
- A five million tons per annum onshore terminal with four LNG tanks
- Each 220,000 cubic metre storage tank has a single bearing platform with a diameter of 93.4 metres and a tank height of 60.4 metres.
Technical Details
- Storage capacity: 4*220,000 M3
- Unloading capacity:
- Send out capacity: 40 million cubic metres per day
- Constructor:
Ongoing Projects/Project Status
- The terminal is under construction
- Commissioning is scheduled for completion in 2023
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2020 - Construction was launched