Difference between revisions of "São Paulo LNG Regasification Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 12: | Line 12: | ||
=== Technical Details === | === Technical Details === | ||
− | * Storage capacity: | + | * Storage capacity: 170,000 m³ |
* Unloading capacity: | * Unloading capacity: | ||
* Send out capacity: | * Send out capacity: |
Revision as of 16:47, 5 January 2022
Contents
Summary Information
- Ownership:
- Website:
- Location:
- Capacity: million tons/annum
- Status:
Brief Description
- TRSP will be located at the Port of Santos, with a licensed nominal regasification capacity of 14 million m³/day, storage of 170,000 m³, and an approximate investment of R$670 million.
- The terminal will use the vessel Hoegh Gannet
Technical Details
- Storage capacity: 170,000 m³
- Unloading capacity:
- Send out capacity:
- Constructor:
Ongoing Projects/Project Status
- Under construction
- Commissioning is scheduled for 2023
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2021 - Hoegh LNG has signed a 10-year charter to provide the vessel
Other Information
-