Difference between revisions of "Dhamra LNG Terminal"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  | 
				Abarrelfull (talk | contribs)   | 
				||
| Line 11: | Line 11: | ||
=== Technical Details ===  | === Technical Details ===  | ||
| − | * Storage capacity:  | + | * Storage capacity: Two full containment type tanks of 180,000 m3  | 
* Unloading capacity:  | * Unloading capacity:  | ||
* Send out capacity:    | * Send out capacity:    | ||
Revision as of 15:29, 30 December 2021
Contents
Summary Information
- Ownership: Dhamra Port Company / IOCL
 - Website: http://www.dhamraport.com/
 - Location: Dhamra, India
 - Capacity: 5 million tons/annum
 - Status: Planned
 
Brief Description
- The Dhamra LNG import terminal is designed for an initial capacity of 5 MTPA, expandable up to 10 MTPA. Initially, it will have two full containment type tanks of 180,000 m3 capacity each.
 
Technical Details
- Storage capacity: Two full containment type tanks of 180,000 m3
 - Unloading capacity:
 - Send out capacity:
 - Constructor:
- Whessoe Engineering: Detailed Engineering & Construction Supervision for the tanks
 - CTCI: Regas Package
 
 
Ongoing Projects/Project Status
- Indian oil is discussing the project with Dhamra Port
 
Suppliers / Customers
- Suppliers:
 - Customers: IOCL refineries at Paradip (in Orissa) and Haldia (in West Bengal) need 2.5 million tons of LNG
 
History
- 2018 - CTCI awarded regasification package
 
Other Information
- -
 
Links
- Whessoe Engineering LNG References
 - East coast to get first LNG import terminal
 - Indian Oil in talks with Dhamra port for LNG terminal
 - IndianOil and GAIL sign MoU for taking equity stake in upcoming Dhamra LNG terminal
 - CTCI Wins Regas Package for LNG Receiving Terminal Project at Dhamra Odisha from Adani Group