Difference between revisions of "Woodside Sangomar FPSO"

From A Barrel Full
Jump to navigation Jump to search
Line 30: Line 30:
  
 
# [https://abarrelfull.blogspot.com/2021/12/modec-awarded-contract-of-fpso-for-sne.html MODEC Awarded Contract of FPSO for SNE Field offshore Senegal]
 
# [https://abarrelfull.blogspot.com/2021/12/modec-awarded-contract-of-fpso-for-sne.html MODEC Awarded Contract of FPSO for SNE Field offshore Senegal]
 +
# [https://abarrelfull.blogspot.com/2021/12/modec-awarded-fpso-purchase-contract.html MODEC Awarded FPSO Purchase Contract for Sangomar Field offshore Senegal]

Revision as of 12:02, 15 December 2021

Summary Information

Brief Description

  • -

Contractors

Status

  • -

History

  • 2019 - MODEC awarded Front-End Engineering Design (FEED) for the FPSO

Other Information

  • -

Links

  1. MODEC Awarded Contract of FPSO for SNE Field offshore Senegal
  2. MODEC Awarded FPSO Purchase Contract for Sangomar Field offshore Senegal