Difference between revisions of "Sangomar Oil and Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (→Links) |
Abarrelfull (talk | contribs) |
||
Line 16: | Line 16: | ||
=== History === | === History === | ||
− | * | + | * 2021 - Woodside increases its stake in the project to over 80% |
=== Geology === | === Geology === |
Revision as of 10:05, 15 December 2021
Summary Information
- Operator: Woodside
- Country: Senegal
- Location:
- Production start: 2023 (expected)
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The Sangomar Field Development Phase 1 will comprise a stand-alone FPSO with a production capacity of approximately 100,000 barrels per day, 23 subsea wells and supporting subsea infrastructure.
Contractors
- -
History
- 2021 - Woodside increases its stake in the project to over 80%