Difference between revisions of "Albacora Leste Oil and Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) (→Links) |
||
| Line 28: | Line 28: | ||
# [http://killajoules.wikidot.com/archive:sembcorp-marine-in-us-357-million-petrobras-p-50-fps SembCorp Marine in US$357 million Petrobras P-50 FPSO deal] | # [http://killajoules.wikidot.com/archive:sembcorp-marine-in-us-357-million-petrobras-p-50-fps SembCorp Marine in US$357 million Petrobras P-50 FPSO deal] | ||
# [http://killajoules.wikidot.com/archive:repsol-ypf-is-partner-in-brazils-largest-oil-platfor Repsol YPF is Partner in Brazil’s Largest Oil Platform] | # [http://killajoules.wikidot.com/archive:repsol-ypf-is-partner-in-brazils-largest-oil-platfor Repsol YPF is Partner in Brazil’s Largest Oil Platform] | ||
| + | # [ President Lula kicks production off at the P-50, the self-sufficiency platform] | ||
# [http://killajoules.wikidot.com/archive:accident-on-platform-p-50/ Accident on Platform P-50] | # [http://killajoules.wikidot.com/archive:accident-on-platform-p-50/ Accident on Platform P-50] | ||
# [http://killajoules.wikidot.com/archive:production-retaken-at-platform-p-50 Production retaken at Platform P-50] | # [http://killajoules.wikidot.com/archive:production-retaken-at-platform-p-50 Production retaken at Platform P-50] | ||
Revision as of 09:13, 9 December 2021
Summary Information
- Operator: Petrobras
- Country: Brazil
- Location: Campos Basin, approximately 120 km off the coast of the state of Rio de Janeiro
- Production start: 2006
- Partners: Repsol
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
Description
- The field utilises the Albacora Leste P-50 FPSO, anchored to the seabed at a depth of 1,240 metres and 120 km from the coast
- There are 16 producing wells and 14 injection wells (all horizontal)
Contractors
- Jurong Shipyard: FPSO conversion including marine hull conversion and engineering, fabrication, installation, integration and commissioning of the topside modules
History
- 1986 - Albacora Leste Oil And Gas Field discovered
- 2002 - Jurong Shipyard awarded FPSO conversion contract
- 2006 - Production starts
- 2007 - A fire on the platform led to a few days disruption. The fire caused no victims or oil leaks to the sea
Geology
Links
- SembCorp Marine in US$357 million Petrobras P-50 FPSO deal
- Repsol YPF is Partner in Brazil’s Largest Oil Platform
- [ President Lula kicks production off at the P-50, the self-sufficiency platform]
- Accident on Platform P-50
- Production retaken at Platform P-50