Difference between revisions of "Tolmount Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Operator: | + | * Operator: Habour Energy |
− | * Country: | + | * Country: UK |
− | * Location: | + | * Location: Southern North Sea |
− | * Production start: | + | * Production start: 2021 |
* Partners: | * Partners: | ||
− | * Type: | + | * Type: Gas |
* Estimated Reserves: | * Estimated Reserves: | ||
− | * Production Volume: | + | * Production Volume: |
=== Description === | === Description === |
Revision as of 11:25, 2 December 2021
Summary Information
- Operator: Habour Energy
- Country: UK
- Location: Southern North Sea
- Production start: 2021
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The Tolmount gas field is situated in Block 42/28d, in the UK southern North Sea.
- Tolmount East is located in Block 42/28d of the southern North Sea. The project comprises a single well development, installation of subsea infrastructure, and a 4-kilometre, 12-inch pipeline tied back to the HGS Tolmount minimum facilities platform.
Contractors
- Rosetti Marino: EPCIC contract for the platform
History
- 2011 - Tolmont field discovered
- 2013 - Appraisal drilling carried out
- 2016 - Premier oil acquired a 50% stake
- 2018 - Rosetti Marino awarded the EPCIC contract for the platform
- 2020 - The HGS Tolmount platform was successfully installed
- 2021 - Tolmont east was sanctioned