* Schiehallion lies in 375 metres water depth in UK blocks 204/20, 204/25a, 204/25b, 205/16 and 205/21b and has recoverable reserves of 340 million barrels of oil.  | * Schiehallion lies in 375 metres water depth in UK blocks 204/20, 204/25a, 204/25b, 205/16 and 205/21b and has recoverable reserves of 340 million barrels of oil.  | ||
| − | * The Schiehallion development centred on 29 seabed wells in four drilling centres, producing oil via manifolds through steel pipelines and then flexible risers into the purpose-built   | + | * The Schiehallion development centred on 29 seabed wells in four drilling centres, producing oil via manifolds through steel pipelines and then flexible risers into the purpose-built [[Schiehallion FPSO]], a floating production, storage and offloading vessel.  | 
* The development was based upon producing 340 million barrels contained within the main field and a further 85 million barrels from the Loyal reservoir which overlies it.    | * The development was based upon producing 340 million barrels contained within the main field and a further 85 million barrels from the Loyal reservoir which overlies it.    | ||
* Peak production of 154,000 barrels of oil a day is expected and the FPSO could store over 900,000 barrels.  | * Peak production of 154,000 barrels of oil a day is expected and the FPSO could store over 900,000 barrels.  | ||
| − | * Gas is transported on the   | + | * Gas is transported on the [[West Of Shetlands Gas Pipeline System]]  | 
| − | * The field is being redeveloped in the   | + | * The field is being redeveloped in the [[Quad 204 Redevelopment Project]] which will utilise the [[Glen Lyon FPSO]], currently under construction  | 
| − | |||
=== Contractors - Original ===  | === Contractors - Original ===  | ||
Revision as of 22:50, 30 November 2021
Summary Information
- Operator: BP
 - Country: UK
 - Location: In the Atlantic, 100 miles to the west of Shetland and Orkney
 - Production start: 1998
 - Partners: Shell - 55%, BP - 33.5%; OMV 11.8%
 - Type: Oil
 - Estimated Reserves: recoverable reserves of 340 million barrels of oil at start up
 - Production Volume:
 
Description
- Schiehallion lies in 375 metres water depth in UK blocks 204/20, 204/25a, 204/25b, 205/16 and 205/21b and has recoverable reserves of 340 million barrels of oil.
 - The Schiehallion development centred on 29 seabed wells in four drilling centres, producing oil via manifolds through steel pipelines and then flexible risers into the purpose-built Schiehallion FPSO, a floating production, storage and offloading vessel.
 - The development was based upon producing 340 million barrels contained within the main field and a further 85 million barrels from the Loyal reservoir which overlies it.
 - Peak production of 154,000 barrels of oil a day is expected and the FPSO could store over 900,000 barrels.
 - Gas is transported on the West Of Shetlands Gas Pipeline System
 - The field is being redeveloped in the Quad 204 Redevelopment Project which will utilise the Glen Lyon FPSO, currently under construction
 
Contractors - Original
- **Brown & Root:** Project management, the design and fabrication of the FPSO's topsides and for the vessel installation
 - **Harland and Wolff:** Design and build the 950,000 barrel capacity vessel
 - **SBM:** Design and build the turret and moorings
 - **Brown & Root McDermott Fabricators (BARMAC):** Fabrication of 6,300 tonnes of process topsides
 - Extended Living Quarter
 - **Coflexip Stena:** Design and supply of Risers
 - **BiFab:**
- Fabrication of Upper Turret for FPSO Including Duplex Process Pipework and the LQ Module
 - Hex Replacement Module
 - Extended Living Quarter
 
 
History
- 1993 - The Schiehallion Oil Field was discovered
 - 1995 - Extended Well Test performed
 - 1996 - The Department of Trade and Industry approved plans to develop the "Schiehallion" oilfield and its satellite "Loyal"
 - 1998 - Production starts
 - 2009 - Technip awarded two contracts for the Schiehallion field
 - 2011 - Quad 204 Redevelopment Project approved by partners
 - 2011 - HHI awarded contract for new FPSO
 - 2012 - Hess Reaches Agreement for Sale of 15.67 % to Shell
 - 2012 - Shell acquired 5.9% from Murphy Oil
 - 2013 - OMV acquires an additional 5.88% from Statoil
 - 2017 - Chrysaor acquired Shell's stake in the field.
 
Geology
Links
- BiFab Platform References
 - Schiehallion Oilfield Development Sanctioned
 - Alliance starts on BP'S 400 million British pound Schiehallion project
 - Oil Production Starts from Schiehallion Field
 - Hess Reaches Agreement for Sale of UK Assets
 - Technip awarded two contracts for the Schiehallion field in the North Sea
 - Hyundai Heavy Wins USD 1.2 Billion FPSO Order
 - BP Prepares for Next Development West of Shetland
 - Schiehallion Field Extended Well Test
 - Shell increases participation in the Schiehallion Field and divests its Canadian Seal assets
 - USD 2.65 bn transaction to capture value and focus the portfolio
 - Shell to sell package of UK North Sea assets to Chrysaor for up to $3.8bn