Difference between revisions of "COTC Yanbu Refinery Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: * Website: * Wiki Page: * Location: * Capacity: million tons/annum & 00,000 bbl/day * Nelson Complexity: * Project Stage: * Expecte...") |
Abarrelfull (talk | contribs) |
||
(8 intermediate revisions by the same user not shown) | |||
Line 4: | Line 4: | ||
* Wiki Page: | * Wiki Page: | ||
* Location: | * Location: | ||
− | * Capacity: million tons/annum & | + | * Capacity: 20 million tons/annum & 400,000 bbl/day |
* Nelson Complexity: | * Nelson Complexity: | ||
− | * Project Stage: | + | * Project Stage: Planning |
− | * Expected Completion: | + | * Expected Completion: 2025 |
* Budget: | * Budget: | ||
+ | |||
=== The Project === | === The Project === | ||
− | * Project Type: | + | * Project Type: The world’s largest fully integrated crude oil to chemicals (COTC) complex |
− | * Project Summary: | + | * Project Summary: The refinery will process 400,000 barrels per day and produce approximately nine million tons of chemicals and base oils annually |
* Main Contractors | * Main Contractors | ||
+ | ** Wood & KBR: Front end engineering design (pre-FEED and FEED) and project management services during the engineering, procurement and construction (EPC) phase | ||
+ | * Licences | ||
** | ** | ||
− | + | ||
− | |||
=== Refining Units === | === Refining Units === | ||
* | * | ||
Line 26: | Line 28: | ||
- | - | ||
=== History === | === History === | ||
− | * | + | * 2018 - Wood & KBR awarded FEED and EPC contracts |
+ | * 2018 - Yanbu was selected as the location for the project | ||
+ | |||
=== Other Information === | === Other Information === | ||
- | - | ||
=== Links === | === Links === | ||
+ | # [https://abarrelfull.blogspot.com/2021/03/saudi-aramco-and-sabic-announce-yanbu.html Saudi Aramco and SABIC announce Yanbu as the site for the development of an integrated industrial complex to convert crude oil to chemicals] | ||
+ | # [https://abarrelfull.blogspot.com/2021/03/wood-wins-new-contract-to-develop.html Wood wins new contract to develop the world’s largest crude oil to chemicals project for Saudi Aramco and SABIC] | ||
+ | # [https://abarrelfull.blogspot.com/2021/03/kbr-wins-contract-to-develop-worlds.html KBR Wins Contract to Develop World's Largest Fully Integrated Crude Oil to Chemicals Project in Saudi Arabia] |
Latest revision as of 16:24, 22 March 2021
Contents
Summary Information
- Ownership:
- Website:
- Wiki Page:
- Location:
- Capacity: 20 million tons/annum & 400,000 bbl/day
- Nelson Complexity:
- Project Stage: Planning
- Expected Completion: 2025
- Budget:
The Project
- Project Type: The world’s largest fully integrated crude oil to chemicals (COTC) complex
- Project Summary: The refinery will process 400,000 barrels per day and produce approximately nine million tons of chemicals and base oils annually
- Main Contractors
- Wood & KBR: Front end engineering design (pre-FEED and FEED) and project management services during the engineering, procurement and construction (EPC) phase
- Licences
Refining Units
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
-
Products Produced
-
History
- 2018 - Wood & KBR awarded FEED and EPC contracts
- 2018 - Yanbu was selected as the location for the project
Other Information
-
Links
- Saudi Aramco and SABIC announce Yanbu as the site for the development of an integrated industrial complex to convert crude oil to chemicals
- Wood wins new contract to develop the world’s largest crude oil to chemicals project for Saudi Aramco and SABIC
- KBR Wins Contract to Develop World's Largest Fully Integrated Crude Oil to Chemicals Project in Saudi Arabia