Difference between revisions of "SIMECO Refining References"
Abarrelfull (talk | contribs) (Created page with "+++ Turn Key # **[[[Sannazzaro De Burgondi Refinery]]]** * Italy * ENI S.p.a Div. R&M * New Vacum Column & Automatic Filtration System on the existing FCC Plant * 11.00...") |
Abarrelfull (talk | contribs) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | + | === Turn Key === | |
+ | * '''[[Sannazzaro de Burgondi Refinery]]''' | ||
+ | ** Italy | ||
+ | ** ENI S.p.a Div. R&M | ||
+ | ** New Vacum Column & Automatic Filtration System on the existing FCC Plant | ||
+ | ** 11.000.000 | ||
+ | ** 2011 -in progress | ||
+ | * '''[[Taranto Refinery]]''' | ||
+ | ** Italy | ||
+ | ** ENI S.p.a Div. R&M | ||
+ | ** Liquid Sulfur Transferline from Refinery Storage to Unit producing Solid Chips | ||
+ | ** 1.100.000 | ||
+ | ** 2010 | ||
+ | * '''[[Sannazzaro de Burgondi Refinery]]''' | ||
+ | ** Italy | ||
+ | ** ENI S.p.a Div. R&M | ||
+ | ** C4 Butylene Stream Dryer Package: Engineering, Material Supply and Construction up to Pre-commissioning | ||
+ | ** 8.500.000 | ||
+ | ** 2008-2009 | ||
+ | * '''[[Sarroch Refinery]]''' | ||
+ | ** Italy | ||
+ | ** POLIMERI EUROPA | ||
+ | ** W.W.T. Covering System and Hydrocarbon Separation Unit by Cryogenic Condensation System in Sarroch Petrochemical Complex | ||
+ | ** 6.000.000 | ||
+ | ** 2007-2008 | ||
+ | * '''[[Milazzo Refinery]]''' | ||
+ | ** Italy | ||
+ | ** ENI S.p.a Div. R&M | ||
+ | ** Marine Loading Arms revamping & replacement on Pier 2 – Mooring 06 bis of the Milazzo Refinery | ||
+ | ** 2.800.000 | ||
+ | ** 2007 | ||
+ | * '''[[Milazzo Refinery]]''' | ||
+ | ** Italy | ||
+ | ** ENI S.p.a Div. R&M | ||
+ | ** Pier 2-Marine Loading Arms revamping: n.4x16” loading arms dismantling and replacement of the Milazzo Refinery Terminal | ||
+ | ** 3.000.000 | ||
+ | ** 2005 | ||
+ | * '''[[Gela Refinery]]''' | ||
+ | ** Italy | ||
+ | ** New Instrumentation System (DCS) for Waste Water Treatment Unit | ||
+ | ** 1.400.000 | ||
+ | ** 2004 | ||
+ | AGIP GAS | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
Railway Loading Arms extension for GPL | Railway Loading Arms extension for GPL | ||
storage and supply of underground tanks for | storage and supply of underground tanks for | ||
Line 44: | Line 48: | ||
3.800.000 2000 | 3.800.000 2000 | ||
− | + | === Engineering === | |
− | |||
− | + | * '''[[Milazzo Refinery]]''' | |
− | + | ** Italy | |
− | + | ** ENI S.p.a Div. R&M | |
− | + | ** KEROSENE DESULPHURIZATION UNIT | |
− | + | ** Front End Engineering Design for Revamping of HDS1 Unit / Raffineria di Milazzo | |
− | + | ** 10.000 | |
− | + | ** 2013 | |
+ | * '''[[Leghorn Livorno Refinery]]''' | ||
TREATED | TREATED | ||
DEASPHALTED | DEASPHALTED | ||
Line 103: | Line 107: | ||
WATER INJECTION SYSTEM , POWER GENERATION PLANT & UTILITY PACKAGES | WATER INJECTION SYSTEM , POWER GENERATION PLANT & UTILITY PACKAGES | ||
− | + | * '''[[Elephant Oil Field]]''' | |
* Libya | * Libya | ||
* ENI Oil Co. Ltd | * ENI Oil Co. Ltd |
Latest revision as of 14:16, 24 March 2020
Turn Key
- Sannazzaro de Burgondi Refinery
- Italy
- ENI S.p.a Div. R&M
- New Vacum Column & Automatic Filtration System on the existing FCC Plant
- 11.000.000
- 2011 -in progress
- Taranto Refinery
- Italy
- ENI S.p.a Div. R&M
- Liquid Sulfur Transferline from Refinery Storage to Unit producing Solid Chips
- 1.100.000
- 2010
- Sannazzaro de Burgondi Refinery
- Italy
- ENI S.p.a Div. R&M
- C4 Butylene Stream Dryer Package: Engineering, Material Supply and Construction up to Pre-commissioning
- 8.500.000
- 2008-2009
- Sarroch Refinery
- Italy
- POLIMERI EUROPA
- W.W.T. Covering System and Hydrocarbon Separation Unit by Cryogenic Condensation System in Sarroch Petrochemical Complex
- 6.000.000
- 2007-2008
- Milazzo Refinery
- Italy
- ENI S.p.a Div. R&M
- Marine Loading Arms revamping & replacement on Pier 2 – Mooring 06 bis of the Milazzo Refinery
- 2.800.000
- 2007
- Milazzo Refinery
- Italy
- ENI S.p.a Div. R&M
- Pier 2-Marine Loading Arms revamping: n.4x16” loading arms dismantling and replacement of the Milazzo Refinery Terminal
- 3.000.000
- 2005
- Gela Refinery
- Italy
- New Instrumentation System (DCS) for Waste Water Treatment Unit
- 1.400.000
- 2004
AGIP GAS
Railway Loading Arms extension for GPL storage and supply of underground tanks for the Livorno Storage Facilities 3.800.000 2000
Engineering
- Milazzo Refinery
- Italy
- ENI S.p.a Div. R&M
- KEROSENE DESULPHURIZATION UNIT
- Front End Engineering Design for Revamping of HDS1 Unit / Raffineria di Milazzo
- 10.000
- 2013
- Leghorn Livorno Refinery
TREATED DEASPHALTED AROMATIC EXTRACT Extended Basic Design Package for a New TDAE Unit / ENI R&M Div., Livorno Refinery (Italy) 10.000 2013 W.W.T. for Water Re-use Multidiscipline Engineering Design for a New Waste Water Treatment Package / ENI S.p.A. Div. R&M 18,000 2011-2012 OFFSHORE PLATFORMS Front End Engineering Design for n° 3 new gas platforms located offshore Adriatic Sea (Italy) and the relevant +/- 15% Cost Estimate /ENI S.p.a E&P Div. 50.000 2010-2011 COMBINED HEAT & POWER PLANT Front End Engineering Design, +/- 15% Cost Estimate and preparation of EPC Tender Documents for Power Plant Revamping located in Bolgiano, San Donato Milanese (Italy) / ENIPOWER. 18.000 2010 RESIDUE HYDROCRACKER Multidiscipline Engineering Design of EST Project- ENI R&M Div. in Sannazzaro Refinery in Italy / SAIPEM S.p.A. 220.000 2009-2012 AMMONIA PLANT/ UTILITY UNITS Multidiscipline Engineering Design of QAFCO5 Project in Qatar/SAIPEM S.p.A. 170.000 2008
OFFSHORE AND MARINE TERMINALS Conceptual Design, Basic Design & FEED for Trans-anatolian Pipeline , Samsun and Cehyan Marine Terminal Oil Storage Facilities in Turkey/ SNAMPROGETTI S.p.A. 90.000 2006-2007
WATER INJECTION SYSTEM , POWER GENERATION PLANT & UTILITY PACKAGES
* Libya * ENI Oil Co. Ltd * Water Injection System & Power Generation Plant Multidiscipline Engineering Design and ITB for EPC of the Elephant Oil Field at the Murzuk Basin * 25.000 * 2005
HYDROFINISHING UNIT & OFFSITE REVAMPING Multidisciplinary Engineering Design of the Lubricants Re-refining Plant -Lodi (Italy)/ VISCOLUBE S.p.A. 50.000 2003