Difference between revisions of "SIMECO Refining References"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "+++ Turn Key # **[[[Sannazzaro De Burgondi Refinery]]]** * Italy * ENI S.p.a Div. R&M * New Vacum Column & Automatic Filtration System on the existing FCC Plant * 11.00...")
 
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
+++ Turn Key
+
=== Turn Key ===
 +
* '''[[Sannazzaro de Burgondi Refinery]]'''
 +
** Italy
 +
** ENI S.p.a Div. R&M
 +
** New Vacum Column & Automatic Filtration System on the existing FCC Plant
 +
** 11.000.000
 +
** 2011 -in progress
 +
* '''[[Taranto Refinery]]'''
 +
** Italy
 +
** ENI S.p.a Div. R&M
 +
** Liquid Sulfur Transferline from Refinery Storage to Unit producing Solid Chips
 +
** 1.100.000
 +
** 2010
 +
* '''[[Sannazzaro de Burgondi Refinery]]'''
 +
** Italy
 +
** ENI S.p.a Div. R&M
 +
** C4 Butylene Stream Dryer Package: Engineering, Material Supply and Construction up to Pre-commissioning
 +
** 8.500.000
 +
** 2008-2009
 +
* '''[[Sarroch Refinery]]'''
 +
** Italy
 +
** POLIMERI EUROPA
 +
** W.W.T. Covering System and Hydrocarbon Separation Unit by Cryogenic Condensation System in Sarroch Petrochemical Complex
 +
** 6.000.000
 +
** 2007-2008
 +
* '''[[Milazzo Refinery]]'''
 +
** Italy
 +
** ENI S.p.a Div. R&M
 +
** Marine Loading Arms revamping & replacement on Pier 2 – Mooring 06 bis of the Milazzo Refinery
 +
** 2.800.000
 +
** 2007
 +
* '''[[Milazzo Refinery]]'''
 +
** Italy
 +
** ENI S.p.a Div. R&M
 +
** Pier 2-Marine Loading Arms revamping: n.4x16” loading arms dismantling and replacement of the Milazzo Refinery Terminal
 +
** 3.000.000
 +
** 2005
 +
* '''[[Gela Refinery]]'''
 +
** Italy
 +
** New Instrumentation System (DCS) for Waste Water Treatment Unit
 +
** 1.400.000
 +
** 2004
 +
AGIP GAS
  
# **[[[Sannazzaro De Burgondi Refinery]]]**
 
* Italy
 
* ENI S.p.a Div. R&M
 
* New Vacum Column & Automatic Filtration System on the existing FCC Plant
 
* 11.000.000
 
* 2011 -in progress
 
# **[[[Taranto Refinery]]]**
 
* Italy
 
* ENI S.p.a Div. R&M
 
* Liquid Sulfur Transferline from Refinery Storage to Unit producing Solid Chips
 
* 1.100.000
 
* 2010
 
# **[[[Sannazzaro De Burgondi Refinery]]]**
 
* Italy
 
* ENI S.p.a Div. R&M
 
* C4 Butylene Stream Dryer Package: Engineering, Material Supply and Construction up to Pre-commissioning
 
* 8.500.000
 
* 2008-2009
 
POLIMERI EUROPA
 
W.W.T. Covering System and Hydrocarbon
 
Separation Unit by Cryogenic Condensation
 
System in Sarroch Petrochemical Complex
 
6.000.000 2007-2008
 
# **[[[Milazzo Refinery]]]**
 
* Italy
 
* ENI S.p.a Div. R&M
 
* Marine Loading Arms revamping & replacement on Pier 2 – Mooring 06 bis of the Milazzo Refinery
 
* 2.800.000
 
* 2007
 
# **[[[Milazzo Refinery]]]**
 
* Italy
 
* ENI S.p.a Div. R&M
 
* Pier 2-Marine Loading Arms revamping: n.4x16” loading arms dismantling and replacement of the Milazzo Refinery Terminal
 
* 3.000.000
 
* 2005
 
RAFFINERIA DI GELA New Instrumentation System (DCS) for Waste
 
Water Treatment Unit of the Gela Refinery 1.400.000 2004
 
AGIP GAS
 
 
Railway Loading Arms extension for GPL  
 
Railway Loading Arms extension for GPL  
 
storage and supply of underground tanks for  
 
storage and supply of underground tanks for  
Line 44: Line 48:
 
3.800.000 2000
 
3.800.000 2000
  
+++ Engineering
+
=== Engineering ===
 
 
  
# **[[[Milazzo Refinery]]]**
+
* '''[[Milazzo Refinery]]'''
* Italy
+
** Italy
* ENI S.p.a Div. R&M  
+
** ENI S.p.a Div. R&M  
* KEROSENE DESULPHURIZATION UNIT
+
** KEROSENE DESULPHURIZATION UNIT
* Front End Engineering Design for Revamping of HDS1 Unit / Raffineria di Milazzo
+
** Front End Engineering Design for Revamping of HDS1 Unit / Raffineria di Milazzo
* 10.000
+
** 10.000
* 2013
+
** 2013
 +
* '''[[Leghorn Livorno Refinery]]'''
 
TREATED  
 
TREATED  
 
DEASPHALTED  
 
DEASPHALTED  
Line 103: Line 107:
 
WATER INJECTION SYSTEM , POWER GENERATION PLANT & UTILITY PACKAGES
 
WATER INJECTION SYSTEM , POWER GENERATION PLANT & UTILITY PACKAGES
  
# **[[[Elephant Oil Field]]]**
+
* '''[[Elephant Oil Field]]'''
 
  * Libya
 
  * Libya
 
  * ENI Oil Co. Ltd
 
  * ENI Oil Co. Ltd

Latest revision as of 14:16, 24 March 2020

Turn Key

  • Sannazzaro de Burgondi Refinery
    • Italy
    • ENI S.p.a Div. R&M
    • New Vacum Column & Automatic Filtration System on the existing FCC Plant
    • 11.000.000
    • 2011 -in progress
  • Taranto Refinery
    • Italy
    • ENI S.p.a Div. R&M
    • Liquid Sulfur Transferline from Refinery Storage to Unit producing Solid Chips
    • 1.100.000
    • 2010
  • Sannazzaro de Burgondi Refinery
    • Italy
    • ENI S.p.a Div. R&M
    • C4 Butylene Stream Dryer Package: Engineering, Material Supply and Construction up to Pre-commissioning
    • 8.500.000
    • 2008-2009
  • Sarroch Refinery
    • Italy
    • POLIMERI EUROPA
    • W.W.T. Covering System and Hydrocarbon Separation Unit by Cryogenic Condensation System in Sarroch Petrochemical Complex
    • 6.000.000
    • 2007-2008
  • Milazzo Refinery
    • Italy
    • ENI S.p.a Div. R&M
    • Marine Loading Arms revamping & replacement on Pier 2 – Mooring 06 bis of the Milazzo Refinery
    • 2.800.000
    • 2007
  • Milazzo Refinery
    • Italy
    • ENI S.p.a Div. R&M
    • Pier 2-Marine Loading Arms revamping: n.4x16” loading arms dismantling and replacement of the Milazzo Refinery Terminal
    • 3.000.000
    • 2005
  • Gela Refinery
    • Italy
    • New Instrumentation System (DCS) for Waste Water Treatment Unit
    • 1.400.000
    • 2004

AGIP GAS

Railway Loading Arms extension for GPL storage and supply of underground tanks for the Livorno Storage Facilities 3.800.000 2000

Engineering

TREATED DEASPHALTED AROMATIC EXTRACT Extended Basic Design Package for a New TDAE Unit / ENI R&M Div., Livorno Refinery (Italy) 10.000 2013 W.W.T. for Water Re-use Multidiscipline Engineering Design for a New Waste Water Treatment Package / ENI S.p.A. Div. R&M 18,000 2011-2012 OFFSHORE PLATFORMS Front End Engineering Design for n° 3 new gas platforms located offshore Adriatic Sea (Italy) and the relevant +/- 15% Cost Estimate /ENI S.p.a E&P Div. 50.000 2010-2011 COMBINED HEAT & POWER PLANT Front End Engineering Design, +/- 15% Cost Estimate and preparation of EPC Tender Documents for Power Plant Revamping located in Bolgiano, San Donato Milanese (Italy) / ENIPOWER. 18.000 2010 RESIDUE HYDROCRACKER Multidiscipline Engineering Design of EST Project- ENI R&M Div. in Sannazzaro Refinery in Italy / SAIPEM S.p.A. 220.000 2009-2012 AMMONIA PLANT/ UTILITY UNITS Multidiscipline Engineering Design of QAFCO5 Project in Qatar/SAIPEM S.p.A. 170.000 2008

OFFSHORE AND MARINE TERMINALS Conceptual Design, Basic Design & FEED for Trans-anatolian Pipeline , Samsun and Cehyan Marine Terminal Oil Storage Facilities in Turkey/ SNAMPROGETTI S.p.A. 90.000 2006-2007

WATER INJECTION SYSTEM , POWER GENERATION PLANT & UTILITY PACKAGES

* Libya
* ENI Oil Co. Ltd
* Water Injection System & Power Generation Plant Multidiscipline Engineering Design and ITB for EPC of the Elephant Oil Field at the Murzuk Basin
* 25.000
* 2005

HYDROFINISHING UNIT & OFFSITE REVAMPING Multidisciplinary Engineering Design of the Lubricants Re-refining Plant -Lodi (Italy)/ VISCOLUBE S.p.A. 50.000 2003