Difference between revisions of "Volgograd Refinery"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Ownership: Lukoil * Website: http://www.lukoil.com/ * List of Lukoil Refineries * Location: Volvograd, Southern Russia * Capacity: 11.25 mill...")
 
Line 20: Line 20:
 
* Gasoline, Diesel, Lubricants, Fuel oil, Jet fuel
 
* Gasoline, Diesel, Lubricants, Fuel oil, Jet fuel
 
=== Projects ===
 
=== Projects ===
 +
* In 2016 an upgrading project was completed
 +
* The project replaced old units and increased the capacity of the refinery
 
* For full details see [[Volgograd Refinery Project]]
 
* For full details see [[Volgograd Refinery Project]]
It is planned to increase the production of high-octane petrol.
+
 
The enterprise’s capacity will increase from 10.5 to 12-14 million tons per year by 2014.
 
This will allow satisfying the needs of the Southern federal region. As a result of a complete upgrade of the enterprise, the depth of oil refining will increase from 83 to 95 percent.
 
 
=== Other Information ===
 
=== Other Information ===
 
-
 
-

Revision as of 18:42, 19 March 2020

Summary Information

Refining Units

  • Crude distillation 225 bpd
  • Vacuum distillation 68.2 bpd
  • Coking 18.5 bpd
  • Catalytic reforming 43.7 bpd
  • Catalytic hydrotreating 95.9 bpd

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

=== Products Produced

  • Gasoline, Diesel, Lubricants, Fuel oil, Jet fuel

Projects

  • In 2016 an upgrading project was completed
  • The project replaced old units and increased the capacity of the refinery
  • For full details see Volgograd Refinery Project

Other Information

-

History

  • 1957 - The Refinery was put into operation
  • 1973 - Crude oil processing unit added
  • 1979 - Sulfur recovery unit commissioned
  • 1991 - the Refinery entered LUKOIL Group
  • 1994 - equipment for crude distillation and gasoline reforming was rebuilt.
  • 1997–1998 the Refinery launched automatic equipment for blending of gasolines and a rail trestle for crude oil discharge
  • In 1998–2001 the Refinery launched equipment for hydrotreatment of diesel fuel, naphta stabilization and fractioning of saturated hydrocarbon gases.
  • 2004–2006 the first stage of a coke calcination facility was completed. The Refinery completed construction of a catalytic reforming unit.
  • In 2007 an isomerization unit with annual capacity of 380,000 tons was commissioned.
  • In 2008 the vacuum block on distillation unit №6 was commissioned after an upgrade. The Refinery switched to production of motor gasolines to Euro-3 standard.
  • In 2009 a unit for production of inert gas was brought into operation and a steam recuperation unit was commissioned at the oil loading rack. EKTO diesel fuel production was started.

Links

  1. Lukoil Refinery Facts
  2. Giprogazoochistka Refinery References
  3. Globalstroy Engineering Refinery References
  4. Orghim Refinery References