Difference between revisions of "ADCC Gas Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 25: | Line 25: | ||
[[category:Pipeline]] | [[category:Pipeline]] | ||
[[category:USA]] | [[category:USA]] | ||
− | [[category: | + | [[category:WhiteWater]] |
Revision as of 11:35, 13 May 2024
Summary Information
- Source: Agua Dulce
- Destination: Corpus Christi
- Ownership: WhiteWater Midstream
- Website: https://whitewatermidstream.com/
- Length: kilometres (40 miles)
- Capacity: per day
- Status: Under construction
Details
- The project is a 40-mile, 42-inch proposed intrastate pipeline designed to transport 1.7 Bcf/d of natural gas from the terminus of the Whistler Gas Pipeline in Agua Dulce, TX to Cheniere's Corpus Christi LNG Terminal
History
- 2022 - WhiteWater Midstream and Cheniere Energy announced pipeline JV
- 2024 - Enbridge became a partner in the pipeline
Other Information
- -