Difference between revisions of "ADCC Gas Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Source: * Destination: * Ownership: * Website: * Length: kilometres ( miles) * Capacity: per day * Status: (Operating/Planned/Under Cons...") |
Abarrelfull (talk | contribs) |
||
Line 7: | Line 7: | ||
* Length: kilometres ( miles) | * Length: kilometres ( miles) | ||
* Capacity: per day | * Capacity: per day | ||
− | * Status: | + | * Status: Planned |
=== Details === | === Details === | ||
− | * - | + | * The project is a 40-mile, 42-inch proposed intrastate pipeline designed to transport 1.7 Bcf/d of natural gas from the terminus of the [[Whistler Gas Pipeline]] in Agua Dulce, TX to Cheniere's [[Corpus Christi LNG Terminal]] |
=== History === | === History === | ||
− | * - | + | * 2024 - Enbridge became a partner in the pipeline |
=== Other Information === | === Other Information === | ||
Line 19: | Line 19: | ||
=== Links === | === Links === | ||
− | # [] | + | # [https://abarrelfull.blogspot.com/2024/05/enbridge-to-enter-into-jv-connecting.html Enbridge to Enter into JV Connecting Permian Basin Natural Gas Supply to Growing LNG and USGC Demand] |
[[category:Pipeline]] | [[category:Pipeline]] | ||
[[category:Country]] | [[category:Country]] | ||
[[category:Company]] | [[category:Company]] |
Revision as of 10:03, 13 May 2024
Summary Information
- Source:
- Destination:
- Ownership:
- Website:
- Length: kilometres ( miles)
- Capacity: per day
- Status: Planned
Details
- The project is a 40-mile, 42-inch proposed intrastate pipeline designed to transport 1.7 Bcf/d of natural gas from the terminus of the Whistler Gas Pipeline in Agua Dulce, TX to Cheniere's Corpus Christi LNG Terminal
History
- 2024 - Enbridge became a partner in the pipeline
Other Information
- -