Difference between revisions of "ADCC Gas Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 20: | Line 20: | ||
=== Links === | === Links === | ||
− | # [https://abarrelfull.blogspot.com/2024/05/whistler-pipeline-announces-new-joint.html ] | + | # [https://abarrelfull.blogspot.com/2024/05/whistler-pipeline-announces-new-joint.html Whistler Pipeline Announces a New Joint Venture Pipeline With Cheniere] |
# [https://abarrelfull.blogspot.com/2024/05/enbridge-to-enter-into-jv-connecting.html Enbridge to Enter into JV Connecting Permian Basin Natural Gas Supply to Growing LNG and USGC Demand] | # [https://abarrelfull.blogspot.com/2024/05/enbridge-to-enter-into-jv-connecting.html Enbridge to Enter into JV Connecting Permian Basin Natural Gas Supply to Growing LNG and USGC Demand] | ||
Latest revision as of 16:24, 13 May 2024
Summary Information
- Source: Agua Dulce
- Destination: Corpus Christi
- Ownership: WhiteWater Midstream
- Website: https://whitewatermidstream.com/
- Length: kilometres (40 miles)
- Capacity: per day
- Status: Under construction
Details
- The project is a 40-mile, 42-inch proposed intrastate pipeline designed to transport 1.7 Bcf/d of natural gas from the terminus of the Whistler Gas Pipeline in Agua Dulce, TX to Cheniere's Corpus Christi LNG Terminal
History
- 2022 - WhiteWater Midstream and Cheniere Energy announced pipeline JV
- 2024 - Enbridge became a partner in the pipeline
Other Information
- -