Grassy Point Woodside LNG Export Terminal Project
Jump to navigation
Jump to search
Summary Information
Brief Description
- The Grassy Point LNG facility (the Project) is planned to be constructed and operated in two distinct phases. Phase 1 of the Project involves the construction of LNG trains, with an LNG capacity of between 6 and 15 Mtpa of LNG, supporting infrastructure including jetties and a materials offloading facility, power generation, water supply, sanitary waste treatment, access roads and workforce accommodation.
- Phase 2 is expected to involve the installation of additional LNG Trains and associated supporting infrastructure at the site up to the nominal 20 Mtpa LNG. The capacity of each train is expected to be between 3 and 6.5 Mtpa.
Technical Details
- Storage capacity:
- Constructor:
- Licensor:
Ongoing Projects/Project Status
Suppliers / Customers
History
- 2015 - NEB approves LNG export licence]
- 2018 - Application withdrawn
Other Information
Links
- Project Description
- Environmental Assessment
- NEB approves Woodside Energy LNG export licence