<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>http://www.abarrelfull.co.uk/index.php?action=history&amp;feed=atom&amp;title=Siri_Oil_Field</id>
	<title>Siri Oil Field - Revision history</title>
	<link rel="self" type="application/atom+xml" href="http://www.abarrelfull.co.uk/index.php?action=history&amp;feed=atom&amp;title=Siri_Oil_Field"/>
	<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Siri_Oil_Field&amp;action=history"/>
	<updated>2026-06-20T03:19:31Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.33.1</generator>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Siri_Oil_Field&amp;diff=67358&amp;oldid=prev</id>
		<title>Abarrelfull: Created page with &quot;Summary Information * Operator: Ineos * Country: Denmark  * Location: * Production start: 1999 * Partners: * Type: Oil  * Estimated Reserves: * Production Volume:  +++ Descrip...&quot;</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Siri_Oil_Field&amp;diff=67358&amp;oldid=prev"/>
		<updated>2022-12-29T10:27:57Z</updated>

		<summary type="html">&lt;p&gt;Created page with &amp;quot;Summary Information * Operator: Ineos * Country: Denmark  * Location: * Production start: 1999 * Partners: * Type: Oil  * Estimated Reserves: * Production Volume:  +++ Descrip...&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;Summary Information&lt;br /&gt;
* Operator: Ineos&lt;br /&gt;
* Country: Denmark &lt;br /&gt;
* Location:&lt;br /&gt;
* Production start: 1999&lt;br /&gt;
* Partners:&lt;br /&gt;
* Type: Oil &lt;br /&gt;
* Estimated Reserves:&lt;br /&gt;
* Production Volume:&lt;br /&gt;
&lt;br /&gt;
+++ Description&lt;br /&gt;
* Siri and Stine segment 2 (SCA) comprise a combined wellhead, processing and accommodation platform.&lt;br /&gt;
* The processing facilities consist of a plant that separates the hydrocarbons produced and a plant for processing the water produced. The platform also houses equipment for co-injecting gas and water.&lt;br /&gt;
* Stine segment 1 (SCB) is developed as a satellite to the Siri platform and consists of two subsea installations with a production well and an injection well.&lt;br /&gt;
* Production from SCB is conveyed to the Siri platform for processing. &lt;br /&gt;
* The Siri platform also supplies injection water and lift gas to the satellite installations at SCB, Nini and [[[Cecilie Oil Field | Cecilie]]]. Injection water is supplied to SCB via a branch of the water pipeline leading to Nini.&lt;br /&gt;
* The oil produced is piped to a 50,000 m³ storage tank on the seabed, and subsequently transferred to a tanker by means of buoy-loading facilities.&lt;br /&gt;
&lt;br /&gt;
+++ Contractors&lt;br /&gt;
* **Wilton Engineering:** Fabricating large caisson clamps &lt;br /&gt;
* **Aker Maritime:** Siri Storage Tank&lt;br /&gt;
&lt;br /&gt;
+++ History&lt;br /&gt;
* 1995 - Siri Oil Field discovered&lt;br /&gt;
* 1999 - First production&lt;br /&gt;
* 2005 - Talisman acquires Paladin, getting a stake the field&lt;br /&gt;
* 2009 - DONG Energy decided to stop production from the Siri platform. The decision was effectuated after a routine inspection revealing cracks in a subsea structure connected to the oil storage tank below the Siri platform&lt;br /&gt;
* 2011 - Noreco sold its share of the field to DONG&lt;br /&gt;
* 2017 - Ineos acquired a stake from DONG&lt;br /&gt;
&lt;br /&gt;
+++ Geology&lt;br /&gt;
* The Siri Field is a structural trap with a Paleocene sandstone reservoir. The accumulation consists of oil with a relatively low content of gas.&lt;br /&gt;
&lt;br /&gt;
+++ Links&lt;br /&gt;
&lt;br /&gt;
# [http://www.ens.dk/Documents/Netboghandel%20-%20publikationer/Olie-%20og%20gasressourcer/2009/HTML/dogp08_uk/html/kap10.htm Appendix B: Producing fields, ENS, 2008 Report]&lt;br /&gt;
# [[[FoundOcean Europe Subsea References]]]&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:talisman-to-acquire-paladin-resources-plc-for-pounds Talisman to Acquire Paladin Resources Plc for Pounds Sterling 1,218 Million 'C$2,521 Million']&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:temporary-stop-of-production-on-the-siri-platform/ Temporary stop of production on the Siri-platform]&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:sale-of-siri-field-completed/ Sale of Siri field completed]&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:wilton-engineering-secures-major-north-sea-project-w/ Wilton Engineering Secures Major North Sea Project with Subsea 7]&lt;br /&gt;
# [https://abarrelfull.blogspot.com/2022/12/ineos-to-buy-entire-oil-gas-business.html INEOS to buy the entire Oil &amp;amp; Gas business from DONG Energy A/S for a headline price of $1.05 billion plus $250m contingent]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
</feed>