<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>http://www.abarrelfull.co.uk/index.php?action=history&amp;feed=atom&amp;title=Ruwais_Refinery_Project_Expansion_and_Upgrade</id>
	<title>Ruwais Refinery Project Expansion and Upgrade - Revision history</title>
	<link rel="self" type="application/atom+xml" href="http://www.abarrelfull.co.uk/index.php?action=history&amp;feed=atom&amp;title=Ruwais_Refinery_Project_Expansion_and_Upgrade"/>
	<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Ruwais_Refinery_Project_Expansion_and_Upgrade&amp;action=history"/>
	<updated>2026-07-30T11:07:41Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.33.1</generator>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Ruwais_Refinery_Project_Expansion_and_Upgrade&amp;diff=265&amp;oldid=prev</id>
		<title>Abarrelfull: Created page with &quot;Summary Information Ownership: Takreer (Abu Dhabi National Oil Company) Website: http://www.takreer.com/ Wiki Page: Al Ruwais Refinery Location: Ruwais, Abu Dhabi Capacity: 20...&quot;</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Ruwais_Refinery_Project_Expansion_and_Upgrade&amp;diff=265&amp;oldid=prev"/>
		<updated>2020-01-31T16:59:36Z</updated>

		<summary type="html">&lt;p&gt;Created page with &amp;quot;Summary Information Ownership: Takreer (Abu Dhabi National Oil Company) Website: http://www.takreer.com/ Wiki Page: Al Ruwais Refinery Location: Ruwais, Abu Dhabi Capacity: 20...&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;Summary Information&lt;br /&gt;
Ownership: Takreer (Abu Dhabi National Oil Company)&lt;br /&gt;
Website: http://www.takreer.com/&lt;br /&gt;
Wiki Page: Al Ruwais Refinery&lt;br /&gt;
Location: Ruwais, Abu Dhabi&lt;br /&gt;
Capacity: 20 million tons/annum &amp;amp; 400,000 bbl/day&lt;br /&gt;
Nelson Complexity:&lt;br /&gt;
Project Stage: Completed&lt;br /&gt;
Expected Completion: 2015&lt;br /&gt;
Budget: $10 Billion&lt;br /&gt;
The Project&lt;br /&gt;
Project Type: Expansion / Upgrade&lt;br /&gt;
Project Summary: The company will raise its refining capacity at the site by 400,000 barrels a day (b/d), by constructing the new refinery to operate alongside the existing 417,000-b/d facility.&lt;br /&gt;
Main Contractors:&lt;br /&gt;
Foster Wheeler: Detailed feasibility study&lt;br /&gt;
Shaw,&lt;br /&gt;
GS Engineering and Construction: Packages II and VII - RFCC and Port&lt;br /&gt;
Samsung Engineering Co. Ltd. : EPC on a LSTK (lump sum turn-key) basis for package number 3 - Utilities&lt;br /&gt;
Daewoo Engineering '&amp;amp;' Construction: Tank Farm&lt;br /&gt;
Licences:&lt;br /&gt;
UOP: Unicracking, Distillate Unionfining, Merox, BenSat and Naphtha Hydrotreating licences&lt;br /&gt;
Axens: RFCC, LPG treatment, Isomerization and Prime-G+&lt;br /&gt;
Refining Units&lt;br /&gt;
Unsaturated LPG treatment unit – 59,800 bbl/day&lt;br /&gt;
C4-cut purification system – 37,800 bbl/day&lt;br /&gt;
Residue fluid catalytic cracker (RFCC) - 127,100 bbl/day&lt;br /&gt;
Butane Isomerization unit – 26,000 bbl/day&lt;br /&gt;
Naphtha hydrotreater – 40,930 bbl/day&lt;br /&gt;
Delayed Coker&lt;br /&gt;
Slurry Hydro-desulphurization Unit&lt;br /&gt;
Carbon Black Unit&lt;br /&gt;
Distillate Hydro Treating Unit&lt;br /&gt;
Propane Dehydrogenation Unit&lt;br /&gt;
Coke calcification Unit&lt;br /&gt;
Terminal Capacity&lt;br /&gt;
Consists of 76 tanks and able to store 4,493,031 m3&lt;br /&gt;
Crude Supply&lt;br /&gt;
Domestic Crude&lt;br /&gt;
Products Produced&lt;br /&gt;
The refinery will produce propylene, unleaded gasoline, naphtha, liquefied petroleum gas (LPG), aviation turbine fuel, kerosene, gas-oil &amp;amp; bunker fuel&lt;br /&gt;
History&lt;br /&gt;
2006 - Foster Wheeler awarded feasibility study&lt;br /&gt;
2008 - UOP chosen for clean fuels technology licences&lt;br /&gt;
2008 - Axens awarded RFCC and related units&lt;br /&gt;
2009 - Daewoo awarded tank farm package&lt;br /&gt;
2010 - EPC contracts awarded for major construction packages&lt;br /&gt;
2011 - Front End Engineering and Design (FEED) and license packages for Carbon Black &amp;amp; Delayed Coker Awarded&lt;br /&gt;
2015 - The project was completed&lt;br /&gt;
Other Information&lt;br /&gt;
-&lt;br /&gt;
Relevant Links&lt;br /&gt;
Bidding Process Launched&lt;br /&gt;
Foster Wheeler Awarded UAE Refinery Feasibility Studies by Takreer&lt;br /&gt;
Axens Awarded Basic Engineering Design and Licenses for the Takreer Ruwais Refinery Expansion Project&lt;br /&gt;
Samsung Engineering signs official contract for a $2.7 billion USD refinery plant order in the UAE&lt;br /&gt;
Daewoo E&amp;amp;C Wins Ruwais Refinery Expansion Project Worth USD 1.17 Billion from UAE&lt;br /&gt;
Korean Builders Win Record Refinery Deals in UAE&lt;br /&gt;
UOP Technology Selected by Abu Dhabi Oil Refining Company for Refinery Expansion in United Arab Emirates&lt;br /&gt;
Adnoc News&lt;br /&gt;
Honeywell UOP To Supply Its 1,000th Hydrogen Purification System&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
</feed>