<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>http://www.abarrelfull.co.uk/index.php?action=history&amp;feed=atom&amp;title=Peciko_Gas_Field</id>
	<title>Peciko Gas Field - Revision history</title>
	<link rel="self" type="application/atom+xml" href="http://www.abarrelfull.co.uk/index.php?action=history&amp;feed=atom&amp;title=Peciko_Gas_Field"/>
	<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Peciko_Gas_Field&amp;action=history"/>
	<updated>2026-05-03T10:29:29Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.33.1</generator>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Peciko_Gas_Field&amp;diff=72025&amp;oldid=prev</id>
		<title>Abarrelfull: Created page with &quot;Summary Information * Operator: Total * Country: Indonesia  * Location: Offshore Mahakam Block -3.36  * Production start: 1999 * Partners: Total - 50%, Inpex - 50% * Type: Gas...&quot;</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Peciko_Gas_Field&amp;diff=72025&amp;oldid=prev"/>
		<updated>2023-12-12T14:26:10Z</updated>

		<summary type="html">&lt;p&gt;Created page with &amp;quot;Summary Information * Operator: Total * Country: Indonesia  * Location: Offshore Mahakam Block -3.36  * Production start: 1999 * Partners: Total - 50%, Inpex - 50% * Type: Gas...&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;Summary Information&lt;br /&gt;
* Operator: Total&lt;br /&gt;
* Country: Indonesia &lt;br /&gt;
* Location: Offshore Mahakam Block -3.36 &lt;br /&gt;
* Production start: 1999&lt;br /&gt;
* Partners: Total - 50%, Inpex - 50%&lt;br /&gt;
* Type: Gas &amp;amp; Condensate&lt;br /&gt;
* Estimated Reserves: 6.2 trillion cubic feet (tcf)&lt;br /&gt;
* Production Volume: &lt;br /&gt;
&lt;br /&gt;
+++ Description&lt;br /&gt;
* Peciko gas field is located offshore from the Mahakam river delta, on the East Kalimantan &lt;br /&gt;
* The gas is transported through a 25-kilometer pipeline to an onshore processing plant in the Senipah area, where the gas undergoes preprocessing before being transmitted to the [[Bontang LNG Terminal]] through an 80-kilometer pipeline for liquefaction.&lt;br /&gt;
* Phase 1 included 2 production platforms&lt;br /&gt;
&lt;br /&gt;
+++ Contractors&lt;br /&gt;
* **Punj Lloyd:** Phase 4 -  Engineering, procurement and supply of materials, construction, pre-commissioning and commissioning assistance for two gas compression trains at onshore plant at Senipah on EPC basis, with a gas capacity of 450 MMSCFD for each train&lt;br /&gt;
* **PT Nippon Steel Construction Indonesia:** EPCI Contract to construct and install one offshore SWP-F platform (3,400 ton) and subsea pipeline (20” x 4.7km) for Peciko Phase 5 &lt;br /&gt;
* **Saipem:** Field Development Phase IV (PCK 4 EPSC2) - platforms and sealines&lt;br /&gt;
&lt;br /&gt;
+++ History&lt;br /&gt;
* 1997 - PSC signed&lt;br /&gt;
* 1999 - First gas produced&lt;br /&gt;
&lt;br /&gt;
+++ Geology&lt;br /&gt;
* &lt;br /&gt;
&lt;br /&gt;
+++ Links&lt;br /&gt;
# [[Indonesia Exploration And Production Blocks]]&lt;br /&gt;
# [[Punj Lloyd Refining References]]&lt;br /&gt;
# [[Saipem Pipeline References]]&lt;br /&gt;
# [[Saipem Fixed Offshore Production Facilities Project References]]&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:total-inaugurates-peciko-gas-field-in-east-kalimanta Total inaugurates Peciko gas field in East Kalimantan]&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:pt-nippon-steel-construction-indonesia-is-awarded-fo PT Nippon Steel Construction Indonesia is awarded for Peciko by Total E&amp;amp;P Indonesie]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
</feed>