<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>http://www.abarrelfull.co.uk/index.php?action=history&amp;feed=atom&amp;title=Kharyaga_Oil_Field</id>
	<title>Kharyaga Oil Field - Revision history</title>
	<link rel="self" type="application/atom+xml" href="http://www.abarrelfull.co.uk/index.php?action=history&amp;feed=atom&amp;title=Kharyaga_Oil_Field"/>
	<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Kharyaga_Oil_Field&amp;action=history"/>
	<updated>2026-04-30T08:03:41Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.33.1</generator>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Kharyaga_Oil_Field&amp;diff=72882&amp;oldid=prev</id>
		<title>Abarrelfull: Created page with &quot;Summary Information * Operator: Total * Country: Russia  * Location: Nenets Autonomous Territory * Production start:  * Partners: Total - 40%, Statoil (30%), Zarubezhneft (20%...&quot;</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Kharyaga_Oil_Field&amp;diff=72882&amp;oldid=prev"/>
		<updated>2024-02-14T10:41:00Z</updated>

		<summary type="html">&lt;p&gt;Created page with &amp;quot;Summary Information * Operator: Total * Country: Russia  * Location: Nenets Autonomous Territory * Production start:  * Partners: Total - 40%, Statoil (30%), Zarubezhneft (20%...&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;Summary Information&lt;br /&gt;
* Operator: Total&lt;br /&gt;
* Country: Russia &lt;br /&gt;
* Location: Nenets Autonomous Territory&lt;br /&gt;
* Production start: &lt;br /&gt;
* Partners: Total - 40%, Statoil (30%), Zarubezhneft (20%) and Nenets Oil Company (10%)&lt;br /&gt;
* Type: Oil &lt;br /&gt;
* Estimated Reserves: &lt;br /&gt;
* Production Volume: 30,000 boe per day&lt;br /&gt;
&lt;br /&gt;
+++ Description&lt;br /&gt;
* The Kharyaga oil field lies 60 km north of the Polar Circle, in the Nenets Autonomous Territory&lt;br /&gt;
* Kharyaga Development Project Phase III involves progressively increasing the water injection capacity, developing additional reserves, improving plant operability, sustaining an output of 30,000 barrels a day, achieving 95% associated gas utilization and eliminating flaring&lt;br /&gt;
&lt;br /&gt;
+++ Contractors&lt;br /&gt;
* **SNC-Lavalin:** Detailed engineering and procurement for Phase III Package 4 &lt;br /&gt;
&lt;br /&gt;
+++ History&lt;br /&gt;
* 1999 - Kharyaga production sharing agreement (PSA) signed&lt;br /&gt;
* 2007 - The development plan for phase 3 of the Kharyaga field was approved&lt;br /&gt;
* 2009 - Zarubezhneft acquires a 20% stake&lt;br /&gt;
&lt;br /&gt;
+++ Geology&lt;br /&gt;
* &lt;br /&gt;
&lt;br /&gt;
+++ Links&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:total-transfers-a-10-interest-in-russias-kharyaga-fi Total transfers a 10% interest in Russia’s Kharyaga field to Zarubezhneft]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:881 SNC-Lavalin Awarded Detailed Engineering And Procurement For Total’s Kharyaga Field In Arctic Russia]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:1394 Total and Novatek to join forces for development of Yamal LNG]&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:dietsmann-awarded-maintenance-engineering-and-inspec Dietsmann awarded Maintenance Engineering and Inspection contract in Kharyaga]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
</feed>