<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>http://www.abarrelfull.co.uk/index.php?action=history&amp;feed=atom&amp;title=Katy_Gas_Field</id>
	<title>Katy Gas Field - Revision history</title>
	<link rel="self" type="application/atom+xml" href="http://www.abarrelfull.co.uk/index.php?action=history&amp;feed=atom&amp;title=Katy_Gas_Field"/>
	<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Katy_Gas_Field&amp;action=history"/>
	<updated>2026-07-27T02:24:19Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.33.1</generator>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Katy_Gas_Field&amp;diff=69484&amp;oldid=prev</id>
		<title>Abarrelfull: Created page with &quot;Summary Information * Operator: ConocoPhillips * Country: UK  * Location: Southern North Sea * Production start: 2013 * Partners: GDF Suez, Tullow * Type: Gas * Estimated Rese...&quot;</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Katy_Gas_Field&amp;diff=69484&amp;oldid=prev"/>
		<updated>2023-09-03T15:46:31Z</updated>

		<summary type="html">&lt;p&gt;Created page with &amp;quot;Summary Information * Operator: ConocoPhillips * Country: UK  * Location: Southern North Sea * Production start: 2013 * Partners: GDF Suez, Tullow * Type: Gas * Estimated Rese...&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;Summary Information&lt;br /&gt;
* Operator: ConocoPhillips&lt;br /&gt;
* Country: UK &lt;br /&gt;
* Location: Southern North Sea&lt;br /&gt;
* Production start: 2013&lt;br /&gt;
* Partners: GDF Suez, Tullow&lt;br /&gt;
* Type: Gas&lt;br /&gt;
* Estimated Reserves: &lt;br /&gt;
* Production Volume: &lt;br /&gt;
&lt;br /&gt;
+++ Description&lt;br /&gt;
* The Katy Field development will consist of a single production well, the installation of a Normally Unattended Installation (NUI), the installation of two subsea protection structures (a Tee assembly at Katy and a pigging manifold at Kelvin) and a new 14 km 10” gas production pipeline with a piggy-backed 2” methanol pipeline. &lt;br /&gt;
* The pipeline will connect the Katy platform to the existing Kelvin Subsea Tee, which is tied-back to the Murdoch Complex. &lt;br /&gt;
* Commingled gas from Katy and other connected fields  will be exported from the [[[Murdoch Gas Field | Murdoch Complex]]] to the Theddlethorpe Gas Terminal via the CMS pipeline system.&lt;br /&gt;
&lt;br /&gt;
+++ Contractors&lt;br /&gt;
* **Wilton Engineering:** Fabrication of all subsea structures, including the two large structures: a 59-tonne tee and a 73-tonne pigging manifold&lt;br /&gt;
* **Seaway Heavy Lifting:** Transportation &amp;amp; Installation of Jacket &amp;amp; Piles and Topsides&lt;br /&gt;
* **KWSubsea:** Detailed design of 14km 10&amp;quot; gas production and 2&amp;quot; methanol piggyback pipelines, associated tie-in spoolpieces, 100T Kelvin Pigging Manifold Assembly and Katy Future 60T Tie-in Assembly&lt;br /&gt;
* **Nessco:** Communications Systems &lt;br /&gt;
&lt;br /&gt;
+++ History&lt;br /&gt;
* 2012 - Project development approved by UK Government&lt;br /&gt;
* 2013 - First gas produced&lt;br /&gt;
&lt;br /&gt;
+++ Geology&lt;br /&gt;
* &lt;br /&gt;
&lt;br /&gt;
+++ Links&lt;br /&gt;
# [[UK Oil and Gas Fields by Approval Date]]&lt;br /&gt;
# [[Seaway Heavy Lifting Oil And Gas References]]&lt;br /&gt;
# [[KWSubsea Subsea References]]&lt;br /&gt;
# [[Nessco Platform References]]&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:wilton-engineering-completes-saipem-contract Wilton Engineering Completes Saipem Contract]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
</feed>