<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>http://www.abarrelfull.co.uk/index.php?action=history&amp;feed=atom&amp;title=KWsubsea_Deepwater_Project_Highlights_References</id>
	<title>KWsubsea Deepwater Project Highlights References - Revision history</title>
	<link rel="self" type="application/atom+xml" href="http://www.abarrelfull.co.uk/index.php?action=history&amp;feed=atom&amp;title=KWsubsea_Deepwater_Project_Highlights_References"/>
	<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=KWsubsea_Deepwater_Project_Highlights_References&amp;action=history"/>
	<updated>2026-04-07T16:31:01Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.33.1</generator>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=KWsubsea_Deepwater_Project_Highlights_References&amp;diff=68184&amp;oldid=prev</id>
		<title>Abarrelfull: Created page with &quot;# Tweneboa Enyenra and Ntomme (TEN) Oil and Gas Fields #* Ghana #* KW1398 #* Tullow Oil #* 2011	Initial scope included working as part of Tullow’s in-house team providin...&quot;</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=KWsubsea_Deepwater_Project_Highlights_References&amp;diff=68184&amp;oldid=prev"/>
		<updated>2023-02-23T09:24:50Z</updated>

		<summary type="html">&lt;p&gt;Created page with &amp;quot;# &lt;a href=&quot;/Tweneboa_Enyenra_and_Ntomme_(TEN)_Oil_and_Gas_Fields&quot; title=&quot;Tweneboa Enyenra and Ntomme (TEN) Oil and Gas Fields&quot;&gt;Tweneboa Enyenra and Ntomme (TEN) Oil and Gas Fields&lt;/a&gt; #* Ghana #* KW1398 #* Tullow Oil #* 2011	Initial scope included working as part of Tullow’s in-house team providin...&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;# [[Tweneboa Enyenra and Ntomme (TEN) Oil and Gas Fields]]&lt;br /&gt;
#* Ghana&lt;br /&gt;
#* KW1398&lt;br /&gt;
#* Tullow Oil&lt;br /&gt;
#* 2011	Initial scope included working as part of Tullow’s in-house team providing concept and pre-FEED engineering of the pipelines and flowline scope of the subsea development undertaking specialist studies including geohazards and SCR concept. &lt;br /&gt;
#* Following on, KW was retained as the subsea management team to oversee the Subsea FEED contractor. &lt;br /&gt;
#* The subsea/FPSO development is offshore Ghana in approximately 1500m of water, encompassing three drill centres with manifolds, production and injection flowlines, umbilicals and riser system.&lt;br /&gt;
# **[[CLOV Oil and Gas Fields]]**&lt;br /&gt;
#* Angola&lt;br /&gt;
#* KW1522&lt;br /&gt;
#* Total / Subsea7&lt;br /&gt;
#* 2011&lt;br /&gt;
#* Lateral buckling and pipeline walking assessment and mitigation design for  pipeline systems associated with the CLOV development, which is located in the north-western part of Block 17, deep offshore Angola, approximately  40km north-north-west of the Girassol Development and 200km to shore.&lt;br /&gt;
#* It consists of four reservoirs in water depths ranging from 1050m to 1410m.&lt;br /&gt;
Burullus Phase 8 Tender &lt;br /&gt;
Support&lt;br /&gt;
Eqypt&lt;br /&gt;
KW1303	Burullus / Acergy	2010	Design and installation methodology input to Acergy for the tender submission for the next phase of the West Delta Deep Concession comprising of 10-wells tied back through the existing export infrastructure in water depths ranging between 400 and 750m. KW were responsible for developing the field architecture; design of the production manifolds; control/chemical distribution manifolds; PLEM’s and association suction piles; PLET’s and other utility structures. The scope included the validation of the flowline design and design of the rigid vertical jumper and flexible flowline connections. A key element of the work involved provision of an optimised field architecture and alternative, equipment optimization/ standardization, operability and construction reviews.&lt;br /&gt;
# **[[Girassol Oil Field]]**&lt;br /&gt;
#* Angola&lt;br /&gt;
#* KW0925&lt;br /&gt;
#* Total / Subsea7&lt;br /&gt;
#* 2008&lt;br /&gt;
#* Design of a pioneering repair system for Subsea7 for deep water pipelines, for use in the repair of a 12&amp;quot; water injection pipeline in 1360m water depth.&lt;br /&gt;
#* Responsible for the design of the spoolpiece introduced to accommodate the expected expansions and for the analysis of the installation and deployment operations of the repair system.&lt;br /&gt;
# **[[[KG D6 Gas Field]]]**&lt;br /&gt;
#* India&lt;br /&gt;
#* KW0982&lt;br /&gt;
#* Reliance / Bechtel&lt;br /&gt;
#* 2007&lt;br /&gt;
#* Third Party review and verification of lateral buckling and pipe walking issues.&lt;br /&gt;
# [[Akpo Oil Field]]&lt;br /&gt;
#* Nigeria&lt;br /&gt;
#* KW0981&lt;br /&gt;
#* Total / Saipem SA&lt;br /&gt;
#* 2007&lt;br /&gt;
#* Verification of contractor’s lateral buckling and walking analysis for 10&amp;quot; infield deep water flowlines in 1300m water depth, using detailed non-linear ABAQUS FE models.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
West Delta DM-IV &lt;br /&gt;
Development&lt;br /&gt;
Egypt&lt;br /&gt;
KW0250 / KW0384	Burullus / Subsea7	2006	Lateral buckling, pipe walking, freespan, bottom roughness and routing analysis and buckle arrestor design for a 10&amp;quot; flowline in up to 780m water depth.&lt;br /&gt;
West Delta DM-IV &lt;br /&gt;
Development&lt;br /&gt;
Egypt&lt;br /&gt;
KW0384	Intec Engineering	2006	Definition of seismic design requirements for manifold foundations.&lt;br /&gt;
Gulf of Aqaba Pipeline&lt;br /&gt;
Egypt&lt;br /&gt;
KW0634	East Gas Company (EGC)	2005&lt;br /&gt;
-&lt;br /&gt;
2013	Inspection Database and Pipeline Engineering Technical Training Course presented to PMS engineers.&lt;br /&gt;
Gulf of Aqaba Pipeline&lt;br /&gt;
Egypt&lt;br /&gt;
KW0484	East Gas Company (EGC)	2004&lt;br /&gt;
-&lt;br /&gt;
2013	Production of survey specification, acting as owner representative during annual survey, integrity assessment of pipeline as per annual survey data evaluated, including detailed freespan fatigue assessment.&lt;br /&gt;
Gulf of Aqaba Pipeline&lt;br /&gt;
Egypt&lt;br /&gt;
KW0649	East Gas Company (EGC)	2003&lt;br /&gt;
-&lt;br /&gt;
2013	Project management, detailed design and installation and commissioning supervision for the pipeline system. Client’s representative during installation of pipeline and shore crossing.&lt;br /&gt;
Gulf of Aqaba Pipeline&lt;br /&gt;
Egypt&lt;br /&gt;
KW0484	East Gas Company (EGC)	2003&lt;br /&gt;
-&lt;br /&gt;
2013	Pre-FEED and FEED engineering for this large diameter (36&amp;quot; x 15km) technically challenging pipeline project, including deepwater (900m), rough seabed terrain and seismic hazards. Specify and supervise pre-engineering survey and interpretation of survey results. Retains record to-date for largest diameter pipeline installed in 900m water depth.&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
</feed>