<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>http://www.abarrelfull.co.uk/index.php?action=history&amp;feed=atom&amp;title=ENPPI_Pipeline_References</id>
	<title>ENPPI Pipeline References - Revision history</title>
	<link rel="self" type="application/atom+xml" href="http://www.abarrelfull.co.uk/index.php?action=history&amp;feed=atom&amp;title=ENPPI_Pipeline_References"/>
	<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=ENPPI_Pipeline_References&amp;action=history"/>
	<updated>2026-09-11T22:32:52Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.33.1</generator>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=ENPPI_Pipeline_References&amp;diff=73394&amp;oldid=prev</id>
		<title>Abarrelfull: Created page with &quot;Al-Khafji Field Development – Phase 1  2006 / 2010    Client: Al-Khafji Joint Operations (KJO)   Project Description  The field development for Khafji has been developed to...&quot;</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=ENPPI_Pipeline_References&amp;diff=73394&amp;oldid=prev"/>
		<updated>2024-03-05T08:51:20Z</updated>

		<summary type="html">&lt;p&gt;Created page with &amp;quot;Al-Khafji Field Development – Phase 1  2006 / 2010    Client: Al-Khafji Joint Operations (KJO)   Project Description  The field development for Khafji has been developed to...&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;Al-Khafji Field Development – Phase 1  2006 / 2010 &lt;br /&gt;
 &lt;br /&gt;
Client: Al-Khafji Joint Operations (KJO)  &lt;br /&gt;
Project Description &lt;br /&gt;
The field development for Khafji has been developed to maintain the maximum sustainable capacity of 300,000 BOPD and production of 125 MMSCFD of associated gases, as well as, 50 MMSCFD gas lift, by installation of 6 new platforms, 8500 tons total structure weight and modification of 9 existing platforms, in addition to subsea pipelines with a total length of 110 km sizing 24”, 28”, 36” and 42 “ and laying of 59 km subsea cables. Sizing / length &lt;br /&gt;
Total Pipelines length 110 km, sizes 24” / 28” / 36” / 42” and laying of subsea cables with a total length of 59 km &lt;br /&gt;
Contract Type &lt;br /&gt;
EPC LSTK – consortium  &lt;br /&gt;
Scope of Services &lt;br /&gt;
Engineering, material supply, supervision of onshore structure fabrication &amp;amp; offshore laying/installation, overall management, consortium leader and commissioning &amp;amp; start-up &lt;br /&gt;
 &lt;br /&gt;
Semman Field Development  2006 / 2008 &lt;br /&gt;
 &lt;br /&gt;
Client: Belayim Petroleum Company (Petrobel) &lt;br /&gt;
Project Description &lt;br /&gt;
Installation of new Semman platform (tripod plus deck) and laying of new 18” sea line from Semman to existing Darfeel platform with a total length of 20 Km, top site facilities of Semman platform will be operated by Blown down system. Sizing / length &lt;br /&gt;
18” 20 km subsea P/L &lt;br /&gt;
Contract Type &lt;br /&gt;
Lump-sum professional services &lt;br /&gt;
Scope of Services &lt;br /&gt;
FEED review, detailed engineering and procurement services &lt;br /&gt;
Professional Services for Denise Platform 2006 / 2008 &lt;br /&gt;
 &lt;br /&gt;
Client: Belayim Petroleum Company (Petrobel) &lt;br /&gt;
Project Description &lt;br /&gt;
Upgrade of TNW2 existing platform to suit Denise gas field production, transmit additional capacity to onshore via 61 KM 32” offshore pipeline and 1 KM 32” pipeline onshore. &lt;br /&gt;
Sizing / length &lt;br /&gt;
61 KM 32&amp;quot; Offshore Pipeline &amp;amp; 1 KM 32&amp;quot; Onshore &lt;br /&gt;
Contract Type &lt;br /&gt;
Lump-sum for professional services &lt;br /&gt;
Scope of Services &lt;br /&gt;
FEED, detailed engineering and procurement services &lt;br /&gt;
 &lt;br /&gt;
Anshoga Field Development Project 	 	 &lt;br /&gt;
Client: Belayim Petroleum Company (Petrobel) &lt;br /&gt;
Project Description  &lt;br /&gt;
Anshoga filed one tripod platform accommodate two wells &amp;amp; 18” sealine, 6.2km to transport produced gas to existing plem at Nouras “A” area. &lt;br /&gt;
Sizing / length &lt;br /&gt;
18” 6km &lt;br /&gt;
Contract Type &lt;br /&gt;
Lump-sum professional services &lt;br /&gt;
Scope of Services &lt;br /&gt;
FEED, detailed engineering and procurement services &lt;br /&gt;
Temsah – 4 Platform  2005 / 2007 &lt;br /&gt;
Client: Belayim Petroleum Company (Petrobel) &lt;br /&gt;
Project Description &lt;br /&gt;
The project aims to install 4 legs, 12-slot unmanned fixed offshore production platform at 85 m water depth and capacity of 10 MMSCFD gas plus 3000 BBLD condensate. &lt;br /&gt;
Sizing / length &lt;br /&gt;
24&amp;quot; gas pipeline 5.5 Km, 10&amp;quot; condensate P/L 5.5 Km, 4&amp;quot; produced water 5.5 Km and 3&amp;quot; instrument gas 5.5 Km- offshore Contract Type &lt;br /&gt;
Lump-sum for professional services &lt;br /&gt;
Scope of Services &lt;br /&gt;
FEED, detailed engineering &amp;amp; procurement services  &lt;br /&gt;
 &lt;br /&gt;
Temsah N.W. Platform TNWP-2  &lt;br /&gt;
 &lt;br /&gt;
Client: Belayim Petroleum Company (Petrobel) &lt;br /&gt;
Project Description  &lt;br /&gt;
New Temsah North West platform TNWP-2 and associated sealine Sizing / length &lt;br /&gt;
24” 2km gas, 10” 2km condensate, 4” 2km water and 3” 2km glycol &lt;br /&gt;
Contract Type &lt;br /&gt;
Lump-sum professional services &lt;br /&gt;
Scope of Services &lt;br /&gt;
Engineering and procurement services &lt;br /&gt;
Baltim-N Platform             2003 / 2005 &lt;br /&gt;
 &lt;br /&gt;
Client: Belayim Petroleum Company (Petrobel) &lt;br /&gt;
Project Description &lt;br /&gt;
The project aims to install 4 legs 9-slots tubular steel frame jacket, and a fixed offshore production platform with a Capacity of 4.7 MMSCMD Gas.  Gas &amp;amp; Condensate are directed to Baltim east existing platform through an 18&amp;quot; Pipeline. &lt;br /&gt;
Sizing / length &lt;br /&gt;
18” gas pipeline 20km &amp;amp; 4” produced water 20km offshore &lt;br /&gt;
Contract Type &lt;br /&gt;
Lump-sum for professional services  &lt;br /&gt;
Scope of Services &lt;br /&gt;
FEED, detailed engineering &amp;amp; procurement services &lt;br /&gt;
 &lt;br /&gt;
PF-D &amp;amp; RPP Development  2003 / 2005 &lt;br /&gt;
 &lt;br /&gt;
Client: Belayim Petroleum Company (Petrobel) &lt;br /&gt;
Project Description &lt;br /&gt;
The project aims to install sealine; new well, new offshore structure PF-D will be located on the &lt;br /&gt;
well to deliver the production through 12” sealine to RPP platform &lt;br /&gt;
Sizing / length &lt;br /&gt;
26” gas 55km, 12” multiphase 5km and 3” 5km instrument gas &lt;br /&gt;
Contract Type &lt;br /&gt;
Lump-sum for professional services  &lt;br /&gt;
Scope of Services &lt;br /&gt;
FEED review, detailed engineering &amp;amp; procurement services  &lt;br /&gt;
 &lt;br /&gt;
 &lt;br /&gt;
Onshore Pipelines Experience &lt;br /&gt;
 &lt;br /&gt;
 &lt;br /&gt;
 &lt;br /&gt;
 &lt;br /&gt;
 	 &lt;br /&gt;
Provision of PMC for Missan Oil Export Pipeline (MOEP)  2013 / 2014 &lt;br /&gt;
 &lt;br /&gt;
Client: PetroChina Company Limited &lt;br /&gt;
Project Description &lt;br /&gt;
Missan 42” Oil export pipeline is designed to handle 1,000,000 BOPD, and  starts at the designated Halfaya junction point (meeting point of Halfaya and Buzurgan oil field branch pipelines) in Missan Governorate.  &lt;br /&gt;
The pipeline is divided into two segments; Segment “A” extends for 121 km between Halfaya and Bin-Umr, while Segment “B” extends for 151 km between Bin-Umr and Faw terminal.The pipeline is fitted with SCADA system and 15 block valve stations along its entire route. &lt;br /&gt;
Contract Type &lt;br /&gt;
PMC – Reimbursable MHRS &lt;br /&gt;
Scope of Services &lt;br /&gt;
Project Management Consultancy services, including review Basic/Detailed Engineering, procurement and construction supervision &lt;br /&gt;
 &lt;br /&gt;
 &lt;br /&gt;
 &lt;br /&gt;
SAFER / JAHANA Pipeline and Storage Facilities 2011 / 2012 &lt;br /&gt;
 &lt;br /&gt;
Client: Yemen Gas Company &lt;br /&gt;
Project Description &lt;br /&gt;
The project aims to the installation of a new LPG pipeline from SAFER to JAHANA (total length 100 km), in addition to new storage / loading / unloading facilities at JAHANA (total storage capacity 21000 metric ton). &lt;br /&gt;
Contract Type &lt;br /&gt;
Lump sum for professional services &lt;br /&gt;
Scope of Services &lt;br /&gt;
Conceptual Design &lt;br /&gt;
 &lt;br /&gt;
 &lt;br /&gt;
 &lt;br /&gt;
 &lt;br /&gt;
El Nubaria / El Sadat &amp;amp; El Sadat / El Fayoum Pipelines   2010 / 2012 &lt;br /&gt;
 &lt;br /&gt;
Client: The Egyptian Natural Gas Company (GASCO)  &lt;br /&gt;
Project Description &lt;br /&gt;
 The project aims to install two gas transmission pipelines and associated facilities: &lt;br /&gt;
	32” Nubaria / El Sadat city - 70 Km &lt;br /&gt;
	42” El Sadat / El Fayoum - 80 Km &lt;br /&gt;
Contract Type &lt;br /&gt;
Professional Services - Lump-sum, Material Supply &amp;amp; &lt;br /&gt;
Subcontracts - Cost Plus   &lt;br /&gt;
Scope of Services &lt;br /&gt;
Engineering &amp;amp; Procurement services / Material Supply  &lt;br /&gt;
 &lt;br /&gt;
 &lt;br /&gt;
Assiut / Aswan Gas Pipeline and  Dahshour Compression Station &lt;br /&gt;
 &lt;br /&gt;
Client: Egyptian Natural Gas Holding Company (EGAS)  &lt;br /&gt;
Project Description &lt;br /&gt;
Installation of gas transmission pipelines (500 KM) from Assiut to Aswan as follow:  &lt;br /&gt;
-	PHASE I: Assiut / Gerga P/L 120 km – 32” &lt;br /&gt;
-	PHASE II: Gerga / Aswan P/L 380 km – 30” &lt;br /&gt;
-	PHASE III:  Compression Station in Dahshour &lt;br /&gt;
Contract Type &lt;br /&gt;
Lump-sum for professional services  &lt;br /&gt;
Scope of Services: Route selection, surveying, basic and detailed engineering, procurement Service, construction supervision and overall project management. &lt;br /&gt;
 &lt;br /&gt;
 &lt;br /&gt;
 &lt;br /&gt;
 &lt;br /&gt;
 	 &lt;br /&gt;
Neem Export Pipeline   2006 / 2008 &lt;br /&gt;
 &lt;br /&gt;
Client: Greater Nile Petroleum Operating Company (GNPOC)  &lt;br /&gt;
Project Description &lt;br /&gt;
The project aims to install a 16”- 100 km long crude oil export pipeline and transport the dehydrated crude to Diffra field production facility (DFPF) – S.W. Sudan 760 Km from Khartoum. &lt;br /&gt;
Sizing / length &lt;br /&gt;
16 inch 100 KM &lt;br /&gt;
Contract Type &lt;br /&gt;
Lump-sum S/C of Ram/Petrojet Consortium &lt;br /&gt;
Scope of Services &lt;br /&gt;
Basic &amp;amp; detailed engineering and procurement Services &lt;br /&gt;
 &lt;br /&gt;
Arab Gas Pipeline Phase I:  &lt;br /&gt;
Inter Sinai Gas Pipeline Project   1999 / 2001 &lt;br /&gt;
 &lt;br /&gt;
Client: Belayim Petroleum Company (Petrobel) &lt;br /&gt;
Project Description &lt;br /&gt;
The project aims to install 36”, 193 km - gas pipeline from East Bank of Suez Canal to terminal area eastward of el Arish city, in addition to communication systems, leak detection systems &amp;amp; cathodic protection systems. &lt;br /&gt;
Sizing / length &lt;br /&gt;
36”, 193 km &lt;br /&gt;
Contract Type &lt;br /&gt;
Lump-sum for professional services &lt;br /&gt;
Scope of Services &lt;br /&gt;
Basic engineering review, detailed engineering, procurement services, prepare and issue construction tender package and project management &lt;br /&gt;
 &lt;br /&gt;
 	 &lt;br /&gt;
Arish-Taba Gas Pipeline  	 &lt;br /&gt;
2001 / 2003 &lt;br /&gt;
 &lt;br /&gt;
Project Description &lt;br /&gt;
The project aims to install 36” P/L 250 KM from Arish to Taba 10 BCM / Year to export the Egyptian sales gas across the Gulf of Aqaba, in addition to executing new control building at Taba. The scope included pipeline communication systems, leak detection systems &amp;amp; cathodic protection systems. &lt;br /&gt;
Sizing / length &lt;br /&gt;
36”, 250 km &lt;br /&gt;
Contract Type &lt;br /&gt;
Lump-sum for professional services, material supply disbursable &lt;br /&gt;
Scope of Services &lt;br /&gt;
Arish / Taba Gas pipeline topographical survey, basic, detailed engineering &amp;amp; procurement services &lt;br /&gt;
 &lt;br /&gt;
Aqaba Thermal Power Station  2002 / 2003 &lt;br /&gt;
 &lt;br /&gt;
Client: East Gas Company (EGC) &lt;br /&gt;
Project Description &lt;br /&gt;
The Project aims to execute a receiving and metering station for the gas transmitted from Taba in Egypt to &lt;br /&gt;
Aqaba - Jordan along with the associated facilities &lt;br /&gt;
Contract Type &lt;br /&gt;
Lump-sum for professional services &lt;br /&gt;
Scope of Services &lt;br /&gt;
Basic 	engineering 	and 	commissioning 	&amp;amp; 	start-up assistance &lt;br /&gt;
 &lt;br /&gt;
 	 &lt;br /&gt;
Arab Gas Pipeline Phase II:  	 &lt;br /&gt;
1st Stage: Aqaba to Rehab Power Station P/L   2004 / 2006 &lt;br /&gt;
Client: Jordanian Egyptian FAJR for Natural Gas Transmission and Supply Co. Ltd. (FAJR) Project Description &lt;br /&gt;
The project aims to transmit and compress Egyptian gas from Aqaba to Rehab power station by installation of Aqaba compression station, 36”, 394 km pipeline – 10 BCM/y gas, metering, and SCADA system.  Sizing / length: 36”, 394 km up to Rehab north power station &lt;br /&gt;
Contract Type &lt;br /&gt;
Lump-sum for professional services &amp;amp; construction, &lt;br /&gt;
material supply disbursable &lt;br /&gt;
Scope of Services &lt;br /&gt;
EPC 	Turn-key 	consortium, 	techno-economic 	study, &lt;br /&gt;
feasibility study, review funding mechanism, set project financial scheme, conceptual design &amp;amp; feed, basic &amp;amp; detailed engineering, procurement services, material supply, construction supervision, commissioning &amp;amp; start up assistance, overall management and consortium leader &lt;br /&gt;
 &lt;br /&gt;
Arab Gas Pipeline Phase II: &lt;br /&gt;
2nd Stage: Rehab Power Station to Jordan/Syrian Boarders P/L   2006 / 2008 &lt;br /&gt;
Client: Jordanian Egyptian FAJR for Natural Gas Transmission and Supply Co. Ltd. (FAJR) Project Description &lt;br /&gt;
The project aims to transmit natural gas from Rehab power station to Jordanian / Syrian boarders through a 36”, 30 km pipeline – 10 BCM/y gas, metering skids, and SCADA system &lt;br /&gt;
Sizing / length: &lt;br /&gt;
36”, 30 km from Rehab north power station to the Jordanian and Syrian boarders. &lt;br /&gt;
Contract Type &lt;br /&gt;
Lump-sum for professional services &amp;amp; construction, &lt;br /&gt;
material supply disbursable &lt;br /&gt;
Scope of Services &lt;br /&gt;
EPC Turn-key consortium, techno-economic study, feasibility study, review funding mechanism, set project financial scheme, conceptual design &amp;amp; feed, basic &amp;amp; detailed engineering, procurement services, material supply, construction supervision, commissioning &amp;amp; start up assistance, overall management  &amp;amp; consortium leader &lt;br /&gt;
 &lt;br /&gt;
Tanak / Omar Vapor Recovery 2001 / 2003  &lt;br /&gt;
 &lt;br /&gt;
Client: Al Furat Petroleum Company  &lt;br /&gt;
Project Description &lt;br /&gt;
Installation of 2 associated vapor recovery units with a capacity of 2.7 MMSCFD &amp;amp; 3.5 MMSCFD at Tanak &amp;amp; Omar areas; and installation of a new water injection unit 900 cubic meter/hour at Tanak area in addition to the related pipelines and utilities. &lt;br /&gt;
Sizing / length &lt;br /&gt;
	10” 36km (Tanak Omar Gas Pipeline) &lt;br /&gt;
Carbon Steel (API 5LX42)  &lt;br /&gt;
	8” 11 Km (Maleh water pipeline) Carbon &lt;br /&gt;
Steel (API  5L X42) &lt;br /&gt;
	4” 4 Km (Omar CBF / Omar GSA gas condensate pipeline) Carbon Steel (API 5L X42) &lt;br /&gt;
Contract Type &lt;br /&gt;
Lump-sum Turnkey, Main Contractor &lt;br /&gt;
Scope of Services &lt;br /&gt;
Basic &amp;amp; detailed engineering, construction, procurement, commissioning &amp;amp; Startup &lt;br /&gt;
 &lt;br /&gt;
New Karama Pipeline  2007/ 2008 &lt;br /&gt;
 &lt;br /&gt;
Client: Qarun Petroleum Company (QPC)  &lt;br /&gt;
Project Description &lt;br /&gt;
Installation of a new 10” / 120 km pipeline from Karama to Qarun and installation of 2 transfer pumps at Karama area &lt;br /&gt;
Sizing / length &lt;br /&gt;
20,000 B/D (10&amp;quot; 120 Km crude) between Qarun &amp;amp; Karama  &lt;br /&gt;
Contract Type &lt;br /&gt;
Lump-sum for Professional services  &lt;br /&gt;
Scope of Services &lt;br /&gt;
Detailed engineering services &lt;br /&gt;
 &lt;br /&gt;
 	 &lt;br /&gt;
Management Services for 3 Natural Gas Pipelines   &lt;br /&gt;
Client: Egyptian Natural Gas Holding Company (EGAS)  &lt;br /&gt;
Project Description &lt;br /&gt;
Installation of three new natural gas pipelines: - 	Taba / Sharm El Sheikh (20” 208km) &lt;br /&gt;
-	Banisuef / Abu Qurkas (phase1) (32” 150km) &lt;br /&gt;
-	Shukair / Hurghada (phase1) (24” 127km) &lt;br /&gt;
Sizing / length &lt;br /&gt;
20&amp;quot; 208 km/ 32&amp;quot; 150 km/ 24&amp;quot; 127 km &lt;br /&gt;
Contract Type &lt;br /&gt;
Reimbursable MHRs &lt;br /&gt;
Scope of Services &lt;br /&gt;
Management Services &lt;br /&gt;
 &lt;br /&gt;
 &lt;br /&gt;
Sharara Mellitah Pipeline Extension  2004 / 2005 &lt;br /&gt;
 &lt;br /&gt;
Client: AGIP  &lt;br /&gt;
Project Description &lt;br /&gt;
30&amp;quot; Crude Oil Pipeline from Sharara area to Melittah - 750 km, where the new pipeline will be executed three sections including Metering skids, Scada System.  &lt;br /&gt;
Sizing / length &lt;br /&gt;
30” 750 KM &lt;br /&gt;
Contract Type &lt;br /&gt;
Lump-sum – Enppi subcontractor - Petrojet &lt;br /&gt;
Scope of Services &lt;br /&gt;
Basic &amp;amp; detailed engineering services &lt;br /&gt;
 &lt;br /&gt;
 &lt;br /&gt;
 	 &lt;br /&gt;
Sapphire Condensate Export Pipeline   2004 / 2005 &lt;br /&gt;
 &lt;br /&gt;
Client: Burullus Gas Company (Burullus)  &lt;br /&gt;
Project Description &lt;br /&gt;
10” O.D condensate Pipeline from Idku pumping station to Damanhur and a new 12 O.D pipeline from Damanhur to Tanta, in addition to 2 new tanks at &lt;br /&gt;
Tanta terminal &lt;br /&gt;
Sizing / length &lt;br /&gt;
10&amp;quot; and 12&amp;quot; - total length is 100 KM &lt;br /&gt;
Contract Type &lt;br /&gt;
EPC Lump-sum turnkey &lt;br /&gt;
Scope of Services &lt;br /&gt;
Basic 	&amp;amp; 	detailed 	engineering, 	procurement, construction &amp;amp; start-up assistance, Lump sum, including material supply and construction works &lt;br /&gt;
 &lt;br /&gt;
 &lt;br /&gt;
Off-fence Pipeline &amp;amp; Facilities    &lt;br /&gt;
 &lt;br /&gt;
Client: Middle East Oil Tankage and Pipelines (MIDTAP)  &lt;br /&gt;
Project Description &lt;br /&gt;
The project aims to install crude pipeline (26&amp;quot;12 Km), gasoline pipeline (20&amp;quot;18 Km), kerosene/diesel pipeline (21 Km), multi-purpose heavy products exchange pipeline (21 Km) and effluent water pipeline. The scope also includes pipeline communication systems and leak detection system.  Sizing / length &lt;br /&gt;
Crude P/L 26&amp;quot; 12Km, Gasoline P/L 20&amp;quot; (18 Km), Kerosene/diesel P/L (21 Km), Multi-purpose heavy products exchange P/L (21 &lt;br /&gt;
Km), effluent water P/L 16&amp;quot; 6.5 KM / carbon steel material &lt;br /&gt;
Contract Type &lt;br /&gt;
Lump sum professional services, disbursable material supply &lt;br /&gt;
Scope of Services &lt;br /&gt;
EPC turnkey scope: basic &amp;amp; detailed engineering, procurement services/material supply and assistance for commissioning &amp;amp; start-up&lt;/div&gt;</summary>