<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>http://www.abarrelfull.co.uk/index.php?action=history&amp;feed=atom&amp;title=Banyu_Urip_Oil_Field</id>
	<title>Banyu Urip Oil Field - Revision history</title>
	<link rel="self" type="application/atom+xml" href="http://www.abarrelfull.co.uk/index.php?action=history&amp;feed=atom&amp;title=Banyu_Urip_Oil_Field"/>
	<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Banyu_Urip_Oil_Field&amp;action=history"/>
	<updated>2026-07-30T23:47:00Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.33.1</generator>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Banyu_Urip_Oil_Field&amp;diff=70805&amp;oldid=prev</id>
		<title>Abarrelfull: Created page with &quot;Summary Information * Operator: Exxon * Country: Indonesia * Location: Cepu block in East Java * Production start: 2009 * Partners: Exxon - 45%, Pertamina - 45%, Local Governm...&quot;</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Banyu_Urip_Oil_Field&amp;diff=70805&amp;oldid=prev"/>
		<updated>2023-10-24T15:14:22Z</updated>

		<summary type="html">&lt;p&gt;Created page with &amp;quot;Summary Information * Operator: Exxon * Country: Indonesia * Location: Cepu block in East Java * Production start: 2009 * Partners: Exxon - 45%, Pertamina - 45%, Local Governm...&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;Summary Information&lt;br /&gt;
* Operator: Exxon&lt;br /&gt;
* Country: Indonesia&lt;br /&gt;
* Location: Cepu block in East Java&lt;br /&gt;
* Production start: 2009&lt;br /&gt;
* Partners: Exxon - 45%, Pertamina - 45%, Local Government Co.s -10%&lt;br /&gt;
* Type: Oil&lt;br /&gt;
* Estimated Reserves: 450 million barrels&lt;br /&gt;
* Production Volume: 130,000 barrels of oil per day&lt;br /&gt;
&lt;br /&gt;
+++ Description&lt;br /&gt;
* Full field development is planned to produce 165,000 barrels of oil per day from facilities that include 49 wells on three well pads, a central processing facility, and a 60 mile (95 kilometer) pipeline to transfer the processed oil to a 1.7 million barrel floating storage and offloading (FSO) unit in the Java Sea. Tankers will load crude oil from the FSO for transport to domestic and world markets.&lt;br /&gt;
* The [[Banyu Urip FSO]] is a conversion of the double Hull VLCC (Very Large Crude Carrier) made in 1993 was previously a Greek flag trade ship under the name of MT Chios. The vessel is classified as a very large vessel. The length is 327 meters and has dead-weight of 320,000 tons with storage capacity of 1.7 million barrels&lt;br /&gt;
&lt;br /&gt;
+++ Contractors&lt;br /&gt;
* This work is divided into five contracts of EPC with total value of approximately US$1.3 billion. &lt;br /&gt;
* Those five contracts are projects for production process facility (EPC1), 20” onshore pipeline of 72 kilometer (EPC2), offshore pipeline and mooring tower (EPC3), floating storage and offloading facility (EPC4), and infrastructure facility and injected water storage dam (EPC5)&lt;br /&gt;
&lt;br /&gt;
* **Tripatra/Samsung** - Production Processing Facilities - (EPC1)&lt;br /&gt;
* **PT. Inti Karya Persada Tehnik (IKPT) and PT. Kelsri:** Design and installation of insulated onshore pipeline - (EPC2) &lt;br /&gt;
* **PT. Rekayasa Industri and Likpin LLC:** Engineering, procurement and construction contract for the project’s offshore pipeline and mooring facilities - (EPC 3)&lt;br /&gt;
* **Sembcorp** - FSO Tanker Conversion Contract -(EPC4)&lt;br /&gt;
* **PT. Rekayasa Industri (Rekind) and PT. Hutama Karya:** Engineering, procurement and construction contract for the design and building of Infrastructure Facilities (IF) - (EPC 5)&lt;br /&gt;
* **Process Group:** 2 x 814 m3/h Deoiler Hydrocyclone Packages&lt;br /&gt;
&lt;br /&gt;
+++ History&lt;br /&gt;
* 2007 - Appraisal wells drilled&lt;br /&gt;
* 2009 - Banyu Urip Project started operating its initial production facility&lt;br /&gt;
* 2011 - Decision taken for full field development&lt;br /&gt;
* 2011 - Award of the first of five engineering, procurement and construction contracts&lt;br /&gt;
* 2012 - The Regional Government of Bojonegoro Regency issued all principle permits&lt;br /&gt;
* 2015 - Central Processing Facility starts operations, boosting production&lt;br /&gt;
&lt;br /&gt;
+++ Geology&lt;br /&gt;
* &lt;br /&gt;
&lt;br /&gt;
+++ Links&lt;br /&gt;
# [[Process Group Oil And Gas Processing References]]&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:mcl-starts-drilling-appraisal-well MCL Starts Drilling Appraisal Well]&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:exxonmobil-pertamina-move-forward-with-banyu-urip-fu/ ExxonMobil, Pertamina Move Forward with Banyu Urip Full Field Development]&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:mobil-cepu-ltd-awards-contract-for-banyu-urip-insula Mobil Cepu Ltd. Awards Contract for Banyu Urip Insulated Onshore Pipeline Facilities]&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:mobil-cepu-ltd-awards-contract-for-banyu-urip-offsho Mobil Cepu Ltd. Awards Contract for Banyu Urip Offshore Pipeline and Mooring Facilities]&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:samsung-engineering-and-tripatra-engineers-construct Samsung Engineering And Tripatra Engineers &amp;amp; Constructors Consortium Awarded Contract From Mobil Cepu Ltd]&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:sembcorp-marine-s-subsidiary-sembawang-shipyard-awar Sembcorp Marine's Subsidiary, Sembawang Shipyard Awarded Fso Tanker Conversion Contract From Mobil Cepu Ltd]&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:mobil-cepu-ltd-awards-contract-for-banyu-urip-infras Mobil Cepu Ltd. awards contract for Banyu Urip Infrastructure Facilities]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:3195 FSO Vessel Of Cepu Block To Complete In January 2014]&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:all-principle-permits-for-banyu-urip-production-faci All Principle Permits For Banyu Urip Production Facility To Immediately Issue]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:6110 ExxonMobil Starts Banyu Urip Central Processing Facility in Indonesia]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
</feed>