<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>http://www.abarrelfull.co.uk/index.php?action=history&amp;feed=atom&amp;title=Arzew_Refinery_Project</id>
	<title>Arzew Refinery Project - Revision history</title>
	<link rel="self" type="application/atom+xml" href="http://www.abarrelfull.co.uk/index.php?action=history&amp;feed=atom&amp;title=Arzew_Refinery_Project"/>
	<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Arzew_Refinery_Project&amp;action=history"/>
	<updated>2026-04-27T10:42:50Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.33.1</generator>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Arzew_Refinery_Project&amp;diff=1254&amp;oldid=prev</id>
		<title>Abarrelfull: Created page with &quot;Summary Information Ownership: Sonatrach Website: http://www.sonatrach-dz.com/ (French) Wiki Page: Arzew Refinery Location: Arzew, Algeria Capacity: million tons/annum &amp; bbl/d...&quot;</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Arzew_Refinery_Project&amp;diff=1254&amp;oldid=prev"/>
		<updated>2020-03-09T17:32:34Z</updated>

		<summary type="html">&lt;p&gt;Created page with &amp;quot;Summary Information Ownership: Sonatrach Website: http://www.sonatrach-dz.com/ (French) Wiki Page: Arzew Refinery Location: Arzew, Algeria Capacity: million tons/annum &amp;amp; bbl/d...&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;Summary Information&lt;br /&gt;
Ownership: Sonatrach&lt;br /&gt;
Website: http://www.sonatrach-dz.com/ (French)&lt;br /&gt;
Wiki Page: Arzew Refinery&lt;br /&gt;
Location: Arzew, Algeria&lt;br /&gt;
Capacity: million tons/annum &amp;amp; bbl/day&lt;br /&gt;
Nelson Complexity:&lt;br /&gt;
Project Stage:&lt;br /&gt;
Expected Completion: Commissioning is expected in 2012&lt;br /&gt;
Budget: $405 million&lt;br /&gt;
The Project&lt;br /&gt;
Project Type: Expansion&lt;br /&gt;
Project Summary:&lt;br /&gt;
Revamp and Expansion of Existing CDU/ Gas Plants for 50% higher crude oil processing capacity&lt;br /&gt;
Adding a New light Naphta Isomerisation unit &amp;amp; a New DHDS Unit&lt;br /&gt;
Main Contractors: Technip will carry out the engineering consultancy contract, which covers conceptual design, licensors’ selection, basic design, front-end design, engineering procurement and construction (EPC) contractors’ selection and coordination as well as the definition of the expansion to comply with the new regulations.&lt;br /&gt;
Naftec, 100% subsidiary of the Sonatrach Group and the Group of Hyundai Engineering &amp;amp; Construction and its partners Hawha and Daewoo Engineering &amp;amp; Construction LTD conducted Wednesday, November 12, 2008 at the headquarters of the Directorate General of Sonatrach, the signing of a contract for the rehabilitation of facilities at the refinery of Arzew, increasing its production capacity by 50% and the adaptation of plants to produce fuels to European standards.&lt;br /&gt;
Refining Units&lt;br /&gt;
Naphta Isomerisation unit&lt;br /&gt;
DHDS Unit&lt;br /&gt;
Terminal Capacity&lt;br /&gt;
Crude Oil:&lt;br /&gt;
Refined Products:&lt;br /&gt;
Crude Supply&lt;br /&gt;
Sahara Crude Oil&lt;br /&gt;
Products Produced&lt;br /&gt;
The project will enable the plant to produce Euro V specification products&lt;br /&gt;
History&lt;br /&gt;
2005 - Technip awarded an engineering consultancy contract&lt;br /&gt;
Other Information&lt;br /&gt;
-&lt;br /&gt;
Relevant Links&lt;br /&gt;
Technip awarded an engineering consultancy contract for Arzew refinery in Algeria&lt;br /&gt;
Hyundai E&amp;amp;C wins Arzew Contract (French)&lt;br /&gt;
Naftec Presentation&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
</feed>