http://www.abarrelfull.co.uk/api.php?action=feedcontributions&user=Abarrelfull&feedformat=atomA Barrel Full - User contributions [en]2024-03-29T06:27:35ZUser contributionsMediaWiki 1.33.1http://www.abarrelfull.co.uk/index.php?title=Category:PTTEP&diff=73523Category:PTTEP2024-03-28T16:56:52Z<p>Abarrelfull: Created blank page</p>
<hr />
<div></div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Kikeh_Oil_Field&diff=73522Kikeh Oil Field2024-03-28T16:56:43Z<p>Abarrelfull: </p>
<hr />
<div>=== Summary Information ===<br />
* Operator: PTTEP<br />
* Country: Malaysia<br />
* Location: Block K, Offshore Sabah<br />
* Production start: 2007<br />
* Partners: Petronas<br />
* Type: [[Kikeh Crude Oil]]<br />
* Estimated Reserves:<br />
* Production Volume:<br />
<br />
=== Description ===<br />
* Kikeh was the first deepwater development in Malaysia and the Asia Pacific region<br />
* It is located in approximately 1350 metre water depth<br />
* The field consists of a floating production storage and offloading (FPSO) vessel, [[Kikeh FPSO]], receiving production from both wet-tree subsea wells and dry-tree wells drilled from a spar dry tree unit.<br />
* The FSPO has the capacity to store up to two million barrels of crude oil, and will be able to process 120,000 barrels of oil per day, with an offloading rate of 37,500 barrels per hour<br />
<br />
=== Contractors ===<br />
* **Aker Kvaerner:** Engineering, procurement, construction and commissioning assistance of the subsea production systems<br />
* **Aker Solutions:** Umbilicals<br />
* **SapuraAcergy:** Complete engineering, procurement, installation and commissioning of a 138 kilometre 12-inch diameter export pipeline<br />
* **MCS Kenny:** technical specification and acted as technical representative and also provided engineering support for the riser and completion tubing system <br />
* **Technip:** <br />
** Design, supply and installation of flexible flowlines and risers, holdback anchors, the installation of control umbilicals and manifolds, tie-in of the subsea wellheads, hook-up of the risers to the Kikeh floating production and offloading system (FPSO) and the pre-commissioning of the system<br />
** Engineering, construction and installation of a Spar floating production platform complete with topsides facilities, hull, mooring system and riser/wellhead systems<br />
* **MMHE:** Construction of the floating production storage and offloading (FPSO) facility <br />
* '''McDermott:''' <br />
** EPCI, pre-commissioning & commissioning assistance for Flexible flowlines, umbilical & flying leads for the Subsea Expansion Project <br />
** Kikeh subsea gas lift project: Transportation, installation and commissioning contract to remove the existing flexible gas lift riser and perform the installation and commissioning of a new dynamic riser section and flowline comprised of two thermoplastic composite pipe jumpers. <br />
<br />
=== History ===<br />
* 2002 - Field discovered by Murphy Oil<br />
* 2004 - Oil deposits discovered at lower depths<br />
* 2004 - Murphy Oil Announces Field Development Plan Approval <br />
* 2005 - Aker Kvaerner won contract for the engineering, procurement, construction and commissioning assistance of the subsea production systems<br />
* 2005 - Technip awarded contract for the engineering, construction and installation of a Spar floating production platform<br />
* 2007 - FSPO launched<br />
* 2007 - Brought first production on line<br />
* 2007 - SapuraAcergy joint venture awarded pipeline deepwater installation contract<br />
* 2019 - PTTEP acquires Murphy's Malaysia business<br />
* 2024 - McDermott contract for subsea gas lift project<br />
<br />
=== Geology ===<br />
* <br />
<br />
=== Links ===<br />
# [http://www.woodgroup.com/about-us/success-stories/subsea-flexible-flowlines-risers/pages/default.aspx Project Details from Wood Group]<br />
# [http://www.murphyoilcorp.com/operations/expro/malaysia.aspx Murphy Oil, Malaysia]<br />
# [[Aker Solutions Umbilical References]]<br />
# [[McDermott Subsea References]]<br />
# [http://killajoules.wikidot.com/blog:1148 Aker Solutions wins subsea contract in Malaysia]<br />
# [http://killajoules.wikidot.com/archive:aker-kvaerner-subsea-contract-in-malyasia Aker Kvaerner Subsea contract in Malyasia]<br />
# [http://killajoules.wikidot.com/archive:sapuraacergy-joint-venture-awarded-175-million-kikeh SapuraAcergy joint venture awarded $175 million Kikeh pipeline deepwater installation contract in Asia]<br />
# [http://killajoules.wikidot.com/archive:murphy-oil-announces-successful-results-at-the-kikeh/ Murphy Oil Announces Successful Results at the Kikeh #7 Well and the Discovery of Deeper Oil Reservoirs]<br />
# [http://killajoules.wikidot.com/archive:technip-awarded-contract-in-malaysia-for-the-kikeh-f/ Technip awarded contract in Malaysia for the Kikeh field subsea development]<br />
# [http://killajoules.wikidot.com/archive:murphy-oil-announces-field-development-plan-approval/ Murphy Oil Announces Field Development Plan Approval for Kikeh Area in Deepwater Malaysia]<br />
# [http://killajoules.wikidot.com/archive:malaysia-names-first-deepwater-fpso/ Malaysia Names First Deepwater FPSO]<br />
# [http://killajoules.wikidot.com/archive:technip-awarded-first-spar-platform-in-malaysia-for Technip awarded first spar platform in Malaysia for the Kikeh field]<br />
# [https://abarrelfull.blogspot.com/2023/10/pttep-acquires-murphy-oil-corporations.html PTTEP acquires Murphy Oil Corporation’s business in Malaysia Strengthen long-term growth in Southeast Asia]<br />
<br />
[[category:Field]]<br />
[[category:Malaysia]]<br />
[[category:Petronas]]<br />
[[category:PTTEP]]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Kikeh_Oil_Field&diff=73521Kikeh Oil Field2024-03-28T16:56:06Z<p>Abarrelfull: </p>
<hr />
<div>=== Summary Information ===<br />
* Operator: PTTEP<br />
* Country: Malaysia<br />
* Location: Block K, Offshore Sabah<br />
* Production start: 2007<br />
* Partners: Petronas<br />
* Type: [[Kikeh Crude Oil]]<br />
* Estimated Reserves:<br />
* Production Volume:<br />
<br />
=== Description ===<br />
* Kikeh was the first deepwater development in Malaysia and the Asia Pacific region<br />
* It is located in approximately 1350 metre water depth<br />
* The field consists of a floating production storage and offloading (FPSO) vessel, [[Kikeh FPSO]], receiving production from both wet-tree subsea wells and dry-tree wells drilled from a spar dry tree unit.<br />
* The FSPO has the capacity to store up to two million barrels of crude oil, and will be able to process 120,000 barrels of oil per day, with an offloading rate of 37,500 barrels per hour<br />
<br />
=== Contractors ===<br />
* **Aker Kvaerner:** Engineering, procurement, construction and commissioning assistance of the subsea production systems<br />
* **Aker Solutions:** Umbilicals<br />
* **SapuraAcergy:** Complete engineering, procurement, installation and commissioning of a 138 kilometre 12-inch diameter export pipeline<br />
* **MCS Kenny:** technical specification and acted as technical representative and also provided engineering support for the riser and completion tubing system <br />
* **Technip:** <br />
** Design, supply and installation of flexible flowlines and risers, holdback anchors, the installation of control umbilicals and manifolds, tie-in of the subsea wellheads, hook-up of the risers to the Kikeh floating production and offloading system (FPSO) and the pre-commissioning of the system<br />
** Engineering, construction and installation of a Spar floating production platform complete with topsides facilities, hull, mooring system and riser/wellhead systems<br />
* **MMHE:** Construction of the floating production storage and offloading (FPSO) facility <br />
* '''McDermott:''' <br />
** EPCI, pre-commissioning & commissioning assistance for Flexible flowlines, umbilical & flying leads for the Subsea Expansion Project <br />
** Kikeh subsea gas lift project: Transportation, installation and commissioning contract to remove the existing flexible gas lift riser and perform the installation and commissioning of a new dynamic riser section and flowline comprised of two thermoplastic composite pipe jumpers. <br />
<br />
=== History ===<br />
* 2002 - Field discovered by Murphy Oil<br />
* 2004 - Oil deposits discovered at lower depths<br />
* 2004 - Murphy Oil Announces Field Development Plan Approval <br />
* 2005 - Aker Kvaerner won contract for the engineering, procurement, construction and commissioning assistance of the subsea production systems<br />
* 2005 - Technip awarded contract for the engineering, construction and installation of a Spar floating production platform<br />
* 2007 - FSPO launched<br />
* 2007 - Brought first production on line<br />
* 2007 - SapuraAcergy joint venture awarded pipeline deepwater installation contract<br />
* 2019 - PTTEP acquires Murphy's Malaysia business<br />
* 2024 - McDermott contract for subsea gas lift project<br />
<br />
=== Geology ===<br />
* <br />
<br />
=== Links ===<br />
# [http://www.woodgroup.com/about-us/success-stories/subsea-flexible-flowlines-risers/pages/default.aspx Project Details from Wood Group]<br />
# [http://www.murphyoilcorp.com/operations/expro/malaysia.aspx Murphy Oil, Malaysia]<br />
# [[Aker Solutions Umbilical References]]<br />
# [[McDermott Subsea References]]<br />
# [http://killajoules.wikidot.com/blog:1148 Aker Solutions wins subsea contract in Malaysia]<br />
# [http://killajoules.wikidot.com/archive:aker-kvaerner-subsea-contract-in-malyasia Aker Kvaerner Subsea contract in Malyasia]<br />
# [http://killajoules.wikidot.com/archive:sapuraacergy-joint-venture-awarded-175-million-kikeh SapuraAcergy joint venture awarded $175 million Kikeh pipeline deepwater installation contract in Asia]<br />
# [http://killajoules.wikidot.com/archive:murphy-oil-announces-successful-results-at-the-kikeh/ Murphy Oil Announces Successful Results at the Kikeh #7 Well and the Discovery of Deeper Oil Reservoirs]<br />
# [http://killajoules.wikidot.com/archive:technip-awarded-contract-in-malaysia-for-the-kikeh-f/ Technip awarded contract in Malaysia for the Kikeh field subsea development]<br />
# [http://killajoules.wikidot.com/archive:murphy-oil-announces-field-development-plan-approval/ Murphy Oil Announces Field Development Plan Approval for Kikeh Area in Deepwater Malaysia]<br />
# [http://killajoules.wikidot.com/archive:malaysia-names-first-deepwater-fpso/ Malaysia Names First Deepwater FPSO]<br />
# [http://killajoules.wikidot.com/archive:technip-awarded-first-spar-platform-in-malaysia-for Technip awarded first spar platform in Malaysia for the Kikeh field]<br />
# [https://abarrelfull.blogspot.com/2023/10/pttep-acquires-murphy-oil-corporations.html PTTEP acquires Murphy Oil Corporation’s business in Malaysia Strengthen long-term growth in Southeast Asia]<br />
<br />
[[category:Field]]<br />
[[category:Malaysia]]<br />
[[category:Petronas]]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Satah_Al-Razboot_SARB_Oil_Field&diff=73520Satah Al-Razboot SARB Oil Field2024-03-28T16:52:08Z<p>Abarrelfull: </p>
<hr />
<div>=== Summary Information ===<br />
* Operator: ADMA-OPCO<br />
* Country: UAE<br />
* Location: 120 kilometres to the northwest of Abu Dhabi<br />
* Production start: 2016 - Expected<br />
* Partners: <br />
* Type: Oil / Gas<br />
* Estimated Reserves: <br />
* Production Volume: <br />
<br />
=== Description ===<br />
* The Satah Al-Razboot (SARB) Full Field Development Project includes an untapped oil field that will prospectively pump 100,000 barrels per day<br />
* Drilling is conducted from two artificial islands (Al Qatia and Bu Sikeen) with the well fluid sent by subsea pipeline to a facility on Zirku Island for processing, storage and export.<br />
<br />
=== Contractors ===<br />
* '''Fluor:''' Design of offshore wellhead facilities, subsea and in-field pipelines, the onshore scope including receiving, processing, storage and support facilities, and the supporting utilities and infrastructure.<br />
* '''Petrofac:''' <br />
** 200km of subsea pipelines for well fluid, water injection, gas injection, flare and export, along with 3km of onshore pipeline and 55km of subsea power and communication cables. <br />
** The provision of two riser platforms and four flare platforms with four interconnecting bridges and one single point mooring (SPM) buoy located at the north of Zirku Island. <br />
** The onshore scope of the contract includes the following: drilling utilities, foundations on SARB1 and SARB2, transport, install, hook up and assistance in the commissioning of the accommodation modules.<br />
* '''JDR:''' design and manufacture of five subsea power and communication (composite) cables and associated accessories<br />
<br />
=== History ===<br />
* 2010 - Fluor Wins FEED Contract for full field development<br />
* 2013 - Petrofac awarded major subsea project<br />
* 2018 - OMV awarded a 20% stake<br />
* 2018 - First oil produced<br />
* 2021 - Cepsa sold its stake to TotalEnergies<br />
* 2021 - ADNOC awarded drilling contracts to expand production<br />
<br />
=== Geology ===<br />
* <br />
<br />
=== Links ===<br />
# [[Bluewater Calm Buoy Mooring References]]<br />
# [http://killajoules.wikidot.com/archive:fluor-wins-offshore-feed-contract-in-abu-dhabi Fluor Wins Offshore FEED Contract in Abu Dhabi]<br />
# [http://killajoules.wikidot.com/archive:petrofac-awarded-us-500-million-offshore-project-in Petrofac Awarded US$500 Million Offshore Project in Abu Dhabi]<br />
# [http://killajoules.wikidot.com/archive:petrofac-awards-jdr-contract-for-subsea-power-cables Petrofac Awards JDR Contract For Subsea Power Cables At Abu Dhabi’s Satah Al-Razboot (Sarb) Offshore Oil Field Development]<br />
# [https://abarrelfull.blogspot.com/2024/03/sarb-umm-lulu-concession-fields.html SARB & Umm Lulu concession fields]<br />
# [https://abarrelfull.blogspot.com/2024/03/omv-started-production-in-abu-dhabi.html OMV started production in Abu Dhabi]<br />
# [https://abarrelfull.blogspot.com/2023/10/cepsa-accelerates-its-positive-motion.html Cepsa accelerates its Positive Motion strategy implementation with the sale of its upstream assets in Abu Dhabi to TotalEnergies]<br />
# [https://abarrelfull.blogspot.com/2024/03/adnoc-invests-over-750-million-in.html ADNOC Invests Over $750 Million in Drilling-related Services to Support Production Capacity Growth]<br />
<br />
[[category:Field]]<br />
[[category:UAE]]<br />
[[category:ADNOC]]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Fenix_Offshore_Gas_Field&diff=73519Fenix Offshore Gas Field2024-03-26T16:47:04Z<p>Abarrelfull: </p>
<hr />
<div>=== Summary Information ===<br />
* Operator: TotalEnergies<br />
* Country: Argentina<br />
* Location: Offshore Southern Argentina<br />
* Production start: expected 2025<br />
* Partners: TotalEnergies 37.5%, WintershallDea (37.5%) and Pan American Sur (25%).<br />
* Type: Gas<br />
* Estimated Reserves: <br />
* Production Volume: <br />
<br />
=== Description ===<br />
* The Fenix field will be developed through three horizontal wells, drilled from a new unmanned platform in 70 meters water depth. The gas will be transported through a 35km pipeline to the TotalEnergies-operated [[Vega Pleyade Offshore Gas Field | Véga Pleyade platform]] and treated onshore at the Rio Cullen and Cañadon Alfa plants, also operated by the Company. <br />
* At production start-up, expected early 2025, Fenix will produce10 million cubic meters per day of natural gas (70,000 barrels of oil equivalent per day). This development represents an investment of approximately $706 million.<br />
* Fenix gas field is part of the Cuenca Marina Austral (CMA-1) license<br />
<br />
=== Contractors ===<br />
* '''Rosetti Marino:''' Construction of the platform<br />
* '''Hereema:''' Installation of the platform<br />
* '''Corinth Pipeworks:''' Manufacture and supply approximately 40km of 24” longitudinally submerged arc welded steel pipes<br />
<br />
=== History ===<br />
* 2022 - Final investment decision<br />
* 2024 - Fenix platform installed<br />
<br />
=== Geology ===<br />
* <br />
<br />
=== Links ===<br />
# [https://abarrelfull.blogspot.com/2023/03/argentina-launch-of-fenix-offshore-gas.html Argentina: Launch of the Fenix Offshore Gas Project]<br />
# [https://abarrelfull.blogspot.com/2023/03/corinth-pipeworks-is-awarded-fenix.html Corinth Pipeworks is awarded Fenix offshore gas field in Argentina by TotalEnergies]<br />
# [https://a-barrel-full.blogspot.com/2024/03/successful-installation-of-fenix.html Successful installation of Fénix Platform off the coast of Argentina]<br />
<br />
<br />
[[category:Field]]<br />
[[category:Argentina]]<br />
[[category:Total]]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Umm_Lulu_Oil_Field&diff=73518Umm Lulu Oil Field2024-03-26T13:56:45Z<p>Abarrelfull: </p>
<hr />
<div>=== Summary Information ===<br />
* Operator: ADMA OPCO<br />
* Country: UAE - Abu Dhabi<br />
* Location: 30 kilometers northwest of Abu Dhabi in the Arabian Gulf<br />
* Production start: 2014<br />
* Partners: Inpex, BP, Total<br />
* Type: Oil<br />
* Estimated Reserves:<br />
* Production Volume:<br />
<br />
=== Description ===<br />
* In the first development phase, oil production from the Umm Lulu Oil Field has commenced by utilizing existing facilities of the Umm Al-Dalkh Oil Field<br />
* The oil produced from the Umm Lulu Oil Field in the first development phase is transported via an existing subsea pipeline to Zirku Island<br />
* The Umm Lulu Phase II field development includes six wellhead towers, production facilities, living quarters, infield subsea pipelines and the export pipeline to Zirku Island. <br />
* The project is a tie-in to ADMA-OPCO's [[Satah Al-Razboot SARB Oil Field | SARB project]] for further processing at the Zirku Island facilities.<br />
<br />
=== Contractors ===<br />
* '''AMEC:''' Project Management Consultancy (PMC) services contract<br />
* '''Fluor:''' front-end engineering and design (FEED)<br />
* '''Technip:''' Detailed engineering, procurement, fabrication, offshore installation, commissioning and start-up of a large offshore super complex<br />
<br />
=== History ===<br />
* 2010 - Fluor awarded the front-end engineering and design (FEED) contract<br />
* 2012 - AMEC awarded PMC services contract <br />
* 2013 - Technip awarded offshore super complex contract<br />
* 2014 - First early oil produced<br />
* 2018 - OMV awarded a 20% stake<br />
* 2018 - Full production started<br />
* 2023 - Cepsa sold its stake to TotalEnergies<br />
<br />
=== Geology ===<br />
* <br />
<br />
=== Links ===<br />
# [[NPCC Offshore Project References]]<br />
# [http://killajoules.wikidot.com/blog:2153 AMEC awarded PMC services contract for ADMA OPCO’s multi-billion dollar Nasr and Umm Lulu fields, UAE]<br />
# [http://killajoules.wikidot.com/archive:fluor-wins-umm-lulu-offshore-feed-contract-in-abu-dh/ Fluor Wins Umm Lulu Offshore Feed Contract in Abu Dhabi]<br />
# [http://killajoules.wikidot.com/blog:4482 Technip awarded contract for the development of the Umm Lulu field in Abu Dhabi]<br />
# [http://killajoules.wikidot.com/blog:5581 INPEX Commences Oil Production from Umm Lulu Oil Field Offshore Abu Dhabi, United Arab Emirates]<br />
# [https://abarrelfull.blogspot.com/2024/03/sarb-umm-lulu-concession-fields.html SARB & Umm Lulu concession fields]<br />
# [https://abarrelfull.blogspot.com/2024/03/omv-started-production-in-abu-dhabi.html OMV started production in Abu Dhabi]<br />
# [https://abarrelfull.blogspot.com/2023/10/cepsa-accelerates-its-positive-motion.html Cepsa accelerates its Positive Motion strategy implementation with the sale of its upstream assets in Abu Dhabi to TotalEnergies]<br />
<br />
[[category:Field]]<br />
[[category:UAE]]<br />
[[category:ADNOC]]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Satah_Al-Razboot_SARB_Oil_Field&diff=73517Satah Al-Razboot SARB Oil Field2024-03-26T13:54:25Z<p>Abarrelfull: </p>
<hr />
<div>=== Summary Information ===<br />
* Operator: ADMA-OPCO<br />
* Country: UAE<br />
* Location: 120 kilometres to the northwest of Abu Dhabi<br />
* Production start: 2016 - Expected<br />
* Partners: <br />
* Type: Oil / Gas<br />
* Estimated Reserves: <br />
* Production Volume: <br />
<br />
=== Description ===<br />
* The Satah Al-Razboot (SARB) Full Field Development Project includes an untapped oil field that will prospectively pump 100,000 barrels per day<br />
* Drilling is conducted from two artificial islands (Al Qatia and Bu Sikeen) with the well fluid sent by subsea pipeline to a facility on Zirku Island for processing, storage and export.<br />
<br />
=== Contractors ===<br />
* '''Fluor:''' Design of offshore wellhead facilities, subsea and in-field pipelines, the onshore scope including receiving, processing, storage and support facilities, and the supporting utilities and infrastructure.<br />
* '''Petrofac:''' <br />
** 200km of subsea pipelines for well fluid, water injection, gas injection, flare and export, along with 3km of onshore pipeline and 55km of subsea power and communication cables. <br />
** The provision of two riser platforms and four flare platforms with four interconnecting bridges and one single point mooring (SPM) buoy located at the north of Zirku Island. <br />
** The onshore scope of the contract includes the following: drilling utilities, foundations on SARB1 and SARB2, transport, install, hook up and assistance in the commissioning of the accommodation modules.<br />
* '''JDR:''' design and manufacture of five subsea power and communication (composite) cables and associated accessories<br />
<br />
=== History ===<br />
* 2010 - Fluor Wins FEED Contract for full field development<br />
* 2013 - Petrofac awarded major subsea project<br />
* 2018 - First oil produced<br />
* 2021 - Cepsa sold its stake to TotalEnergies<br />
* 2021 - ADNOC awarded drilling contracts to expand production<br />
<br />
=== Geology ===<br />
* <br />
<br />
=== Links ===<br />
# [[Bluewater Calm Buoy Mooring References]]<br />
# [http://killajoules.wikidot.com/archive:fluor-wins-offshore-feed-contract-in-abu-dhabi Fluor Wins Offshore FEED Contract in Abu Dhabi]<br />
# [http://killajoules.wikidot.com/archive:petrofac-awarded-us-500-million-offshore-project-in Petrofac Awarded US$500 Million Offshore Project in Abu Dhabi]<br />
# [http://killajoules.wikidot.com/archive:petrofac-awards-jdr-contract-for-subsea-power-cables Petrofac Awards JDR Contract For Subsea Power Cables At Abu Dhabi’s Satah Al-Razboot (Sarb) Offshore Oil Field Development]<br />
# [https://abarrelfull.blogspot.com/2024/03/omv-started-production-in-abu-dhabi.html OMV started production in Abu Dhabi]<br />
# [https://abarrelfull.blogspot.com/2023/10/cepsa-accelerates-its-positive-motion.html Cepsa accelerates its Positive Motion strategy implementation with the sale of its upstream assets in Abu Dhabi to TotalEnergies]<br />
# [https://abarrelfull.blogspot.com/2024/03/adnoc-invests-over-750-million-in.html ADNOC Invests Over $750 Million in Drilling-related Services to Support Production Capacity Growth]<br />
<br />
[[category:Field]]<br />
[[category:UAE]]<br />
[[category:ADNOC]]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Umm_Lulu_Oil_Field&diff=73516Umm Lulu Oil Field2024-03-26T13:54:19Z<p>Abarrelfull: </p>
<hr />
<div>=== Summary Information ===<br />
* Operator: ADMA OPCO<br />
* Country: UAE - Abu Dhabi<br />
* Location: 30 kilometers northwest of Abu Dhabi in the Arabian Gulf<br />
* Production start: 2014<br />
* Partners: Inpex, BP, Total<br />
* Type: Oil<br />
* Estimated Reserves:<br />
* Production Volume:<br />
<br />
=== Description ===<br />
* In the first development phase, oil production from the Umm Lulu Oil Field has commenced by utilizing existing facilities of the Umm Al-Dalkh Oil Field<br />
* The oil produced from the Umm Lulu Oil Field in the first development phase is transported via an existing subsea pipeline to Zirku Island<br />
* The Umm Lulu Phase II field development includes six wellhead towers, production facilities, living quarters, infield subsea pipelines and the export pipeline to Zirku Island. <br />
* The project is a tie-in to ADMA-OPCO's [[Satah Al-Razboot SARB Oil Field | SARB project]] for further processing at the Zirku Island facilities.<br />
<br />
=== Contractors ===<br />
* '''AMEC:''' Project Management Consultancy (PMC) services contract<br />
* '''Fluor:''' front-end engineering and design (FEED)<br />
* '''Technip:''' Detailed engineering, procurement, fabrication, offshore installation, commissioning and start-up of a large offshore super complex<br />
<br />
=== History ===<br />
* 2010 - Fluor awarded the front-end engineering and design (FEED) contract<br />
* 2012 - AMEC awarded PMC services contract <br />
* 2013 - Technip awarded offshore super complex contract<br />
* 2014 - First early oil produced<br />
* 2018 - Full production started<br />
* 2023 - Cepsa sold its stake to TotalEnergies<br />
<br />
=== Geology ===<br />
* <br />
<br />
=== Links ===<br />
# [[NPCC Offshore Project References]]<br />
# [http://killajoules.wikidot.com/blog:2153 AMEC awarded PMC services contract for ADMA OPCO’s multi-billion dollar Nasr and Umm Lulu fields, UAE]<br />
# [http://killajoules.wikidot.com/archive:fluor-wins-umm-lulu-offshore-feed-contract-in-abu-dh/ Fluor Wins Umm Lulu Offshore Feed Contract in Abu Dhabi]<br />
# [http://killajoules.wikidot.com/blog:4482 Technip awarded contract for the development of the Umm Lulu field in Abu Dhabi]<br />
# [http://killajoules.wikidot.com/blog:5581 INPEX Commences Oil Production from Umm Lulu Oil Field Offshore Abu Dhabi, United Arab Emirates]<br />
# [https://abarrelfull.blogspot.com/2024/03/omv-started-production-in-abu-dhabi.html OMV started production in Abu Dhabi]<br />
# [https://abarrelfull.blogspot.com/2023/10/cepsa-accelerates-its-positive-motion.html Cepsa accelerates its Positive Motion strategy implementation with the sale of its upstream assets in Abu Dhabi to TotalEnergies]<br />
<br />
[[category:Field]]<br />
[[category:UAE]]<br />
[[category:ADNOC]]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Umm_Lulu_Oil_Field&diff=73515Umm Lulu Oil Field2024-03-26T13:53:13Z<p>Abarrelfull: </p>
<hr />
<div>=== Summary Information ===<br />
* Operator: ADMA OPCO<br />
* Country: UAE - Abu Dhabi<br />
* Location: 30 kilometers northwest of Abu Dhabi in the Arabian Gulf<br />
* Production start: 2014<br />
* Partners: Inpex, BP, Total<br />
* Type: Oil<br />
* Estimated Reserves:<br />
* Production Volume:<br />
<br />
=== Description ===<br />
* In the first development phase, oil production from the Umm Lulu Oil Field has commenced by utilizing existing facilities of the Umm Al-Dalkh Oil Field<br />
* The oil produced from the Umm Lulu Oil Field in the first development phase is transported via an existing subsea pipeline to Zirku Island<br />
* The Umm Lulu Phase II field development includes six wellhead towers, production facilities, living quarters, infield subsea pipelines and the export pipeline to Zirku Island. <br />
* The project will tie into ADMA-OPCO's SARB project for further processing at the Zirku Island facilities.<br />
<br />
=== Contractors ===<br />
* '''AMEC:''' Project Management Consultancy (PMC) services contract<br />
* '''Fluor:''' front-end engineering and design (FEED)<br />
* '''Technip:''' Detailed engineering, procurement, fabrication, offshore installation, commissioning and start-up of a large offshore super complex<br />
<br />
=== History ===<br />
* 2010 - Fluor awarded the front-end engineering and design (FEED) contract<br />
* 2012 - AMEC awarded PMC services contract <br />
* 2013 - Technip awarded offshore super complex contract<br />
* 2014 - First early oil produced<br />
* 2018 - Full production started<br />
* 2023 - Cepsa sold its stake to TotalEnergies<br />
<br />
=== Geology ===<br />
* <br />
<br />
=== Links ===<br />
# [[NPCC Offshore Project References]]<br />
# [http://killajoules.wikidot.com/blog:2153 AMEC awarded PMC services contract for ADMA OPCO’s multi-billion dollar Nasr and Umm Lulu fields, UAE]<br />
# [http://killajoules.wikidot.com/archive:fluor-wins-umm-lulu-offshore-feed-contract-in-abu-dh/ Fluor Wins Umm Lulu Offshore Feed Contract in Abu Dhabi]<br />
# [http://killajoules.wikidot.com/blog:4482 Technip awarded contract for the development of the Umm Lulu field in Abu Dhabi]<br />
# [http://killajoules.wikidot.com/blog:5581 INPEX Commences Oil Production from Umm Lulu Oil Field Offshore Abu Dhabi, United Arab Emirates]<br />
# [https://abarrelfull.blogspot.com/2024/03/omv-started-production-in-abu-dhabi.html OMV started production in Abu Dhabi]<br />
# [https://abarrelfull.blogspot.com/2023/10/cepsa-accelerates-its-positive-motion.html Cepsa accelerates its Positive Motion strategy implementation with the sale of its upstream assets in Abu Dhabi to TotalEnergies]<br />
<br />
[[category:Field]]<br />
[[category:UAE]]<br />
[[category:ADNOC]]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Umm_Lulu_Oil_Field&diff=73514Umm Lulu Oil Field2024-03-26T13:35:58Z<p>Abarrelfull: </p>
<hr />
<div>=== Summary Information ===<br />
* Operator: ADMA OPCO<br />
* Country: UAE - Abu Dhabi<br />
* Location: 30 kilometers northwest of Abu Dhabi in the Arabian Gulf<br />
* Production start: 2014<br />
* Partners: Inpex, BP, Total<br />
* Type: Oil<br />
* Estimated Reserves:<br />
* Production Volume:<br />
<br />
=== Description ===<br />
* In the first development phase, oil production from the Umm Lulu Oil Field has commenced by utilizing existing facilities of the Umm Al-Dalkh Oil Field<br />
* The oil produced from the Umm Lulu Oil Field in the first development phase is transported via an existing subsea pipeline to Zirku Island<br />
* The Umm Lulu Phase II field development includes six wellhead towers, production facilities, living quarters, infield subsea pipelines and the export pipeline to Zirku Island. <br />
* The project will tie into ADMA-OPCO's SARB project for further processing at the Zirku Island facilities.<br />
<br />
=== Contractors ===<br />
* '''AMEC:''' Project Management Consultancy (PMC) services contract<br />
* '''Fluor:''' front-end engineering and design (FEED)<br />
* '''Technip:''' Detailed engineering, procurement, fabrication, offshore installation, commissioning and start-up of a large offshore super complex<br />
<br />
=== History ===<br />
* 2010 - Fluor awarded the front-end engineering and design (FEED) contract<br />
* 2012 - AMEC awarded PMC services contract <br />
* 2013 - Technip awarded offshore super complex contract<br />
* 2014 - First oil produced<br />
* 2023 - Cepsa sold its stake to TotalEnergies<br />
<br />
=== Geology ===<br />
* <br />
<br />
=== Links ===<br />
# [[NPCC Offshore Project References]]<br />
# [http://killajoules.wikidot.com/blog:2153 AMEC awarded PMC services contract for ADMA OPCO’s multi-billion dollar Nasr and Umm Lulu fields, UAE]<br />
# [http://killajoules.wikidot.com/archive:fluor-wins-umm-lulu-offshore-feed-contract-in-abu-dh/ Fluor Wins Umm Lulu Offshore Feed Contract in Abu Dhabi]<br />
# [http://killajoules.wikidot.com/blog:4482 Technip awarded contract for the development of the Umm Lulu field in Abu Dhabi]<br />
# [http://killajoules.wikidot.com/blog:5581 INPEX Commences Oil Production from Umm Lulu Oil Field Offshore Abu Dhabi, United Arab Emirates]<br />
# [https://abarrelfull.blogspot.com/2023/10/cepsa-accelerates-its-positive-motion.html Cepsa accelerates its Positive Motion strategy implementation with the sale of its upstream assets in Abu Dhabi to TotalEnergies]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Satah_Al-Razboot_SARB_Oil_Field&diff=73513Satah Al-Razboot SARB Oil Field2024-03-26T13:31:49Z<p>Abarrelfull: </p>
<hr />
<div>=== Summary Information ===<br />
* Operator: ADMA-OPCO<br />
* Country: UAE<br />
* Location: 120 kilometres to the northwest of Abu Dhabi<br />
* Production start: 2016 - Expected<br />
* Partners: <br />
* Type: Oil / Gas<br />
* Estimated Reserves: <br />
* Production Volume: <br />
<br />
=== Description ===<br />
* The Satah Al-Razboot (SARB) Full Field Development Project includes an untapped oil field that will prospectively pump 100,000 barrels per day<br />
* Drilling is conducted from two artificial islands (Al Qatia and Bu Sikeen) with the well fluid sent by subsea pipeline to a facility on Zirku Island for processing, storage and export.<br />
<br />
=== Contractors ===<br />
* '''Fluor:''' Design of offshore wellhead facilities, subsea and in-field pipelines, the onshore scope including receiving, processing, storage and support facilities, and the supporting utilities and infrastructure.<br />
* '''Petrofac:''' <br />
** 200km of subsea pipelines for well fluid, water injection, gas injection, flare and export, along with 3km of onshore pipeline and 55km of subsea power and communication cables. <br />
** The provision of two riser platforms and four flare platforms with four interconnecting bridges and one single point mooring (SPM) buoy located at the north of Zirku Island. <br />
** The onshore scope of the contract includes the following: drilling utilities, foundations on SARB1 and SARB2, transport, install, hook up and assistance in the commissioning of the accommodation modules.<br />
* '''JDR:''' design and manufacture of five subsea power and communication (composite) cables and associated accessories<br />
<br />
=== History ===<br />
* 2010 - Fluor Wins FEED Contract for full field development<br />
* 2013 - Petrofac awarded major subsea project<br />
* 2021 - Cepsa sold its stake to TotalEnergies<br />
* 2021 - ADNOC awarded drilling contracts to expand production<br />
<br />
=== Geology ===<br />
* <br />
<br />
=== Links ===<br />
# [[Bluewater Calm Buoy Mooring References]]<br />
# [http://killajoules.wikidot.com/archive:fluor-wins-offshore-feed-contract-in-abu-dhabi Fluor Wins Offshore FEED Contract in Abu Dhabi]<br />
# [http://killajoules.wikidot.com/archive:petrofac-awarded-us-500-million-offshore-project-in Petrofac Awarded US$500 Million Offshore Project in Abu Dhabi]<br />
# [http://killajoules.wikidot.com/archive:petrofac-awards-jdr-contract-for-subsea-power-cables Petrofac Awards JDR Contract For Subsea Power Cables At Abu Dhabi’s Satah Al-Razboot (Sarb) Offshore Oil Field Development]<br />
# [https://abarrelfull.blogspot.com/2023/10/cepsa-accelerates-its-positive-motion.html Cepsa accelerates its Positive Motion strategy implementation with the sale of its upstream assets in Abu Dhabi to TotalEnergies]<br />
# [https://abarrelfull.blogspot.com/2024/03/adnoc-invests-over-750-million-in.html ADNOC Invests Over $750 Million in Drilling-related Services to Support Production Capacity Growth]<br />
<br />
[[category:Field]]<br />
[[category:UAE]]<br />
[[category:ADNOC]]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Upper_Zakum_Oil_Field&diff=73512Upper Zakum Oil Field2024-03-26T13:31:44Z<p>Abarrelfull: </p>
<hr />
<div>=== Summary Information ===<br />
* Operator: ZADCO (ADNOC)<br />
* Country: United Arab Emirates<br />
* Location: Offshore<br />
* Production start: <br />
* Partners: Inpex, Exxon<br />
* Type: Oil <br />
* Estimated Reserves:<br />
* Production Volume: Currently producing a million barrels a day<br />
<br />
=== Description ===<br />
* Located 84 Kms. north west of Abu Dhabi Islands , UZ field covers around 1,200 sq Kms of the Gulf marine areas. It is the second largest offshore oil field and the fourth largest oil field in the world.<br />
* The field originally had 90 platforms, but now comprises four artificial islands with associated drilling and production facilities<br />
* The [[Zirku Oil Processing Plant]] at Zirku Island comprise three oil processing trains and one train on stand-by. <br />
* An expansion project increased production capacity from 500 kbpd to 750 kbpd and an additional expansion project, UZ 750, is under way to increase production to 1m bpd by 2024. It involves four new artificial islands, to accommodate drilling rigs, processing facilities and infrastructure required to handle production capacity growth<br />
<br />
<br />
=== Contractors ===<br />
* '''REL:''' Construction of Upper Zakum Modules<br />
* '''ETPM:''' Installation of Pipelines<br />
* '''AMEC:''' Engineering, consultancy and project management services extending from concept stage through front-end engineering design (FEED), design, construction and commissioning of several projects<br />
* '''McDermott:''' Water Injection Capacity & Pressure Upgrade Project - Engineering, procurement, construction, installation<br />
<br />
==== UZ 750 project ====<br />
* '''Technip/NPCC:'''<br />
** front-end engineering design for process units on four artificial islands, including gas separation, gas lift compression, booster gas compression, as well as power generation, utilities, interconnecting pipelines and modification of existing facilities,<br />
** procurement services for long lead items.<br />
* '''Foster Wheeler:''' Availability and reliability study for the expansion of the Zirku oil processing facilities<br />
* '''TWMA:''' design, commission and operate an advanced solids control and fluid recovery system for the artificial islands project<br />
<br />
=== History ===<br />
* 1963 - Oil Discovered in Upper Zakum field<br />
* 1977 - Field development launched<br />
* 1978 - Inpex became a partner<br />
* 2006 - Exxon joined the development<br />
* 2008 - AMEC wins five-year offshore programme management consultancy contract<br />
* 2011 - Technip awarded FEED for UZ 750 project<br />
* 2014 - Technip awarded contract to replace pipelines<br />
* 2017 - Expansion project launched<br />
* 2021 - ADNOC awarded drilling contracts to expand production<br />
<br />
=== Geology ===<br />
* <br />
<br />
=== Links ===<br />
# [http://www.zadco.com/ ZADCO]<br />
# [[International Protective Coatings Platform References]]<br />
# [[McDermott Platform References]]<br />
# [[NPCC Offshore Project References]]<br />
# [[Serimax Pipeline References]]<br />
# [http://killajoules.wikidot.com/archive:amec-wins-five-year-offshore-programme-management-co AMEC wins five-year offshore programme management consultancy contract, Abu Dhabi]<br />
# [http://killajoules.wikidot.com/blog:686 Technip awarded Offshore contract in the United Arab Emirates]<br />
# [http://killajoules.wikidot.com/blog:594 Foster Wheeler Awarded Availability and Reliability Study by ZADCO in the UAE]<br />
# [http://killajoules.wikidot.com/blog:2892 Technip-NPCC consortium awarded important contract for the Upper Zakum field in Abu Dhabi]<br />
# [http://killajoules.wikidot.com/blog:3494 Flagship project leads to Middle East growth for TWMA]<br />
# [http://killajoules.wikidot.com/blog:4946 ADMA-OPCO selects Technip for Project Management Consultancy services for the Zakum field offshore Abu Dhabi]<br />
# [http://killajoules.wikidot.com/blog:5982 Amec Foster Wheeler wins Upper Zakum Field contract extension]<br />
# [https://abarrelfull.blogspot.com/2023/02/upper-zakum-field-production-capacity.html Upper Zakum Field Production Capacity to Increase to 1 Million Barrels Per Day]<br />
# [https://abarrelfull.blogspot.com/2023/02/adnoc-and-exxonmobil-ceos-discuss-new.html ADNOC and ExxonMobil CEOs Discuss New Opportunities During Visit to Review Progress of US$ 30 Billion Upper Zakum Expansion]<br />
# [https://abarrelfull.blogspot.com/2024/03/adnoc-invests-over-750-million-in.html ADNOC Invests Over $750 Million in Drilling-related Services to Support Production Capacity Growth]<br />
<br />
[[category:Field]]<br />
[[category:UAE]]<br />
[[category:ADNOC]]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Satah_Al-Razboot_SARB_Oil_Field&diff=73511Satah Al-Razboot SARB Oil Field2024-03-26T13:26:13Z<p>Abarrelfull: </p>
<hr />
<div>=== Summary Information ===<br />
* Operator: ADMA-OPCO<br />
* Country: UAE<br />
* Location: 120 kilometres to the northwest of Abu Dhabi<br />
* Production start: 2016 - Expected<br />
* Partners: <br />
* Type: Oil / Gas<br />
* Estimated Reserves: <br />
* Production Volume: <br />
<br />
=== Description ===<br />
* The Satah Al-Razboot (SARB) Full Field Development Project includes an untapped oil field that will prospectively pump 100,000 barrels per day<br />
* Drilling is conducted from two artificial islands (Al Qatia and Bu Sikeen) with the well fluid sent by subsea pipeline to a facility on Zirku Island for processing, storage and export.<br />
<br />
=== Contractors ===<br />
* '''Fluor:''' Design of offshore wellhead facilities, subsea and in-field pipelines, the onshore scope including receiving, processing, storage and support facilities, and the supporting utilities and infrastructure.<br />
* '''Petrofac:''' <br />
** 200km of subsea pipelines for well fluid, water injection, gas injection, flare and export, along with 3km of onshore pipeline and 55km of subsea power and communication cables. <br />
** The provision of two riser platforms and four flare platforms with four interconnecting bridges and one single point mooring (SPM) buoy located at the north of Zirku Island. <br />
** The onshore scope of the contract includes the following: drilling utilities, foundations on SARB1 and SARB2, transport, install, hook up and assistance in the commissioning of the accommodation modules.<br />
* '''JDR:''' design and manufacture of five subsea power and communication (composite) cables and associated accessories<br />
<br />
=== History ===<br />
* 2010 - Fluor Wins FEED Contract for full field development<br />
* 2013 - Petrofac awarded major subsea project<br />
* 2021 - Cepsa sold its stake to TotalEnergies<br />
<br />
=== Geology ===<br />
* <br />
<br />
=== Links ===<br />
# [[Bluewater Calm Buoy Mooring References]]<br />
# [http://killajoules.wikidot.com/archive:fluor-wins-offshore-feed-contract-in-abu-dhabi Fluor Wins Offshore FEED Contract in Abu Dhabi]<br />
# [http://killajoules.wikidot.com/archive:petrofac-awarded-us-500-million-offshore-project-in Petrofac Awarded US$500 Million Offshore Project in Abu Dhabi]<br />
# [http://killajoules.wikidot.com/archive:petrofac-awards-jdr-contract-for-subsea-power-cables Petrofac Awards JDR Contract For Subsea Power Cables At Abu Dhabi’s Satah Al-Razboot (Sarb) Offshore Oil Field Development]<br />
# [https://abarrelfull.blogspot.com/2023/10/cepsa-accelerates-its-positive-motion.html Cepsa accelerates its Positive Motion strategy implementation with the sale of its upstream assets in Abu Dhabi to TotalEnergies]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Marathon_Salt_Lake_City_Refinery&diff=73510Marathon Salt Lake City Refinery2024-03-25T13:43:33Z<p>Abarrelfull: </p>
<hr />
<div>=== Summary Information ===<br />
* Ownership: Marathon Petroleum<br />
* Website: https://www.marathonpetroleum.com/<br />
* List of [[Marathon Petroleum Refineries]]<br />
* Location: Salt Lake City, Utah, USA<br />
* Capacity: 3.0 million tons/annum & 61,000 bbl/day<br />
* Nelson Complexity:<br />
* Refining Depth:<br />
=== Brief Description ===<br />
* A small medium complexity refinery<br />
=== Refining Units ===<br />
* Atmospheric Distillation<br />
* Fluidised Catalytic Cracking - 25,000<br />
* Catalytic Reforming - 12,000<br />
* Hydroprocessing<br />
** Naphtha -12,600<br />
** Gasoline - 8,000<br />
** Diesel - 14,000<br />
=== Terminal Capacity ===<br />
* Crude Oil:<br />
* Refined Products:<br />
<br />
=== Crude Supply ===<br />
* The refinery processes crude oil from Utah, Colorado, Wyoming and Canada<br />
=== Products Produced ===<br />
* gasoline, diesel fuel, jet fuel, heavy fuel oils and liquefied petroleum gas<br />
* The refinery is connected to the [[Northwest Product Pipeline]]<br />
=== Projects ===<br />
* The [[Tesoro Salt Lake City Refinery Project]] expanded crude oil throughput capacity by 7%<br />
* The project allows the Company to increase throughput of transportation-advantaged black wax and yellow wax crude oil to 21 mbpd, an increase of over 100%. The project also included capital for conversion unit upgrades designed to drive a nearly 3% increase in clean product yield at the refinery. <br />
=== Other Information ===<br />
-<br />
=== History ===<br />
* 1908 - Refinery operations begin<br />
* 2001 - Tesoro acquired the refinery from BP together with [[Mandan Refinery]]<br />
* 2011 - Tesoro Corporation Announces the Salt Lake City Expansion and Feedstock Advantage Project<br />
* 2018 - Marathon Petroleum acquired the refinery when it bought Andeavor<br />
=== Links ===<br />
# [https://www.marathonpetroleum.com/Operations/Refining/Salt-Lake-City-Refinery/ Refinery Webpage]<br />
# [http://killajoules.wikidot.com/blog:1690 Tesoro Corporation Announces the Salt Lake City Expansion and Feedstock Advantage Project]<br />
# [http://killajoules.wikidot.com/archive:tesoro-to-acquire-refineries-and-marketing-operation Tesoro To Acquire Refineries And Marketing Operations From BP]<br />
# [https://abarrelfull.blogspot.com/2024/03/marathon-petroleum-corp-and-andeavor.html Marathon Petroleum Corp. and Andeavor Combination to Create Leading U.S. Refining, Marketing, and Midstream Company]<br />
<br />
[[Category:Refinery]]<br />
[[Category:USA]]<br />
[[Category:Marathon]]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Carson_Los_Angeles_Refinery&diff=73509Carson Los Angeles Refinery2024-03-25T13:42:34Z<p>Abarrelfull: </p>
<hr />
<div>=== Summary Information ===<br />
* Ownership: Marathon Petroleum<br />
* Website: https://www.marathonpetroleum.com/<br />
* List of [[Marathon Petroleum Refineries]]<br />
* Location: Carson, Los Angeles County, California, USA<br />
* Capacity: 18.1 million tons/annum & 363.000 bbl/day<br />
* Nelson Complexity: 13.2<br />
* Refining Depth:<br />
=== Brief Description ===<br />
* A large and very complex refinery<br />
=== Refining Units ===<br />
* Atmospheric Distillation<br />
* Vacuum Distillation - 140,000<br />
* Delayed Coker - 67,100<br />
* Fluidised Catalytic Cracker - 102,500<br />
* Hydrocracker - 50,000<br />
* Catalytic Reformer - 10,000 + 43,000<br />
=== Terminal Capacity ===<br />
* Crude Oil:<br />
* Refined Products:<br />
=== Crude Supply ===<br />
* It processes ANS (Alaskan North Slope), Middle Eastern and West African crudes<br />
=== Products Produced ===<br />
* Gasoline - 6.3 million gallons/day<br />
* Jet Fuel - 1.7 million gallons/day<br />
* Diesel - 1.9 million gallons/day<br />
* Fuel Gases - 675 thousand gallons/day<br />
* Propylene - 65,000 lbs/day<br />
* Calcined Coke - 1,000 tons/day<br />
=== Ongoing Projects ===<br />
-<br />
=== Other Information ===<br />
-<br />
=== History ===<br />
* 1938 - Refinery brought on stream<br />
* 2000 - BP become owner following acquistion of ARCO<br />
* 2006 - New Vacuum Unit brought onstream to replace outdated unit<br />
* 2011 - BP announced it was seeking a buyer for the refinery<br />
* 2013 - Tesoro announced that it was acquiring the refinery<br />
* 2013 - FTC clearance given for acquistion<br />
* 2018 - Marathon Petroleum acquired the refinery when it bought Andeavor<br />
=== Links ===<br />
# [https://www.marathonpetroleum.com/Operations/Refining/Los-Angeles-Refinery/ Refinery Webpage]<br />
# [http://killajoules.wikidot.com/blog:468 BP to Reshape US Downstream Business and Seek Buyers for Texas City and Carson Refineries] <br />
# [http://killajoules.wikidot.com/blog:2945 Tesoro Corporation to Purchase BP's Fully Integrated Southern California Refining and Marketing Business]<br />
# [http://killajoules.wikidot.com/blog:4223 Tesoro Corporation Receives FTC Clearance for Purchase of BP's Southern California Refining and Marketing Business]<br />
# [https://abarrelfull.blogspot.com/2024/03/marathon-petroleum-corp-and-andeavor.html Marathon Petroleum Corp. and Andeavor Combination to Create Leading U.S. Refining, Marketing, and Midstream Company]<br />
<br />
[[Category:Refinery]]<br />
[[Category:USA]]<br />
[[Category:Marathon]]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=El_Paso_Refinery&diff=73508El Paso Refinery2024-03-25T13:42:08Z<p>Abarrelfull: </p>
<hr />
<div>=== Summary Information ===<br />
* Ownership: Marathon Petroleum<br />
* Website: https://www.marathonpetroleum.com/<br />
* List of [[Marathon Petroleum Refineries]]<br />
* Location: El Paso, Texas<br />
* Capacity: 6.25 million tons/annum & 125,000 bbl/day<br />
* Nelson Complexity: 7.9<br />
* Refining Depth:<br />
=== Brief Description ===<br />
* A small/medium scale medium complexity refinery, the combination of two old refineries<br />
=== Refining Units ===<br />
* Atmospheric Distillation<br />
* FCCU - 29,500 barrels per day,<br />
* Alkylation - 10,000 barrels per day<br />
* Reforming - 18,000 barrels per day<br />
=== Terminal Capacity ===<br />
* Crude Oil:<br />
* Refined Products:<br />
* Total: approximately 4.3 million barrels<br />
=== Crude Supply ===<br />
* Crude oil is delivered to the El Paso refinery via a 450-mile crude oil pipeline owned and operated by Kinder Morgan Energy Partners, (Kinder Morgan).<br />
* The system handles both sweet (WTI) and sour (WTS) crude oil.<br />
=== Products Produced ===<br />
* gasoline, distillates, heavy fuel oil, asphalt and propane<br />
=== Projects ===<br />
* The company developed the Delaware Basin System, to increase logistics capacity for crude for the refinery<br />
* A 40 Mile crude pipeline was constructed to supply Shale Oil to the refinery<br />
=== Other Information ===<br />
-<br />
=== History ===<br />
* 1928 - The "North" refinery was originally built by Standard Oil of California<br />
* 1931 - The "South" refinery was originally built by the Texas Company<br />
* 1972 - The North Refinery was subsequently modernized with the addition of a naphtha hydrotreater, catalytic reformer and sulfur plant<br />
* 1993 - The refinery was originally two facilities but the operations of the two plants were combined<br />
* 2017 - Tesoro acquired the refinery when it bought Western Refining<br />
* 2018 - Marathon Petroleum acquired the refinery when it bought Andeavor<br />
<br />
=== Links ===<br />
# [https://www.marathonpetroleum.com/Operations/Refining/El-Paso-Refinery/ Refinery Webpage]<br />
# [http://killajoules.wikidot.com/blog:489 Western Refining Announces Temporary Suspension of Refining Operations at Its El Paso Refinery Due to Extreme Weather Conditions] <br />
# [http://killajoules.wikidot.com/blog:514 Western Refining Begins Startup of Its El Paso Refinery] <br />
# [http://killajoules.wikidot.com/blog:4110 Western Refining Announces Start-Up of Delaware Basin Logistics Project]<br />
# [http://killajoules.wikidot.com/blog:5113 Western Refining Announces New Delaware Basin Pipeline Project]<br />
# [https://abarrelfull.blogspot.com/2024/03/marathon-petroleum-corp-and-andeavor.html Marathon Petroleum Corp. and Andeavor Combination to Create Leading U.S. Refining, Marketing, and Midstream Company]<br />
<br />
[[Category:Refinery]]<br />
[[Category:USA]]<br />
[[Category:Marathon]]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Gallup_Refinery&diff=73507Gallup Refinery2024-03-25T13:35:32Z<p>Abarrelfull: </p>
<hr />
<div>=== Summary Information ===<br />
* Ownership: Marathon Petroleum<br />
* Website: https://www.marathonpetroleum.com/<br />
* List of [[Marathon Petroleum Refineries]]<br />
* Location: Gallup, New Mexico<br />
* Capacity: 1.3 million tons/annum & 26,000 bbl/day<br />
* Nelson Complexity: 9.9<br />
* Refining Depth: 90%<br />
=== Brief Description ===<br />
* A small refinery with some cracking capability, it is one half of a refining complex including the Bloomfield Refinery<br />
=== Refining Units ===<br />
* Atmospheric Distillation, 21,000<br />
* Fluidised Catalytic Cracker, 11,500<br />
* Catalytic Reformer, 6,800<br />
* Naphtha Desulphurisation, 6,800<br />
* Diesel Desulphurisation, 3,000<br />
=== Terminal Capacity ===<br />
* Crude Oil:<br />
* Refined Products:<br />
Crude Supply<br />
* Crude oil supply for Western Refining's two New Mexico refineries comes primarily from the Four Corners area and is either collected by a pipeline network or delivered by our truck transports to pipeline injection points and/or refinery tankage<br />
* Most of the crude processed is sweet<br />
* The Gallup refinery is capable of processing approximately 6,000 bpd of natural gas liquids, supplied through a 13-mile pipeline that connects the refinery to a natural gas liquids processing plant<br />
=== Products Produced ===<br />
* LPG, Gasoline, Diesel, Fuel Oil<br />
=== Projects ===<br />
* The company is considering increasing rail supply capability<br />
* A 40 Mile crude pipeline has been constructed to supply Shale Oil to the refinery<br />
=== Other Information ===<br />
-<br />
<br />
=== History ===<br />
* 2012 - The New Mexico Environment Department has reached a settlement with Western Refining over emissions violations<br />
* 2017 - Western refining acquired by Tesoro (Becomes Andeavor)<br />
* 2018 - Marathon Petroleum acquired the refinery when it bought Andeavor<br />
<br />
=== Links ===<br />
# [https://www.marathonpetroleum.com/Operations/Refining/Gallup-Refinery/ Refinery Webpage]<br />
# [http://phx.corporate-ir.net/External.File?item=UGFyZW50SUQ9OTQzNzd8Q2hpbGRJRD0tMXxUeXBlPTM=&t=1 Western Refining Investor Presentation, May 2011]<br />
# [http://phx.corporate-ir.net/External.File?item=UGFyZW50SUQ9Mzc3MDY1fENoaWxkSUQ9Mzc1ODI4fFR5cGU9MQ==&t=1 2009 Annual Report]<br />
# [http://killajoules.wikidot.com/blog:2823 NMED Settles Emissions Violations Case with Western Refining]<br />
# [http://killajoules.wikidot.com/blog:4110 Western Refining Announces Start-Up of Delaware Basin Logistics Project] <br />
# [http://killajoules.wikidot.com/blog:5113 Western Refining Announces New Delaware Basin Pipeline Project]<br />
# [http://killajoules.wikidot.com/archive:western-refining-stockholders-approve-tesoro-acquisi Western Refining Stockholders Approve Tesoro Acquisition]<br />
# [https://abarrelfull.blogspot.com/2024/03/marathon-petroleum-corp-and-andeavor.html Marathon Petroleum Corp. and Andeavor Combination to Create Leading U.S. Refining, Marketing, and Midstream Company]<br />
<br />
[[Category:Refinery]]<br />
[[Category:USA]]<br />
[[Category:Marathon]]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=BakkenLink_Crude_Oil_Pipeline&diff=73506BakkenLink Crude Oil Pipeline2024-03-25T13:35:17Z<p>Abarrelfull: </p>
<hr />
<div>Summary Information<br />
<br />
* Source: Bakken, North Dakota<br />
* Destination: Baker, Montana<br />
* Ownership: BakkenLink Pipeline LLC<br />
* Website: http://www.bakkenlink.com/<br />
* Length: kilometres (132 miles) <br />
* Capacity: 65,000 barrels of oil per day <br />
* Crude Type:<br />
<br />
+++ Brief Description<br />
<br />
* A 132-mile long, 12-inch diameter welded steel crude oil pipeline. The proposed pipeline is designed to carry up to 65,000 barrels of oil per day, with expansion capabilities of up to 100,000 barrels per day. The pipeline would be buried underground and would follow existing pipeline and utility easements and corridors where feasible.<br />
<br />
+++ Pipeline Status<br />
* Planning<br />
<br />
+++ History<br />
* 2010 - BakkenLink Pipeline launched a binding Open Season<br />
* 2012 - The Bureau of Land Management launched public consultation<br />
* 2018 - Marathon Petroleum acquired the pipeline when it bought Andeavor<br />
<br />
+++ Other Information<br />
<br />
* -<br />
<br />
+++ Links<br />
<br />
# [http://www.bakkenlink.com/ BakkenLink Pipeline LLC] <br />
# [http://killajoules.wikidot.com/blog:2990 BLM Seeks Comment on Pipeline EA]<br />
# [https://abarrelfull.blogspot.com/2024/03/marathon-petroleum-corp-and-andeavor.html Marathon Petroleum Corp. and Andeavor Combination to Create Leading U.S. Refining, Marketing, and Midstream Company]<br />
<br />
[[Category:Pipeline]]<br />
[[Category:USA]]<br />
[[Category:Marathon]]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=BakkenLink_Crude_Oil_Pipeline&diff=73505BakkenLink Crude Oil Pipeline2024-03-25T13:34:52Z<p>Abarrelfull: </p>
<hr />
<div>Summary Information<br />
<br />
* Source: Bakken, North Dakota<br />
* Destination: Baker, Montana<br />
* Ownership: BakkenLink Pipeline LLC<br />
* Website: http://www.bakkenlink.com/<br />
* Length: kilometres (132 miles) <br />
* Capacity: 65,000 barrels of oil per day <br />
* Crude Type:<br />
<br />
+++ Brief Description<br />
<br />
* A 132-mile long, 12-inch diameter welded steel crude oil pipeline. The proposed pipeline is designed to carry up to 65,000 barrels of oil per day, with expansion capabilities of up to 100,000 barrels per day. The pipeline would be buried underground and would follow existing pipeline and utility easements and corridors where feasible.<br />
<br />
+++ Pipeline Status<br />
* Planning<br />
<br />
+++ History<br />
* 2010 - BakkenLink Pipeline launched a binding Open Season<br />
* 2012 - The Bureau of Land Management launched public consultation<br />
* 2018 - Marathon Petroleum acquired the pipeline when it bought Andeavor<br />
<br />
+++ Other Information<br />
<br />
* -<br />
<br />
+++ Links<br />
<br />
# [http://www.bakkenlink.com/ BakkenLink Pipeline LLC] <br />
# [http://killajoules.wikidot.com/blog:2990 BLM Seeks Comment on Pipeline EA]<br />
# [https://abarrelfull.blogspot.com/2024/03/marathon-petroleum-corp-and-andeavor.html Marathon Petroleum Corp. and Andeavor Combination to Create Leading U.S. Refining, Marketing, and Midstream Company]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=BakkenLink_Crude_Oil_Pipeline&diff=73504BakkenLink Crude Oil Pipeline2024-03-25T13:19:30Z<p>Abarrelfull: Created page with "Summary Information * Source: Bakken, North Dakota * Destination: Baker, Montana * Ownership: BakkenLink Pipeline LLC * Website: http://www.bakkenlink.com/ * Length: kilomet..."</p>
<hr />
<div>Summary Information<br />
<br />
* Source: Bakken, North Dakota<br />
* Destination: Baker, Montana<br />
* Ownership: BakkenLink Pipeline LLC<br />
* Website: http://www.bakkenlink.com/<br />
* Length: kilometres (132 miles) <br />
* Capacity: 65,000 barrels of oil per day <br />
* Crude Type:<br />
<br />
+++ Brief Description<br />
<br />
* A 132-mile long, 12-inch diameter welded steel crude oil pipeline. The proposed pipeline is designed to carry up to 65,000 barrels of oil per day, with expansion capabilities of up to 100,000 barrels per day. The pipeline would be buried underground and would follow existing pipeline and utility easements and corridors where feasible.<br />
<br />
+++ Pipeline Status<br />
* Planning<br />
<br />
+++ History<br />
* 2010 - BakkenLink Pipeline launched a binding Open Season<br />
* 2012 - The Bureau of Land Management launched public consultation<br />
<br />
+++ Other Information<br />
<br />
* -<br />
<br />
+++ Links<br />
<br />
# [http://www.bakkenlink.com/ BakkenLink Pipeline LLC] <br />
# [http://killajoules.wikidot.com/blog:2990 BLM Seeks Comment on Pipeline EA]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Bakken_Crude_Express_Pipeline_Project&diff=73503Bakken Crude Express Pipeline Project2024-03-25T13:18:54Z<p>Abarrelfull: </p>
<hr />
<div>Summary Information<br />
<br />
* **Cancelled**<br />
<br />
* Source: North Dakota<br />
* Destination: Cushing, Oklahoma<br />
* Ownership: ONEOK Partners<br />
* Website: http://www.oneokpartners.com/<br />
* Length: kilometres (1,300 miles) <br />
* Capacity: barrels of oil per day <br />
* Crude Type: [[Bakken Crude Oil]]<br />
<br />
+++ Brief Description<br />
<br />
* A 1,300-mile crude-oil pipeline with the capacity to transport 200,000 barrels per day (bpd). The Bakken Crude Express Pipeline will transport light-sweet crude oil from the [[Bakken Oil Field | Bakken Shale]] in the Williston Basin in North Dakota to the Cushing, Okla., crude-oil market hub.<br />
<br />
+++ Pipeline Status<br />
* Pipeline was to be completed in 2015, but has been cancelled<br />
<br />
+++ History<br />
* 2012 - Project announced<br />
* 2012 - ONEOK Partners Announces Open Season<br />
* 2012 - ONEOK Partners Announces cancellation of the project<br />
<br />
+++ Other Information<br />
<br />
* The proposed pipeline route will be well-positioned to transport crude-oil production from the [[[Niobrara Shale Oil Field | Niobrara Shale]]]<br />
<br />
+++ Links<br />
<br />
# [http://killajoules.wikidot.com/blog:2346 ONEOK Partners to Invest $1.5 Billion to $1.8 Billion to Build Crude-Oil Pipeline from Bakken Shale to Cushing, Okla.]<br />
# [http://killajoules.wikidot.com/blog:3148 ONEOK Partners Announces Open Season for Bakken Crude Express Pipeline]<br />
# [http://killajoules.wikidot.com/blog:3475 ONEOK Partners Elects Not to Proceed With Bakken Crude Express Pipeline Project]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Bakken_Crude_Express_Pipeline_Project&diff=73502Bakken Crude Express Pipeline Project2024-03-25T13:18:46Z<p>Abarrelfull: </p>
<hr />
<div>Summary Information<br />
<br />
* **Cancelled**<br />
<br />
* Source: North Dakota<br />
* Destination: Cushing, Oklahoma<br />
* Ownership: ONEOK Partners<br />
* Website: http://www.oneokpartners.com/<br />
* Length: kilometres (1,300 miles) <br />
* Capacity: barrels of oil per day <br />
* Crude Type: [[[Bakken Crude Oil]]]<br />
<br />
+++ Brief Description<br />
<br />
* A 1,300-mile crude-oil pipeline with the capacity to transport 200,000 barrels per day (bpd). The Bakken Crude Express Pipeline will transport light-sweet crude oil from the [[Bakken Oil Field | Bakken Shale]] in the Williston Basin in North Dakota to the Cushing, Okla., crude-oil market hub.<br />
<br />
+++ Pipeline Status<br />
* Pipeline was to be completed in 2015, but has been cancelled<br />
<br />
+++ History<br />
* 2012 - Project announced<br />
* 2012 - ONEOK Partners Announces Open Season<br />
* 2012 - ONEOK Partners Announces cancellation of the project<br />
<br />
+++ Other Information<br />
<br />
* The proposed pipeline route will be well-positioned to transport crude-oil production from the [[[Niobrara Shale Oil Field | Niobrara Shale]]]<br />
<br />
+++ Links<br />
<br />
# [http://killajoules.wikidot.com/blog:2346 ONEOK Partners to Invest $1.5 Billion to $1.8 Billion to Build Crude-Oil Pipeline from Bakken Shale to Cushing, Okla.]<br />
# [http://killajoules.wikidot.com/blog:3148 ONEOK Partners Announces Open Season for Bakken Crude Express Pipeline]<br />
# [http://killajoules.wikidot.com/blog:3475 ONEOK Partners Elects Not to Proceed With Bakken Crude Express Pipeline Project]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Bakken_Crude_Express_Pipeline_Project&diff=73501Bakken Crude Express Pipeline Project2024-03-25T13:18:38Z<p>Abarrelfull: Created page with "Summary Information * **Cancelled** * Source: North Dakota * Destination: Cushing, Oklahoma * Ownership: ONEOK Partners * Website: http://www.oneokpartners.com/ * Length: k..."</p>
<hr />
<div>Summary Information<br />
<br />
* **Cancelled**<br />
<br />
* Source: North Dakota<br />
* Destination: Cushing, Oklahoma<br />
* Ownership: ONEOK Partners<br />
* Website: http://www.oneokpartners.com/<br />
* Length: kilometres (1,300 miles) <br />
* Capacity: barrels of oil per day <br />
* Crude Type: [[[Bakken Crude Oil]]]<br />
<br />
+++ Brief Description<br />
<br />
* A 1,300-mile crude-oil pipeline with the capacity to transport 200,000 barrels per day (bpd). The Bakken Crude Express Pipeline will transport light-sweet crude oil from the [[[Bakken Oil Field | Bakken Shale]]] in the Williston Basin in North Dakota to the Cushing, Okla., crude-oil market hub.<br />
<br />
+++ Pipeline Status<br />
* Pipeline was to be completed in 2015, but has been cancelled<br />
<br />
+++ History<br />
* 2012 - Project announced<br />
* 2012 - ONEOK Partners Announces Open Season<br />
* 2012 - ONEOK Partners Announces cancellation of the project<br />
<br />
+++ Other Information<br />
<br />
* The proposed pipeline route will be well-positioned to transport crude-oil production from the [[[Niobrara Shale Oil Field | Niobrara Shale]]]<br />
<br />
+++ Links<br />
<br />
# [http://killajoules.wikidot.com/blog:2346 ONEOK Partners to Invest $1.5 Billion to $1.8 Billion to Build Crude-Oil Pipeline from Bakken Shale to Cushing, Okla.]<br />
# [http://killajoules.wikidot.com/blog:3148 ONEOK Partners Announces Open Season for Bakken Crude Express Pipeline]<br />
# [http://killajoules.wikidot.com/blog:3475 ONEOK Partners Elects Not to Proceed With Bakken Crude Express Pipeline Project]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Wyoming_Interstate_Gas_Pipeline&diff=73500Wyoming Interstate Gas Pipeline2024-03-25T13:14:24Z<p>Abarrelfull: </p>
<hr />
<div>Summary Information<br />
<br />
* Source: western Wyoming<br />
* Destination: northeast Colorado<br />
* Ownership: Kinder Morgan<br />
* Website: http://www.kindermorgan.com/ <br />
* Length: kilometres (800 miles) <br />
* Capacity: per day <br />
* Status: Operating<br />
<br />
+++ Details<br />
* Wyoming Interstate Company (WIC) is wholly owned by Kinder Morgan. <br />
* With approximately 800 miles of pipeline, WIC is comprised of a mainline system that extends from western Wyoming to northeast Colorado (the Cheyenne Hub) and several lateral pipeline systems that extend from various interconnections along the WIC mainline into western Colorado and northeast Wyoming and into eastern Utah.<br />
* WIC is one of the primary interstate natural gas transportation systems providing takeaway capacity from the Overthrust, Piceance, Uinta, Powder River and Green River basins. <br />
* CIG is the operator of the WIC system pursuant to a service agreement with WIC.<br />
* It has connections with the [[Cheyenne Natural Gas Hub]] and [[White River Natural Gas Hub]]<br />
<br />
+++ History<br />
* 1997 - Eastward Expansion completed<br />
* 1998 - Laramie Compressor Expansion completed<br />
* 1999 - Medicine Bow Lateral completed<br />
* 1999 - Sonat merged with El Paso<br />
* 2000 - Medicine Bow 00 Expansion completed<br />
* 2001 - Medicine Bow Loop Expansion completed<br />
* 2004 - Echo Springs Lateral completed<br />
* 2006 - Piceance Line completed<br />
* 2007 - Kanda Lateral Phase 1 & 2 completed<br />
* 2008 - Mainline Expansion, Piceance Expansion Phase 1 & Medicine Bow 08 Expansion completed<br />
* 2009 - Douglas Expansion Project & Piceance Expansion Phase 2 completed<br />
* 2010 - System Enhancement Project & Diamond Mountain Compressor Station Project completed<br />
<br />
* <br />
<br />
+++ Other Information<br />
* -<br />
<br />
+++ Links<br />
# [http://www.kindermorgan.com/pages/business/gas_pipelines/west/WIC/default.aspx Wyoming Interstate]<br />
# [[EIA Natural Gas Pipeline Projects]]<br />
# [http://killajoules.wikidot.com/archive:el-paso-energy-corporation-and-sonat-inc-announce-me El Paso Energy Corporation and Sonat Inc. Announce Merger Agreement]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Wyoming_Interstate_Gas_Pipeline&diff=73499Wyoming Interstate Gas Pipeline2024-03-25T13:13:58Z<p>Abarrelfull: </p>
<hr />
<div>Summary Information<br />
<br />
* Source: western Wyoming<br />
* Destination: northeast Colorado<br />
* Ownership: Kinder Morgan<br />
* Website: http://www.kindermorgan.com/ <br />
* Length: kilometres (800 miles) <br />
* Capacity: per day <br />
* Status: Operating<br />
<br />
+++ Details<br />
* Wyoming Interstate Company (WIC) is wholly owned by Kinder Morgan. <br />
* With approximately 800 miles of pipeline, WIC is comprised of a mainline system that extends from western Wyoming to northeast Colorado (the Cheyenne Hub) and several lateral pipeline systems that extend from various interconnections along the WIC mainline into western Colorado and northeast Wyoming and into eastern Utah.<br />
* WIC is one of the primary interstate natural gas transportation systems providing takeaway capacity from the Overthrust, Piceance, Uinta, Powder River and Green River basins. <br />
* CIG is the operator of the WIC system pursuant to a service agreement with WIC.<br />
* It has connections with the [[Cheyenne Natural Gas Hub]]<br />
<br />
+++ History<br />
* 1997 - Eastward Expansion completed<br />
* 1998 - Laramie Compressor Expansion completed<br />
* 1999 - Medicine Bow Lateral completed<br />
* 1999 - Sonat merged with El Paso<br />
* 2000 - Medicine Bow 00 Expansion completed<br />
* 2001 - Medicine Bow Loop Expansion completed<br />
* 2004 - Echo Springs Lateral completed<br />
* 2006 - Piceance Line completed<br />
* 2007 - Kanda Lateral Phase 1 & 2 completed<br />
* 2008 - Mainline Expansion, Piceance Expansion Phase 1 & Medicine Bow 08 Expansion completed<br />
* 2009 - Douglas Expansion Project & Piceance Expansion Phase 2 completed<br />
* 2010 - System Enhancement Project & Diamond Mountain Compressor Station Project completed<br />
<br />
* <br />
<br />
+++ Other Information<br />
* -<br />
<br />
+++ Links<br />
# [http://www.kindermorgan.com/pages/business/gas_pipelines/west/WIC/default.aspx Wyoming Interstate]<br />
# [[EIA Natural Gas Pipeline Projects]]<br />
# [http://killajoules.wikidot.com/archive:el-paso-energy-corporation-and-sonat-inc-announce-me El Paso Energy Corporation and Sonat Inc. Announce Merger Agreement]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Wyoming_Interstate_Gas_Pipeline&diff=73498Wyoming Interstate Gas Pipeline2024-03-25T13:13:03Z<p>Abarrelfull: Created page with "Summary Information * Source: western Wyoming * Destination: northeast Colorado * Ownership: Kinder Morgan * Website: http://www.kindermorgan.com/ * Length: kilometres (800..."</p>
<hr />
<div>Summary Information<br />
<br />
* Source: western Wyoming<br />
* Destination: northeast Colorado<br />
* Ownership: Kinder Morgan<br />
* Website: http://www.kindermorgan.com/ <br />
* Length: kilometres (800 miles) <br />
* Capacity: per day <br />
* Status: Operating<br />
<br />
+++ Details<br />
* Wyoming Interstate Company (WIC) is wholly owned by Kinder Morgan. <br />
* With approximately 800 miles of pipeline, WIC is comprised of a mainline system that extends from western Wyoming to northeast Colorado (the Cheyenne Hub) and several lateral pipeline systems that extend from various interconnections along the WIC mainline into western Colorado and northeast Wyoming and into eastern Utah.<br />
* WIC is one of the primary interstate natural gas transportation systems providing takeaway capacity from the Overthrust, Piceance, Uinta, Powder River and Green River basins. <br />
* CIG is the operator of the WIC system pursuant to a service agreement with WIC.<br />
* It has connections with the [[[Cheyenne Natural Gas Hub]]]<br />
<br />
+++ History<br />
* 1997 - Eastward Expansion completed<br />
* 1998 - Laramie Compressor Expansion completed<br />
* 1999 - Medicine Bow Lateral completed<br />
* 1999 - Sonat merged with El Paso<br />
* 2000 - Medicine Bow 00 Expansion completed<br />
* 2001 - Medicine Bow Loop Expansion completed<br />
* 2004 - Echo Springs Lateral completed<br />
* 2006 - Piceance Line completed<br />
* 2007 - Kanda Lateral Phase 1 & 2 completed<br />
* 2008 - Mainline Expansion, Piceance Expansion Phase 1 & Medicine Bow 08 Expansion completed<br />
* 2009 - Douglas Expansion Project & Piceance Expansion Phase 2 completed<br />
* 2010 - System Enhancement Project & Diamond Mountain Compressor Station Project completed<br />
<br />
* <br />
<br />
+++ Other Information<br />
* -<br />
<br />
+++ Links<br />
# [http://www.kindermorgan.com/pages/business/gas_pipelines/west/WIC/default.aspx Wyoming Interstate]<br />
# [[EIA Natural Gas Pipeline Projects]]<br />
# [http://killajoules.wikidot.com/archive:el-paso-energy-corporation-and-sonat-inc-announce-me El Paso Energy Corporation and Sonat Inc. Announce Merger Agreement]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Seaway_Heavy_Lifting_Oil_And_Gas_References&diff=73497Seaway Heavy Lifting Oil And Gas References2024-03-25T13:11:23Z<p>Abarrelfull: </p>
<hr />
<div># '''[[Seaway Heavy Lifting Europe Oil And Gas References]]'''<br />
# '''[[Seaway Heavy Lifting Middle East Oil And Gas References]]'''<br />
<br />
=== References ===<br />
<br />
# [[Mumbai High Oil Field]]<br />
#* India<br />
#* ONGC<br />
#* Larsen & Toubro <br />
#* MHN platform and living quarters platform topsides<br />
#* 2012 Q1<br />
# [[East Belumut Oil Field]]<br />
#* Malaysia<br />
#* Newfield Malaysia<br />
#* TL Offshore<br />
#* Installation of East Belumut-A Deck and LQ module <br />
#* 2008 Q1<br />
# [[Sumandak Oil and Gas Field]]<br />
#* Malaysia<br />
#* TL Offshore<br />
#* Petronas Carigali<br />
#* Inst. Sumandak SUPG-B MSF, modules and flare boom<br />
#* 2008 Q1<br />
# Lukoil-Kaliningrad-morneft T & I Varenday FOIROT (Fixed Offshore Ice Resistant Offloading Terminal) Varandey, Russia 2007 Q3<br />
# LUKOIL-KaliningradMorneft Inst. Kravtsovskoye D6 P1 Living Quarter Module/MSF and P2 Platform Baltic Sea, Russia 2003 Q3<br />
# Lukoil-Kaliningrad-morneft Inst. Skirtpiles for Kravtsovskoye D6 Living Quarters Platform Baltic Sea, Russia 2000 Q4<br />
# [[Cantarell Oil Field]]<br />
#* Mexico<br />
#* Constructora y Arrendadora S.A.<br />
#* Pemex<br />
#* Inst. - 4 platforms for Cantarell AKAL-GC Project<br />
#* 2000 Q1<br />
# Chernomorneftegaz Inshore 4 jack-up drilling units Black Sea 1993 Q4<br />
# Santa Fe Salv. Jack-up drill rig 'Al Baz.' Nigeria 1992 Q2<br />
# [[Tuna Gas Field]]<br />
#* Egypt<br />
#* Micoperi Marine Contractors Srl. Inst. <br />
#* Petrobel<br />
#* Tuna Jacket and Foundation Piles<br />
#* 2010 Q2<br />
# [[Temsah Gas Field]]<br />
#* Egypt<br />
#* Petrobel<br />
#* T & I Barboni-1 & Temsah-4 Topsides<br />
#* 2004 Q4<br />
# [[Miskar Gas Field]]<br />
#* Tunisia<br />
#* British Gas <br />
#* Bechtel International Corporation Inst.<br />
#* Miskar A’ Gas Compression Module and Ancillaries<br />
#* 2004 Q1<br />
# [[Temsah Gas Field]]<br />
#* Egypt<br />
#* Petrobel<br />
#* T & I - Barboni-1, Baltim-N & Temsah-4 Piles and Jackets<br />
#* 2004 Q1<br />
# [[Temsah Gas Field]]<br />
#* Egypt<br />
#* IEOC Egypt Branch<br />
#* Const. Temsah-1 Deck Removal<br />
#* 2004 Q1<br />
# Petreco Inst. Galata A’ Platform Black Sea, Bulgaria 2003 Q3<br />
# FCC T & I Harbour Extension, including Procurement and Construction of Piles Monaco Harbour 2001 Q3<br />
# [[Rosetta Gas Field]]<br />
#* Egypt<br />
#* Zafco<br />
#* Petrojet <br />
#* Installation of Rosetta Field Platform Jacket<br />
#* 1999 Q4<br />
# [[Abu Qir Gas Fields]]<br />
#* Egypt<br />
#* WEPCO/Petrojet<br />
#* Saipem S.p.A.<br />
#* T & I - decks and modules for ABU QIR P1-C and P2-C gas compression platforms<br />
#* 1998 Q2<br />
# [[Heera Oil Field]]<br />
#* India<br />
#* ONGC<br />
#* Punj Lloyd Ltd. <br />
#* Installation of 4 Wellhead Platforms for Heera Re-development Project<br />
#* 2008 Q1/2<br />
# [[Mumbai High Oil Field]]<br />
#* India<br />
#* ONGC<br />
#* Larsen & Toubro Ltd Inst. <br />
#* NQG Process Gas Compressor Modules for ONGC NQ Complex Reconstruction Project<br />
#* 2009 Q1<br />
# [[Heera Oil Field]]<br />
#* India<br />
#* ONGC<br />
#* Punj Lloyd Limited<br />
#* Installation of HI, HSC, HJ and B-134A Wellhead Platforms for Heera Redevelopment Project<br />
#* 2009 Q1<br />
# [[Heera Oil Field]]<br />
#* India<br />
#* ONGC<br />
#* Punj Lloyd Limited<br />
#* Installation of HI, HSC, HJ and B-134A wellhead platforms for ONGC Heera Redevelopment Project<br />
#* 2008 Q2 & Q4<br />
# [[Bassein Oil and Gas Field]]<br />
#* ONGC<br />
#* Larsen & Toubro Ltd. Inst. <br />
#* BCP-B2 Booster Compression Platform Arabian Sea<br />
#* 2007 Q4<br />
# [[Tapti Gas Fields]]<br />
#* India<br />
#* BG Exploration & Production<br />
#* TCPP and MTA Platforms (NRPOD project)<br />
#* 2007 Q2<br />
# [[Panna Oil and Gas Field]]<br />
#* India <br />
#* British Gas<br />
#* Installation of Panna PCE SLM (single lift module) onto PPA Platform<br />
#* 2006 Q2<br />
# Brown & Root McDermott Fabricators Ltd. Trans. Turret for FPSO from Ardersier to El Ferrol - 1995 Q2<br />
# [[Panna Oil and Gas Field]]<br />
#* India <br />
#* British Gas<br />
#* Clough Oil and Gas<br />
#* Installation of Panna PH, PJ and Tapti STD Platforms <br />
#* 2006 Q1<br />
# [[Hazira Gas Field]]<br />
#* India<br />
#* Niko<br />
#* Clough Offshore<br />
#* Installation of Hazira Platform<br />
#* 2004 Q2<br />
# [[Gauri Oil and Gas Field]]<br />
#* India<br />
#* Cairn Energy<br />
#* Installation of Gauri-A Jacket<br />
#* 2003 Q2<br />
<br />
<br />
<br />
+++ Links<br />
<br />
* [http://www.seawayheavylifting.com.cy/projects Seaway Heavy Lifting Projects]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Hyundai_Heavy_Industries_Platform_References&diff=73496Hyundai Heavy Industries Platform References2024-03-25T13:10:18Z<p>Abarrelfull: </p>
<hr />
<div># Replacement Of North Breasting Kung In Energy Co., Ltd., <br />
#* Korea <br />
#* Jacket : 1 Ea, Pile : 9 Ea X Od18”~ 36” Pc <br />
#* Jul. 1976 - Oct. 1976<br />
#* Dolphin Total : 450 M/T<br />
# Yanbu Ngl Tanker Terminal <br />
#* Saudi Arabia<br />
#* Arabian American Oil Co., Ltd., <br />
#* Jacket : 15 Ea, Module : 2 Ea Pci Pile : 193 Ea X Od36” Total : 24,000 M/T<br />
#* Jan. 1979 - Mar. 1982<br />
# Yeosu Lng Tanker Terminal Honam Oil Refinery Co., Ltd., <br />
#* Korea <br />
#* Jacket : 12 Ea, Pile : 55 Ea X Od36” Pcti Nov. Loading Arm : 5 Ea, Total : 4,760 M/T<br />
#* 1979 - Dec. 1980<br />
# [[North Rankin and Perseus Gas Fields | North Rankin “A” Platform]] <br />
#* Australia<br />
#* Woodside Offshore Petroleum Pty., Ltd., <br />
#* Pile (24 Ea X Od53” X 154m) : 8,565 M/T PC Tubular<br />
#* May 1980 - May 1982, <br />
# [[Bekok Oil and Gas Field | Bekok “C”]]/[[Tapis Oil Field | Tapis]] “D”<br />
#* Malaysia<br />
#* Esso<br />
#* Platform, Jacket : 2 Ea Pile/Conductor : 321 Ea X Od24”~ 48”, Total : 10,780 M/T, PC<br />
#* Jun. 1980 - Jun. 1981<br />
# [[Champion Oil Field]]<br />
#* Brunei<br />
#* Shell<br />
#* Development Of The Champion-7, Jacket : 6 Ea, Module : 8 Ea, Bridge : 9 Ea, Field Complex Pile : 90 Ea X Od24”~ 42”, Total : 14,227 M/T<br />
#* Oct. 1980 - Mar. 1982<br />
# [[F23 Gas and Condensate Field]]<br />
#* Malaysia<br />
#* Shell<br />
#* Jacket : 3 Ea, Pile : 45 Ea X Od42”~ 54”, Total : 11,206 M/T, PCT<br />
#* Apr. 1981 - Oct. 1982<br />
# [[Tiong Oil and Gas Field]]<br />
#* Malaysia<br />
#* Exxon<br />
#* Pumping Platform, Jacket : 3 Ea, Pile : 390 Ea X Od24”~ 48”, Tinggi “A” Jacket Structure Total : 14,320 M/T, PC<br />
#* May 1981 - May 1982<br />
# [[F23 Gas and Condensate Field]]<br />
#* Malaysia<br />
#* Shell<br />
#* Module (3 Ea) : 3,279 M/T, PC<br />
#* Oct. 1981 - Oct. 1982<br />
# [[Tiong Oil and Gas Field]] / Kepong “A”<br />
#* Malaysia<br />
#* Exxon<br />
#* Jacket : 2 Ea, Pile : 182 Ea X Od24”~ 60” PC, Facilities Total : 6,000 M/T<br />
#* Nov. 1981 - Sep. 1982<br />
# [[Zuluf Oil Field]]<br />
#* Saudi Arabia<br />
#* Saudi Aramco<br />
#* Jacket : 10 Ea, Pile : 58 Ea X Od30”~ 42” Topside Module : 22 Ea, Bridge : 8 Ea, Total : 28,416 M/T, Epic<br />
#* Dec. 1981 - Jul. 1985<br />
# [[Iwaki Gas Field]]<br />
#* Japan<br />
#* Exxon<br />
#* Conductor Pile (15 Ea X Od24”) : 1,200 M/T PC<br />
#* Feb. 1982 - Apr. 1983<br />
# [[Irong Barat Oil Field]]<br />
#* Malaysia<br />
#* Esso<br />
#* Irong Barat “A” Jacket<br />
#* Apr. 1982 - May 1983<br />
# [[Semangkok Oil Field]]<br />
#* Malaysia<br />
#* Esso<br />
#* Semankok “A” & “B” Jacket<br />
#* Apr. 1982 - May 1983<br />
# Malaysia, Esso Pulai “B” Jacket Structures Pile/Conductor : 306 Ea X Od54”~ 60” Total : 17,740 M/T<br />
# [[Mumbai High Oil Field]]<br />
#* India<br />
#* ONGC<br />
#* Water Injection Well Platforms - (Wi-2, 3, 4, 5) Total : 10,432 M/T<br />
#* Platform : 4 Ea, Pile : 16 Ea<br />
#* Epic<br />
#* May. 1982 - Apr. 1983<br />
# [[Mumbai High Oil Field]]<br />
#* India<br />
#* ONGC<br />
#* Win Process Platform Facilities<br />
#* Jacket, Topside : 5ea, Pile : 4 Ea X 48” - Total : 10,000 M/T<br />
#* Epic<br />
#* Jun. 1982 - Mar. 1984<br />
# 16 Peninsular Malaysia Offshore Petronas Caligali Sdn., Bhd., Malaysia Jacket (4 Ea) & Pile (16 Ea) : 5,588 M/T Pc Sep. 1982 - May 1983 Gas Project<br />
# [[Marjan Oil Field]]<br />
#* Saudi Arabia<br />
#* Saudi Aramco<br />
#* Platform, Facilities Pile : 72 Ea X Od30”~ 48”, Bridge : 6 Ea, Total : 40,481 M/T<br />
#* Oct. 1982 - Nov. 1985<br />
# 18 Ssb Eng 83/84 Marine Platform Sarawak Shell Berhad, Malaysia Platform : 3 Ea, Pile : 12 Ea X Od30”~ 42” Pc Jan. 1983 - Dec. 1984 Total : 2,936 M/T<br />
# Satun and [[Platong Gas Field]]<br />
#* Thailand<br />
#* Union Oil Company<br />
#* Topside : 2 Ea, L/Q Deck : 2 Ea L/Q Building : 2 Ea, Bridge : 1 Ea Total : 8,930 M/T, EPC<br />
#* Jul. 1983 - Jan. 1985<br />
# [[Harvest Gas Field]]<br />
#* U.S.A<br />
#* Texaco<br />
#* Harvest “A” Platform Topside<br />
#* Mod (8 Ea) : 7,282 M/T Pct <br />
#* Sep. 1983 - Jun. 1985<br />
# Ssb Eng 208/82 Mini Production Sarawak Shell Berhad, Malaysia Topside (2 Ea) : 1,500 M/T Pc Oct. 1983 - Dec. 1984 Platforms<br />
# [[Baram Delta Oil and Gas Fields]]<br />
#* Malaysia<br />
#* Sarawak Shell Berhad<br />
#* Ssb Eng 79/83 Marine Platform<br />
#* Siwa Jacket - Platform : 2 Ea, Pile : 7ea X Od30”~ 42” Pc <br />
#* Total : 1,359 M/T<br />
#* Oct. 1983 - Jun. 1984<br />
# [[Mumbai High Oil Field]]<br />
#* India<br />
#* ONGC<br />
#* Phase-3 Of “Sh” Complex<br />
#* Platform : 2 Ea, Pile :12 Ea X Od60” <br />
#* Bridge, Pipeline : 62.8 Km<br />
#* Epic <br />
#* Total : 17,157 M/T<br />
#* Dec. 1983 - May 1985<br />
# [[Mumbai High Oil Field]]<br />
#* India<br />
#* ONGC<br />
#* Phase-2 Of “Nq” Complex<br />
#* Jacket : 2 Ea, Pile : 12ea X Od54” <br />
#* Topside : 3 Ea, Bridge : 3 Ea<br />
#* Pipeline : 68.3 Km, Total : 12,248 M/T<br />
#* Epic<br />
#* Dec. 1983 - Apr. 1985<br />
# 25 Ssb Marine Platform (Eng 79/82) Sarawak Shell Berhad, Malaysia Platform (2 Ea) : 6,631 M/T Pc Feb. 1984 - Mar. 1985<br />
# [[East Zeit Oil Field]]<br />
#* Egypt<br />
#* Esso<br />
#* East Zeit Platform<br />
#* Platform & Pile : 5,873 M/T Pct <br />
#* Apr. 1984 - Feb. 1985<br />
# [[F6 Gas Field]]<br />
#* Malaysia<br />
#* Sarawak Shell Berhad<br />
#* 55/83 F6-A Module<br />
#* Topside Module : 4 Ea, Bridge : 2 Ea, Total : 7,124 M/T<br />
#* Epic<br />
#* Aug. 1984 - Dec. 1986<br />
# [[F6 Gas Field]]<br />
#* Malaysia<br />
#* Sarawak Shell Berhad<br />
#* (Eng 55/83 F6-A) Jacket & Pile <br />
#* Jacket : 2 Ea, Pile : 8 Ea, Total : 6,756 M/T<br />
#* Epic<br />
#* Aug. 1984 - Jun. 1985<br />
# [[Bassein Oil and Gas Field]]<br />
#* India <br />
#* South Bassein Platform Complex <br />
#* Oil & Natural Gas Corporation Limited, <br />
#* Platform (4 Ea), Pile & Bridge : 20,989 M/T <br />
#* Epic <br />
#* Nov. 1984 - Mar. 1987<br />
# San Miguel “Julius” Platform Cities Service Oil & Gas Co., U.S.A. Jacket : 61m X 87m X 157m, Topside : 9 Ea Pct Dec. 1984 - Nov. 1986 Pile & Conductor : 9,957 M/T Total : 41,123 M/T<br />
# [[Bouri Oil and Gas Field]]<br />
#* Libya<br />
#* ENI<br />
#* Topside Module (9 Ea) : 10,230 M/T EPIC <br />
#* Feb. 1985 - Jun. 1987<br />
# [[Santa Ynez Oil Fields]]<br />
#* U.S.A.<br />
#* Exxon<br />
#* Harmony Platform: 91.55m X 116.29m X 374.5m (H) - PC<br />
#* Heritage Platform: 84.4m X 109.4m X 331.5m (H) - PC<br />
#* Total : 72,100 M/T<br />
#* Jul. 1985 - Apr. 1988<br />
# [[Lombo East Oil Field]]<br />
#* Angola<br />
#* Texaco<br />
#* Lombo East Development - Prospeccao Platform : 2 Ea, Pile : 32 Ea - Epic <br />
#* Other Deck : 3 Ea, Subsea Pipeline : 105 Km<br />
#* Total : 4,770 M/T<br />
#* Dec. 1985 - Mar. 1987<br />
# Infill Well Platform (Ia,Ib,Id & Icd) Oil & Natural Gas Corporation Limited, India Platform : 4 Ea, Pile/Conductor : 37 Ea Epic Nov. 1986 - Dec. 1987 Total : 15,000 M/T<br />
# [[Mumbai High Oil Field]]<br />
#* India<br />
#* ONGC<br />
#* Infill “Icp” Process Platform Complex<br />
#* Platform & Pile, L/Q Module : 5 Ea <br />
#* Bridge : 4 Ea, Misc. (Sbm/Plem/Buoy)<br />
#* Pipeline (13 Lines) : 100.45 Km<br />
#* Total : 20,913 M/T<br />
#* Epic <br />
#* Nov. 1986 - Feb. 1989<br />
# [[Mumbai High Oil Field]]<br />
#* India<br />
#* ONGC<br />
#* Infill “Icw” Process Platform Complex <br />
#* Platform : 1 Ea, Pile : 12 Ea, Bridge : 2 Ea Epic <br />
#* Dec. 1986 - Feb. 1989<br />
#* Submarine P/L : 4.1 Km, Total : 11,700 M/T<br />
# 37 Iraq Crude Oil Trans Saudi Arabia State Company Of Oil Project, Iraq Platform : 40 Ea, Pile : 224 Ea X Od36”~ 48” Epic Sep. 1987 - Sep. 1989 Project (Offshore Marine Terminal) Trestle Deck : 23 Ea, Bridge : 20 Ea Total : 50,754 M/T<br />
# [[Takula Oil and Gas Field]]<br />
#* Angola<br />
#* Cabgoc<br />
#* Takula Water Injection Platform - 5 Ea, Pile : 20 Ea X Od30”~ 36” Pct <br />
#* Nov. 1987 - Jul. 1988<br />
#* Total : 4,869 M/T<br />
# [[Santa Ynez Oil Fields]]<br />
#* Exxon Co., <br />
#* U.S.A.<br />
#* Topside Structures - Topside Module (22 Ea) : 8,936 M/T <br />
#* PC<br />
#* Jan. 1988 - Jan. 1989<br />
#* Fabrication<br />
# [[Heera Oil Field]]<br />
#* India<br />
#* Oil & Natural Gas Corporation Limited<br />
#* Process Platform Complex , Jacket : 3 Ea, Pile : 33 Ea, Module/Deck : 10 Ea, Bridge : 2 Ea, Misc. : 4 Ea, Pipeline (10lines, 6”~ 30”) : 20 Km, Total : 26,805 M/T,EPIC<br />
#* May 1988 - May 1990<br />
# [[Iwafune-Oki Oil and Gas Field]]<br />
#* Japan<br />
#* Japex Offshore<br />
#* Iwafune-Oki Platform - Drilling / Production Module (4 Ea) <br />
#* 5,520 M/T <br />
#* Epct <br />
#* Mar 1989 - May 1990<br />
# [[Goodwyn A Gas and Condensate Field]]<br />
#* Australia<br />
#* Woodside Petroleum<br />
#* Process Platform, Module : 4 Ea, Flare Tower : 1 Ea, Total : 10,784 M/T, PC<br />
#* Apr. 1990 - Jun. 1992<br />
# Bp Riser Jacket British Petroleum, U.K. Jacket (40m X 20m X 143m) : 6,500 M/T Pc May 1991 - May 1992<br />
# [[Safaniya Oil Field]]<br />
#* Saudi Arabia<br />
#* Saudi Arabian Oil Company<br />
#* Living Quarters Platform Accommodation : 140 Men, Living Quarter Module : 1,460 M/T Epct<br />
#* Jun. 1991 - Jun. 1993<br />
# [[Brage Oil and Gas Field]] <br />
#* Norway<br />
#* Norsk Hydro / Ake Verdal<br />
#* Jacket Components: 11,458 M/T<br />
#* Dec. 1991 - May 1992<br />
# Jhn Julius Platform Modification Jhn Oil Operating Co., China Modification Of Platform (9 Ea) : 2,592 M/T Pct Jan. 1992 - Jul. 1992<br />
# Neelam Process Complex Oil & Natural Gas Corporation Limited, India Platform : 5 Ea, Bridge : 3 Ea, Epic Feb. 1992 - Apr. 1994 Pile, Bldg./Others Pipeline (9 Lines, 1.5 ~ 36”) : 132 Km Total : 49,500 M/T<br />
# Nqp Process Complex Oil & Natural Gas Corporation Limited, India Platform : 2 Ea, Pile : 13 Ea X Od48”~ 72” Epic Mar. 1992 - Apr. 1994 Module : 4 Ea, Pipeline : 8 Lines, 4”~ 30” X 102 Km Total : 14,961 M/T<br />
# L-Abcd&E Well Platform Complex Oil & Natural Gas Corporation Limited, India Platform : 5 Ea, Pile : 22 Ea X Od72” Epic Mar. 1992 - May 1993 Pipeline : 6 Lines, 4”~ 6” X 66 Km Total : 18,700 M/T<br />
# [[Yacheng 13 1 Gas Field]]<br />
#* China<br />
#* Arco<br />
#* Wellhead Platform & Pile (Od72”~ 84”) : 6,276 M/T - CTI<br />
#* 1993 - Apr. 1994<br />
# [[Hibernia Oil Field]]<br />
#* Canada<br />
#* The Hibernia Management and Development Company Ltd. (HMDC)<br />
#* Service & L/Q Module : 12,420 M/T PC <br />
#* Mar. 1993 - Mar. 1995<br />
# [[Harding Oil Field]] <br />
#* U.K.<br />
#* BP<br />
#* Jack-Up Pdq Platform, Tpg-500 Triangular Leg (3 Ea) : 123m, EPC, Oil Production : 64,000 Bopd, Total : 23,300 M/T Accommodation : 84 Men<br />
#* Mar. 1993 - Jul. 1995 <br />
# [[Edop Oil Field]]<br />
#* Nigeria<br />
#* Mobil<br />
#* Gas Injection Platform, Jacket, Topside : 2 Ea, Pile : 8 Ea X 47” Bridge, Removal & Modification, Pipeline : 3.6 Km, Total : 6,000 M/TEpic<br />
#* Jun. 1994 - Jun. 1996<br />
# [[Heera Oil Field]]<br />
#* India<br />
#* Oil & Natural Gas Corporation Limited<br />
#* Hx/Hy Wellhead Platform<br />
#* Platform (4 Ea) : 2,900 M/T<br />
#* Epic<br />
#* May 1996 - Dec. 1997<br />
Offshore Pipeline : 6”~ 12” X 39.1 Km<br />
# 55 B-121/119 Wellhead Platform Oil & Natural Gas Corporation Limited, India Platform : 1,000 M/T Epic Jun. 1996 - Jan. 1997<br />
Offshore Pipeline : 12” X 36.7 Km<br />
# [[Pinghu Oil and Gas Field]]<br />
#* China<br />
#* China National Offshore Oil Corp. (Cnooc)<br />
#* Offshore Platform Platform & Pile : 12,800 M/T EPIC<br />
#* Jun. 1996 - Jul. 1998<br />
# [[South West Ampa Gas Field]]<br />
#* Brunei<br />
#* Shell<br />
#* Development Of Facilities For Amdp-30 <br />
#* Platform & Pile, Conductor Pipeline : 3 Km, Power Cable : 3 Km, Total : 1,670 M/T<br />
#* Epic <br />
#* Jul. 1996 - Jun. 1997<br />
# [[Mumbai High Oil Field]]<br />
#* India<br />
#* ONGC<br />
#* Booster Compressor Platform - A & B, Platform : 2 Ea, Piles, Module : 8 Ea, Living Quarter : 2 Ea, Bridge : 4 Ea,Total : 14,165 M/T, EPIC<br />
#* May 1997 - May 1999<br />
# [[Weizhou 12-1 Oil Field]]<br />
#* China<br />
#* China National Offshore Oil Corp.<br />
#* Topside & Living Quarter : 5,630 M/T, Accommodation : 80 Men <br />
#* Construction (Cnooc), Epic <br />
#* Jul. 1997 - Mar. 1999 <br />
# [[Benchamas Oil and Gas Field]]<br />
#* Thailand<br />
#* Pogo Producing Co.<br />
#* Platform (2 Ea) & Bridge (2 Ea) : 8,350 M/T Epic <br />
#* Sep. 1997 - May 1999<br />
# Bhn Revamp Platform - Operator : Ongc, India Living Quarter : 900 M/T Epic Oct. 1998 - Apr. 2000 Accommodation :104 Men - Contractor : Mdl<br />
# [[South Natuna Sea Block B PSC Oil and Gas Fields]]<br />
#* Indonesia<br />
#* Conoco<br />
#* West Natuna Block B Facilities<br />
#* Mogpu : 23,150 M/T, Modification : 2 Ea<br />
#* Epic<br />
#* Feb. 1999 - May 2001<br />
#* Subsea Tie-Back System<br />
# [[Suizhong 36 1 Oil Field]]<br />
#* China<br />
#* China National Offshore Oil Corp.<br />
#* Cep Topside (3 Modules) : 5,880 M/T EPIC<br />
#* Jun. 1999 - Oct. 2000<br />
# [[F2A Hanze Oil Field]]<br />
#* Netherlands<br />
#* Veba Oil<br />
#* Gravity-Based Structure Platform & Deck : 21,000 M/T, Production Capacity : 30,000 Bopd, Storage Capacity : 150,000 Bbl, EPIC<br />
#* Jul. 1999 - Jun. 2001<br />
# [[Bongkot Gas Field]] Phase-3b <br />
#* Thailand<br />
#* Pttep<br />
#* Wellhead Platform , Platform (2 Ea) : 3,235 M/T, Pipeline : 16”~ 18” X 23 Km, Platform Modification : 2 Ea, Epic <br />
#* Aug. 1999 - Jun. 2001<br />
# [[Soroosh Oil Field | Soroosh]]-Nowrooz <br />
#* Iran Epic-1 <br />
#* Shell Exploration B.V, <br />
#* Platform : 4 Ea, Bridge & Tower Subsea Total : 4,124 M/T, P/L : 16” X 12 Km, Epic <br />
#* Sep. 2000 - Mar. 2002<br />
# Eardo Project <br />
#* Korea<br />
#* Korea Offshore Research<br />
#* Platform & Pile : 3,030 M/T Epic <br />
#* Sep. 2000 - Mar. 2003<br />
# [[Bayu Undan Gas Field]]<br />
#* Australia<br />
#* Phillips Petroleum<br />
#* IPD/CUQ Topsides Fabrication, (PPCO), DPP & CUP Topside : 24,300 M/T Ec <br />
#* Oct. 2000 - Jul. 2003<br />
# [[Lan Tay Gas and Condensate Field]]<br />
#* Vietnam<br />
#* British Petroleum<br />
#* Production Platform : 11,000 M/T Package 1 & Package 2, Topside : 5,700 M/T, Epic <br />
#* Dec. 2000 - Jun. 2002 <br />
# [[Donghae 1 Gas Field]]<br />
#* Korea <br />
#* Korea National Oil Corporation, <br />
#* Platform : 10,100 M/T, Pipeline : 14” X 68 Km, Flowlines : 6” X 4 Km, Onshore Terminal, Epic <br />
#* Mar. 2001 - Nov. 2003 <br />
# [[PM 3 CAA Oil and Gas Fields]]<br />
#* Malaysia<br />
#* Lundin Oil Company<br />
#* Pm-3 Cpp Field Development (Phase 2) Topside<br />
#* 7,673 M/T<br />
#* Epic<br />
#* Jul. 2001 - Sep. 2003<br />
# [[Al Shaheen Oil Field]]<br />
#* Qatar<br />
#* Maersk Oil<br />
#* Block 5 Field Development<br />
#* Platform : 10 Ea, Gas Comp. Module : 4 Ea, Total : 37,005 M/T<br />
#* Epic<br />
#* Sep. 2001 - Jun. 2003<br />
# [[Bahr Essalam Gas Field]]<br />
#* Libya<br />
#* ENI<br />
#* Sabratha Platform: 30,832 M/T EPIC <br />
#* Jan. 2002 - Sep. 2004<br />
# [[Huizhou 19-3/2/1 Oil Field]]<br />
#* China<br />
#* CNOOC<br />
#* Platform Cact-Og, Modification Of Platform : 2 Ea, 4 Legged Platform (2 Ea) : 24,000 M/T, Pipeline (2 Lines) : 18” & 14” X 41.1 Km, Subsea Cable : 31.8 Km, Epic<br />
#* Aug. 2002 - Jun. 2004<br />
# Msp Platform Oil & Natural Gas Corporation Limited, India Platform, Pile & Bridge : 13,560 M/T Epic Jun. 2003 - Apr. 2005<br />
# [[Gauri Oil and Gas Field]]<br />
#* India<br />
#* Cairn Energy India<br />
#* Gauri-A Pipeline Installation, Topside : 550 M/T, Pipeline :12” X 5.4 Km, Riser : 2 - IC<br />
#* Dec. 2003 - Mar. 2004<br />
# [[Rong Doi Gas Field]]<br />
#* Vietnam<br />
#* Korea National Oil Corporation<br />
#* Platform (2 Ea) & Bridge Total : 17,200 M/T, Pipeline : 18” X 58 Km Epic<br />
#* Sep. 2004 - Sep. 2006<br />
# East Area Epc-1b <br />
#* Nigeria<br />
#* Mobil Producing Unlimited (Mpn), <br />
#* Platform : 2 Ea, Topside : 1 Ea, Bridge : 3 Ea Total : 13,540 M/T, Epic <br />
#* Dec. 2004 - Jul. 2007<br />
# [[Escravos Oil and Gas Field]] Phase 3a (Egp3a)<br />
#* Nigeria <br />
#* Chevron<br />
#* Offshore Platform (2 Ea), Jacket & Pile : 4,392 M/T Epic, F/O Installation<br />
#* Mar. 2005 - Mar. 2007 <br />
# [[Yadana Gas Field]]<br />
#* Myanmar <br />
#* Total<br />
#* MP Compression Platform, Pile & Bridge : 8,120 Ton EPIC <br />
#* Oct. 2005 - Mar. 2008<br />
# [[Umm Shaif Oil Field]]<br />
#* UAE<br />
#* ADMA-OPCO<br />
#* Gas Injection Facilities, Platform (3ea) Pipeline : 23 km 79 <br />
#* EPIC <br />
#* Sep. 2006 ~ Jun. 2010<br />
#* 39,000<br />
# [[Ofon Oil and Gas Field]]<br />
#* Elf Petroleum<br />
#* Nigeria<br />
#* Ofon Phase 2 – OFP2 Topside - 13,400t<br />
#* EPC<br />
#* Jun. 2007 ~ Nov. 2014<br />
Limited Nigeria Topside <br />
North Rankin ‘B’ Gas Comp. P/F Woodside Australia Topside & DSF epC Dec. 2007 ~ Dec. 2011 23,752<br />
Bongkot 4A P/F PTTEP Thailand Platform & Bridge (3ea) EPIC Sep. 2008 ~ Sep. 2011 29,501<br />
SHWE Platform Daewoo International (Myanmar E&P) Myanmar Platform Pipeline : 126.5 km 83 EPIC Oct. 2009 ~ Apr. 2013 50,750<br />
Barzan Offshore RasGas Qatar Topside (3ea) & L/Q Pipelines : 178.5 km 84 EPIC Jan. 2011 ~ Nov. 2014 8,75<br />
5 Clair Ridge Platform BP North Sea Platform (2ea) EPC Mar. 2011 ~ Feb. 2016 43,100<br />
DSO Platform Chevron Nigeria Platform (2ea) EPC Jan. 2011 ~ Aug. 2014 14,881<br />
Booster Compression Platform Carigali-Hess Malaysia Platform EPC Sep. 2012 ~ Sep. 2015 24,237<br />
Hebron Topside DES (Derrick Equipment Set) Worley Parsons (ExxonMobil) Canada DES : 25 m x 20 m x 80 m epC Feb. 2013 ~ Feb. 2015 3,200<br />
Su Tu Nau (T&I) PTSC M&C (CLJOC) Vietnam Jacket Installation T & I Jul. 2013 ~ Oct. 2013 5,938<br />
Bergading CPP & WHP Hess E&P Malaysia Platform (2ea) & Bridge EPIC May. 2014 ~ Nov. 2016 32,536<br />
NASR Full Field Development – PKG2 ADMA-OPCO UAE Platform (3ea) & Bridge (11ea) EPIC Jul. 2014 ~ May. 2019 63,064<br />
Badamyar Development Project Total Myanmar Platform (2ea) & Bridge & Pile EPC Sep. 2014 ~ Apr. 2017 13,913<br />
Baronia CPP-B P/F Petronas Carigali Malaysia Platform EPIC Nov. 2014 ~ Nov. 2017 22,749</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Rhum_Gas_Field&diff=73495Rhum Gas Field2024-03-25T13:08:57Z<p>Abarrelfull: </p>
<hr />
<div>=== Summary Information ===<br />
* Operator: Serica<br />
* Country: UK<br />
* Location: central North Sea<br />
* Production start: 2005<br />
* Partners: BP (50%) and the Iranian Oil Company (50%)<br />
* Type: Oil / Gas<br />
* Estimated Reserves: <br />
* Production Volume: <br />
<br />
=== Description ===<br />
* Rhum started production in 2005 and is a subsea gas field which is tied back to the [[Bruce Oil and Gas Field]] in the central North Sea<br />
* It is a challenging high-pressure, high temperature (HPHT)<br />
* Gas is transported via the [[Frigg UK Gas Pipeline System]] to the [[FUKA St Fergus Gas Processing Terminal]]<br />
<br />
=== Contractors ===<br />
* **Saipem:** A 44km pipe-inpipe export pipeline connecting Rhum field to Bruce platform<br />
* **AMEC:** <br />
** Front-end engineering design<br />
** Engineering and design, procurement, fabrication, hook-up, completions and commissioning support <br />
* **Aker Solutions:** Umbilicals<br />
* **BiFab:** Riser Caisson<br />
<br />
=== History ===<br />
* 2002 - AMEC awarded FEED contract<br />
* 2003 - Project development approved by UK Government<br />
* 2003 - Saipem awarded pipeline contract<br />
* 2010 - BP Suspends Production from Rhum Gas Field<br />
* 2013 - The UK government allows the restart of the field<br />
* 2018 - Serica becomes the operator of the fields after acquiring a stake from BP<br />
<br />
=== Geology ===<br />
* The Rhum reservoir consists of fine-grained Upper Jurassic turbidite sands deposited over a tilted fault block. <br />
* The produced gas has an H2S content of 10-20ppm and a CO2 content of 4-8.5%, and as such is classified as both ‘sour’ and corrosive. <br />
<br />
=== Links ===<br />
# [http://www.bp.com/liveassets/bp_internet/globalbp/STAGING/global_assets/downloads/U/uk_asset_rhum_factsheet.pdf Rhum, BP]<br />
# [[Aker Solutions Umbilical References]]<br />
# [[Saipem Europe Pipeline References]]<br />
# [[BiFab Subsea References]]<br />
# [[FoundOcean Europe Subsea References]]<br />
# [http://killajoules.wikidot.com/archive:saipem-awarded-new-offshore-construction-contracts-a Saipem awarded new offshore construction contracts amounting to 285 million USD]<br />
# [http://killajoules.wikidot.com/archive:35-million-contract-to-develop-uks-largest-undevelop £35 Million Contract to Develop UK’s Largest Undeveloped Gas Reservoir and Extend Life of BP Bruce Platform]<br />
# [http://killajoules.wikidot.com/blog:159 BP Suspends Production from Rhum Gas Field]<br />
# [http://killajoules.wikidot.com/blog:4654 Rhum North Sea gas field to restart production]<br />
# [https://abarrelfull.blogspot.com/2023/08/completion-of-acquisition-of-total-e.html Completion of the acquisition of Total E&P, BHP and Marubeni interests in Bruce and Keith fields]<br />
<br />
[[category:Field]]<br />
[[category:UK]]<br />
[[category:Serica]]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Fuka_St_Fergus_Gas_Processing_Terminal&diff=73494Fuka St Fergus Gas Processing Terminal2024-03-25T13:08:38Z<p>Abarrelfull: </p>
<hr />
<div>Summary Information<br />
<br />
* Ownership: Total<br />
* Website: http://www.total.com/en<br />
* Location: St Fergus, Scotland<br />
* Capacity: <br />
<br />
+++ Brief Description<br />
* It is a 3-train process plant that is now known as the Frigg UK Terminal. <br />
* Gas is transported to the plant by the **[[Frigg UK Gas Pipeline System]]** and from the [[Vesterled Gas Pipeline]] which brings gas from the Norwegian sector<br />
* The [[Shetland Island Regional Gas Export Pipeline System (SIRGE)]] will permit the tie-in of West of Shetland gas into FUKA. <br />
* The SIRGE pipeline runs from the Shetland Gas Plant (SGP) at Sullom Voe on Shetland to a sub-sea tie-in on the FUKA Pipeline at the MCP01 bypass valves.<br />
<br />
++++ Related Oil and Gas Fields<br />
* It processes gas from the [[Greater Alwyn Oil and Gas Fields | Alwyn Area]] (Alwyn North, Forvie, Grant, Jura, Nuggets, Islay, Dunbar and Ellon), [[Bruce Oil and Gas Field | Bruce]], [[Rhum Gas Field | Rhum]], Keith, [[Buzzard Oil Field | Buzzard]], the Flotta Catchment Area, [[Ross and Blake Oil Fields | Ross]] and [[Captain Oil Field | Captain]].<br />
<br />
+++ Ongoing Projects<br />
* -<br />
<br />
+++ Other Information<br />
* -<br />
<br />
+++ History<br />
* 1977 - Phase I of the plant was commissioned<br />
* 1978 - Phase II was completed<br />
<br />
+++ Links<br />
# [http://www.total-icop.co.uk/fuka/ Total, FUKA]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Frigg_UK_Gas_Pipeline_System&diff=73493Frigg UK Gas Pipeline System2024-03-25T13:07:46Z<p>Abarrelfull: </p>
<hr />
<div>Summary Information<br />
<br />
* Source: [[Frigg Gas Field]]<br />
* Destination: [[Fuka St Fergus Gas Processing Terminal]]<br />
* Ownership: Total<br />
* Website: <br />
* Length: 362 kilometres ( miles) <br />
* Capacity: per day <br />
* Status: Operating<br />
<br />
+++ Details<br />
* Frigg connects the [[Fuka St Fergus Gas Processing Terminal]] with the [[Frigg Gas Field]] in the Norwegian sector of the North Sea<br />
* The Frigg UK Pipeline system commences at the Alwyn North Field and consists of 24" diameter pipeline which is 110 km long and connects into the 32" diameter line in the vicinity of the Frigg Field facilities (at the TP1 bypass spool). <br />
* The line between the TP1 bypass spool and the the Frigg UK Terminal at St Fergus is 362km long. The 32" pipeline was laid and commissioned in 1977 and has been in continuous service since that date. In 2003, the 32" pipeline celebrated its 25th anniversary.<br />
* An 18" pipeline from the Flotta Catchment Area enters the system via a sub-sea connection in the vicinity of the decommissioned MCP-01 platform. This is located in UKCS Block 14/9. <br />
* There are also tie-ins from the [[Bruce Oil and Gas Field | Bruce]], Ross, Captain and Buzzard fields. The SIRGE pipeline which will tie-in in mid-2014 will run from the Shetland Gas Plant (SGP) at Sullom Voe on Shetland to a sub-sea tie-in on the FUKA Pipeline at the MCP01 bypass valves.<br />
* The nominal capacity of the 32" pipeline is 36 MMscm/d. The actual capacity is a function of gas source location and compositions.<br />
<br />
++++ Related Oil and Gas Fields<br />
* It transports gas from the [[Greater Alwyn Oil and Gas Fields | Alwyn Area]] (Alwyn North, Forvie, Grant, Jura, Nuggets, Islay, Dunbar and Ellon), [[Bruce Oil and Gas Field | Bruce]], [[Rhum Gas Field | Rhum]], Keith, [[Buzzard Oil Field | Buzzard]], the Flotta Catchment Area, [[Ross and Blake Oil Fields | Ross]] and [[Captain Oil Field | Captain]].<br />
<br />
+++ History<br />
* 1977 - The Frigg Gas Pipeline is commissioned <br />
* 2008 - Approval granted for decommissioning of MCP-01 platform<br />
<br />
+++ Other Information<br />
* -<br />
<br />
+++ Links<br />
# [http://www.total-icop.co.uk/fuka/technical_description.asp Technical Description, Total]<br />
# [[FoundOcean Europe Subsea References]]<br />
# [[UK Oil and Gas Field Approved Decommissioning Programmes]]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Global_Maritime_Pipeline_References&diff=73492Global Maritime Pipeline References2024-03-25T13:07:09Z<p>Abarrelfull: </p>
<hr />
<div>References<br />
<br />
#*[[Pazflor Oil Field]]<br />
#* Total<br />
#* Pazflor Project: 2008-2011<br />
#* Warranty surveyor for installation of pipelines, risers, umbilicals and subsea manifolds, offshore Angola. <br />
#*[[Babbage Gas Field]]<br />
#* EON<br />
#* Rita & Babbage Project: 2008-2009<br />
#* Warranty surveyor for installation of flowline, UK Sector North Sea. <br />
# Gaz de France Projects: 2005-2009 <br />
#* Warranty surveyor for installation of numerous flowlines and umbilicals, Dutch sector North Sea. <br />
#*[[Viking Gas Field]]<br />
#* Conoco-Phillips<br />
#* Viking - Replacement Project: 2008-2009 <br />
#* Warranty surveyor for installation of flowline, UK sector North Sea. <br />
#*[[Sequoia Gas Field]]<br />
#* Burullus<br />
#* Sequoia Project: 2008-2009<br />
#* Warranty surveyor for installation of pipelines, umbilicals and subsea manifolds, Egypt. <br />
# INAgip Project: 2008 <br />
#* Warranty surveyor for installation of flowlines in Adriatic Sea. <br />
#*[[Fateh Oil Field]]<br />
#* Dubai Petroleum<br />
#* Fateh O-ZB and N-B Project: 2008<br />
#* Warranty surveyor for installation of pipelines, UAE. <br />
#*[[M07 Gas Fields]]<br />
#* KCI Cirrus<br />
#* M7 Gas Project: 2008 <br />
#* Warranty surveyor for installation of flowline and riser, Dutch sector North Sea. <br />
# [[Umm Shaif Oil Field]]<br />
#* ADNOC <br />
#* Umm Shaif Project 2008-2009<br />
#* Warranty surveyor for installation of pipelines and cables, UAE. <br />
# [[Nord Stream Gas Pipeline]]<br />
#* Nord Stream Pipeline Project: 2007-2012 <br />
#* Marine, engineering and schedule risk reviews, marine consultancy and marine warranty services for installation of two 48” pipelines from Russia to Germany through the Baltic Sea. <br />
# West Delta Deep Marine Phase IV Project: 2007-2008 <br />
#* Burullus<br />
#* Warranty surveyor for installation of pipelines, umbilicals and subsea manifolds, Egypt. <br />
# [[Kelvin Gas Field]]<br />
#* Conoco-Phillips<br />
#* Kelvin Project: 2007<br />
#* Warranty surveyor for installation of flowline and subsea manifolds, UK sector North Sea. <br />
# [[Rosetta Gas Field]]<br />
#* Rashpetco<br />
#* Rosetta Phase III: 2006-2008<br />
#* Warranty surveyor for installation of flowlines, umbilicals and subsea manifolds, Egypt. <br />
# [[Kharg Island Oil Terminal]]<br />
#* Valentine<br />
#* Kharg Island Project: 2006-2007<br />
#* Warranty surveyor for installation of infield lines and export lines, Iran. <br />
# [[Mimas and Tethys Gas Fields]]<br />
#* Conoco-Phillips<br />
#* Mimas & Tethys Project: 2006 <br />
#* Warranty surveyor for installation of flowlines, UK sector North Sea. <br />
# [[BBL Pipeline]]<br />
#* Gasunie<br />
#* BBL Project: 2006<br />
#* Warranty surveyor for installation of 36” export line from Holland to the UK. <br />
# [[Bouri Oil and Gas Field]]<br />
#* Agip<br />
#* Bouri EADP: 2006 <br />
#* Warranty surveyor for installation of flexible pipelines<br />
# [[Kashagan Oil Field]]<br />
#* Saipem <br />
#* Kashagan Phase 1 Field Development<br />
#* Transportation analyses and sea fastening design of line pipe transportation.<br />
#* 2006 <br />
# [[Okwori Oil and Gas Field]]<br />
#* Addax<br />
#* Okwori: 2005-2007<br />
#* Warranty surveyor for installation of flexible flowlines and umbilicals, Nigeria. <br />
# [[Saturn Area Gas Fields]]<br />
#* Conoco-Phillips Saturn & Munro Project: <br />
#* Warranty surveyor for installation of flowlines, UK sector North Sea.<br />
#* 2005 <br />
# AIOC East/West Azeri Cablelay Project 2005 Structural and naval architectural design of cable lay equipment onboard the Pacific Askari. <br />
# [[Shah Deniz Gas Field]]<br />
#* BP<br />
#* Shah Deniz I & II Projects: <br />
#* Warranty surveyor for installation of flowlines, export lines and subsea facilities in Caspian. Feasibility study of deep water pipelay by PLBG, Caspian Sea.<br />
#* 2004 - 2008 <br />
# [[Kashagan Oil Field]]<br />
#* AGIP KCO <br />
#* Kashagan Project<br />
#* Construction risk review of pipelay in very shallow water.<br />
#* 2004 <br />
# [[Bahr Essalam Gas Field]]<br />
#* Agip Project: 2003 - 2005<br />
#* Warranty surveyor for installation of export pipelines, flowlines, umbilicals and subsea facilities for Bahr Essalam, Libya. <br />
# INAgip Project: 2003 - 2006 <br />
#* Warranty surveyor for installation of flowlines and export line in Adriatic Sea. <br />
# Dolphin Energy: 2003-2006 Warranty surveyor for installation of 36” sealines, 48” export pipeline and umbilicals, Qatar and UAE. <br />
# [[Azeri-Chirag-Guneshli Oil Field]]<br />
#* AIOC (BP) ACG Project: 2002 - 2008<br />
#* Warranty surveyor for installation of flowlines, export lines and subsea facilities associated with six platforms in the Caspian Sea. <br />
# [[Nini Oil Field]]<br />
#* DONG Nini & Cecilie Project: 2002 - 2003<br />
#* Warranty surveyor for installation of export pipelines to existing Siri platform, and infield flowlines. <br />
# [[Caister Murdoch Gas Fields]]<br />
#* Conoco CMS-III Project: 2002<br />
#* Warranty surveyor for installation of infield flowlines (10”/12”) and umbilical, and subsequent trenching operations. <br />
# [[Helvellyn Gas Field]]<br />
#* ATP Helvellyn Project: 2002<br />
#* Warranty surveyor for installation of 8” pipeline and umbilical <br />
# [[Juno Gas Fields]]<br />
#* BG Juno Project: 2002<br />
#* Warranty surveyor for installation of 16” piggy backed infield pipelines and subsea manifolds. <br />
# [[Viking Gas Field]]<br />
#* Conoco<br />
#* Viking Project: 2002<br />
#* Warranty surveyor for installation of 12” piggybacked infield pipeline. <br />
# [[Clyde Oil Field]]<br />
#* Clyde Q1-B Project: 2002<br />
#* Warranty surveyor for 16” piggy-backed, trenched infield pipeline. <br />
# [[Beryl Oil Field]]<br />
#* Mobil<br />
#* Skene Project: 2001 - 2003<br />
#* Warranty surveyor for loadout and transportation of towheads; launch, controlled depth tow and installation of two 7.5 km pipeline bundles. <br />
# Gaz de France Project: 2001 <br />
#* Warranty surveyor for conventional pipelay.<br />
# [[Bruce Oil and Gas Field]]<br />
#* BHP<br />
#* Keith Project: 2000<br />
#* Warranty surveyor for launch, controlled-depth tow and installation of a 7 km pipeline bundle. <br />
# [[Clyde Oil Field]]<br />
#* UK<br />
#* Talisman<br />
#* Clyde Q4A Project: 2000<br />
#* Warranty surveyor for installation of 14” pipeline by Lorelay. <br />
# [[Judy Joanne and Jade Gas and Condensate Fields]]<br />
#* UK<br />
#* Phillips<br />
#* Jade Project: 2000 - 2001 <br />
#* Warranty surveyor for conventional pipelay. <br />
# [[Beryl Oil Field]]<br />
#* UK<br />
#* Mobil<br />
#* Buckland Project: 1999 <br />
#* Warranty surveyor for loadout and transportation of towheads; launch, controlled depth tow and installation of two 6 km pipeline bundles. <br />
# British Gas ECA Project: 1999<br />
#* Inspection of pipelay barge LB-200. <br />
# Noord Gas Transport Project: 1998 <br />
#* Warranty survey for 36” pipeline installation by Semac-1. <br />
# [[Terra Nova Oil Field]]<br />
#* Canada<br />
#* Suncor<br />
#* Terra Nova Project: 1998 - 2001<br />
#* Warranty surveyor and marine consultant for infield pipelines and associated subsea structures. <br />
# [[Morpeth Oil and Gas Field]]<br />
#* McDermott Project: 1997<br />
#* Warranty surveyors for Morpeth Field Development, pipelay operations by DB28. <br />
# Europe Interconnector Project: 1997<br />
#* Warranty surveyors for installation of pipeline including pipelay and trenching activities. <br />
# [[Boulton Gas Field]]<br />
#* UK<br />
#* Conoco<br />
#* Boulton Project: 1997<br />
#* Warranty surveyors for installation of pipeline including reel pipelay and trenching activities. <br />
# Total Project: 1997 <br />
# DP/Safety Audit of CSO Apache reference Cormorant Alpha to Alwyn NAB, 12” pipeline lay. <br />
# Europe Interconnector Project: 1996 Risk analysis for the installation of the 48” gas interconnector pipeline from UK to Belgium.<br />
# [[Haltenpipe Gas Pipeline]]<br />
#* EMC<br />
#* Haltenpipe Project: 1996<br />
#* Safety assessment of marine operations and marine risks for Haltenpipe. <br />
# EMC Gibraltar Crossing Project: 1995 <br />
#* Assessment of risk at all work locations on Castoro Sei and Bar Protector during Gibraltar pipe crossing. Development of risk assessment tool for use by EMC. <br />
# [[Britannia Gas Field]]<br />
#* UK<br />
#* Conoco/Chevron<br />
#* Britannia Project: 1994 - 97 <br />
#* Marine consultants and warranty surveyors for the construction, launch, controlled-depth tow and offshore installation of two pipeline bundles and normal pipelay of export and infield pipelines. <br />
# [[Bream Oil and Gas Field]]<br />
#* Australia<br />
#* Esso<br />
#* Bream & West Tuna Project: 1994 - 1996 <br />
#* Warranty surveyor for launch, tow and installation of two gas pipelines (7 km and 3 km). <br />
# [[Jupiter Gas Field]]<br />
#* Conoco<br />
#* Jupiter Project: 1994 - 1995<br />
#* Warranty surveyors for the installation of the pipeline. <br />
# [[Clyde Oil Field]]<br />
#* UK<br />
#* Clyde Q8 Project: 1994 <br />
#* Warranty surveyors for the installation of the export pipeline. <br />
# [[Victor Gas Field]]<br />
#* UK<br />
#* Conoco<br />
#* NW Victor Project: 1993 - 1995<br />
#* Warranty surveyors for the installation of the subsea structure and pipeline. <br />
# [[Europipe I Gas Pipeline]]<br />
#* Statoil<br />
#* Europipe Project: 1993 - 1995 <br />
#* Project specific hazard analyses of contractor’s proposals and operations for installation of the Europipe. <br />
# [[Zeepipe Gas Pipeline]]<br />
#* Statoil<br />
#* Zeepipe Project: 1992 - 1994<br />
#* Project specific hazard analyses of contractor’s proposals and operations for installation of the Zeepipe. <br />
# [[Eldfisk Oil Field]]<br />
#* Norway<br />
#* Phillips<br />
#* Embla Project: 1992<br />
#* Marine consultants and warranty surveyor for the construction, launch, controlled-depth tow and offshore installation of the 6 km pipeline bundles.</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Saipem_Europe_Fixed_Offshore_Production_Facilities_Project_R&diff=73491Saipem Europe Fixed Offshore Production Facilities Project R2024-03-25T13:05:41Z<p>Abarrelfull: </p>
<hr />
<div># [[Eldfisk Oil Field]]<br />
#* Norway <br />
#* ConocoPhillips <br />
#* Eldfisk II - wellhead, process and accommodation platform <br />
#* 12,300 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* Under Execution<br />
# [[Ekofisk Oil Field]]<br />
#* Norway <br />
#* ConocoPhillips <br />
#* The Greater Ekofisk Area Development living quarters, bridge support and wellhead platforms <br />
#* 37,200 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 2013<br />
# [[Ekofisk Oil Field]]<br />
#* Norway <br />
#* Statoil <br />
#* Ekofisk 2/4-S Jacket and Tripod Removal <br />
#* 11,300 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* Under Execution<br />
# [[Gudrun Oil and Gas Field]] <br />
#* Norway <br />
#* Statoil <br />
#* Gudrun Sigrun Development Project - Gudrun platform <br />
#* 18,700 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 2013<br />
# [[Gullfaks Oil Field]]<br />
#* Norway <br />
#* Statoil <br />
#* Gullfaks A - drilling facilities change-out <br />
#* 2,000 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* Under Execution<br />
# [[Valemon Gas and Condensate Field]]<br />
#* Norway <br />
#* Statoil <br />
#* Valemon Topsides and Flare <br />
#* 9,400 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* Under Execution<br />
# [[Ika and Ida Gas Fields]]<br />
#* Croatia<br />
#* INAgip<br />
#* Ika JZ Platform<br />
#* 1,500<br />
#* T&I<br />
#* Crawler<br />
#* 2013<br />
# [[Britannia Gas Field]] <br />
#* United Kingdom <br />
#* ConocoPhillips <br />
#* Britannia Mono Column and Compression Module <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 2013<br />
# [[Elgin Franklin Gas Field]]<br />
#* United Kingdom <br />
#* Elf Exploration UK <br />
#* Elgin B Wellhead Platform Jacket <br />
#* 5,400 <br />
#* EPIC <br />
#* Saipem 7000 <br />
#* 2012<br />
# [[Golden Eagle Oil Field]] <br />
#* United Kingdom <br />
#* Nexen <br />
#* Golden Eagle PUQ and Wellhead Platform <br />
#* 30,500 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 2013<br />
# [[Auk Oil Field]]<br />
#* United Kingdom <br />
#* Talisman <br />
#* Auk Development - Block 30/16 UK North Sea <br />
#* 6,000 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* Under Execution<br />
# [[Jasmine Gas and Condensate Field]] <br />
#* United Kingdom <br />
#* ConocoPhillips <br />
#* Jasmine Development Project - wellhead, accomodation and process platforms <br />
#* 30,400 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 2013<br />
# [[Elgin Franklin Gas Field]]<br />
#* United Kingdom <br />
#* Elf Exploration UK <br />
#* West Franklin Wellhead Platform Jacket <br />
#* 5,400 <br />
#* EPIC <br />
#* Saipem 7000 <br />
#* Under Execution<br />
# [[Valhall Oil Field]]<br />
#* Norway<br />
#* BP Norge<br />
#* Valhall Re-development Project - production platform 33,400 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 2010<br />
# [[Annamaria Gas Field]]<br />
#* Croatia<br />
#* INAgip<br />
#* Annamaria A platform topside and sealines<br />
#* 3,300<br />
#* T&I S355 <br />
#* 2009<br />
# [[Annamaria Gas Field]]<br />
#* Italy <br />
#* Eni E&P <br />
#* Annamaria B platform jacket <br />
#* 1,200 <br />
#* T&I <br />
#* S 355 <br />
#* 2009<br />
# [[Annamaria Gas Field]]<br />
#* Italy <br />
#* Eni E&P <br />
#* Annamaria B platform topsides and sealines <br />
#* 2,000 <br />
#* T&I <br />
#* Crawler <br />
#* 2009<br />
# [[Ana Gas Field]], [[Irina Gas Field]], [[Vesna Gas Field]]<br />
#* Croatia<br />
#* INAgip<br />
#* Ana, Vesna, Irina platform topsides<br />
#* 800<br />
#* T&I <br />
#* S 355 <br />
#* 2008<br />
# [[Halfdan Oil and Gas Field]]<br />
#* Denmark<br />
#* Maersk Olie Og Gas <br />
#* Halfdan Northeast Phase 3 Development - platforms <br />
#* 10,600 <br />
#* T&I <br />
#* Saipem 7000<br />
#* 2007<br />
# [[Buzzard Oil Field]]<br />
#* United Kingdom <br />
#* Eni UK <br />
#* Buzzard Platforms <br />
#* 49,100 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 2006<br />
# [[Ika and Ida Gas Fields]], [[Ivana Gas Field]]<br />
#* Croatia <br />
#* INAgip<br />
#* Unmanned gas platforms and sealines<br />
#* 8,600<br />
#* T&I <br />
#* Crawler 2005<br />
# [[Dan Oil Field]]<br />
#* Denmark <br />
#* Maersk <br />
#* DAN FG Platform and Bridge <br />
#* 11,400 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 2005<br />
# [[Clair Oil Field]]<br />
#* United Kingdom <br />
#* BP <br />
#* Clair Phase I Development Project <br />
#* 27,400 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 2004<br />
# [[Valhall Oil Field]]<br />
#* Norway <br />
#* BP <br />
#* Valhall Jacket Repair and Topside Installation <br />
#* 11,100 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 2003<br />
# Norway Statoil Kvitebjorn PDQ Platform 16,200 Saipem 7000 2003<br />
# [[K4B and K5A Gas Fields]]<br />
#* Netherlands<br />
#* TotalFinaElf <br />
#* K5PK Compression Platform <br />
#* 3,700 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 2003<br />
# [[Cecilie Oil Field]]<br />
#* Denmark <br />
#* Dong A/S <br />
#* Nini and Cecilie Wellhead Platforms <br />
#* 6,400 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 2003<br />
# [[Valhall Oil Field]]<br />
#* Norway <br />
#* Aker Stord <br />
#* Valhall Water Injection Platform <br />
#* 6,800 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 2002<br />
# [[F2A Hanze Oil Field]]<br />
#* Netherlands <br />
#* Hyundai Heavy Industries <br />
#* Hanze Integrated Production Deck <br />
#* 7,100 <br />
#* T&I <br />
#* Saipem <br />
#* 7000 <br />
#* 2001<br />
# [[Jade Oil and Gas Field]]<br />
#* UK<br />
#* Phillips Petroleum Co. <br />
#* Jade Platform <br />
#* 6,300 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 2001<br />
# [[Huldra Gas and Condensate Field]]<br />
#* Norway <br />
#* Statoil <br />
#* Huldra Phase 1 - platform jacket <br />
#* 8,100 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 2001<br />
# [[Huldra Gas and Condensate Field]]<br />
#* Norway <br />
#* Statoil <br />
#* Phase 2 - platform topsides <br />
#* 4,300 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 2001<br />
# [[Ivana Gas Field]]<br />
#* Croatia<br />
#* INAgip <br />
#* Ivana E, B, and D Platforms and Sealines <br />
#* 1,000 <br />
#* T&I <br />
#* Castoro II - Crawler <br />
#* 2000<br />
# Italy Agip Frame Agreement 1999 / 2003 - Year 2000 - platforms 12,800 T&I Crawler - Pearl Marine 2000<br />
# [[Oseberg Oil Field]]<br />
#* Norway <br />
#* Norsk Hydro Produksjon <br />
#* Oseberg Sor Platform <br />
#* 25,100 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 2000<br />
# [[Asgard Oil and Gas Field]]<br />
#* Norway <br />
#* Statoil <br />
#* Asgard B - semisubmersible platform topsides <br />
#* EPC <br />
# [[Oseberg Oil Field]]<br />
#* Norway <br />
#* Norsk Hydro Produksjon <br />
#* Oseberg Gass (D) Platform <br />
#* 9,800 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 1999<br />
# [[Eldfisk Oil Field]]<br />
#* Norway <br />
#* Phillips Petroleum<br />
#* Eldfisk - 2/7E platform <br />
#* 8,100 <br />
#* EPIC <br />
#* Saipem 7000 <br />
#* 1999<br />
# [[Bleo Holm FPSO]]<br />
#* United Kingdom <br />
#* Bluewater Engineering <br />
#* Bleo Holm Project - FPSO topsides <br />
#* EPIC <br />
#* 1999<br />
# [[Oseberg Oil Field]]<br />
#* Norway <br />
#* Norsk Hydro Produksjon <br />
#* Oseberg OST Platform <br />
#* 20,600 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 1998<br />
# Italy Agip Campagna Mare 1998 Adriatic Sea - platforms and sealines 3,300 T&I Crawler 1998<br />
# [[Ekofisk Oil Field]]<br />
#* Norway <br />
#* Phillips Petroleum<br />
#* Ekofisk 2/4J platform jacket Phase 1 <br />
#* 17,800 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 1997<br />
# [[Ekofisk Oil Field]]<br />
#* Norway <br />
#* Phillips Petroleum<br />
#* Ekofisk 2/4J Topsides Phase 2 <br />
#* 25,600 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 1997<br />
# Italy Agip Campagna Mare 1997 Adriatic Sea - platform and sealines 5,200 T&I Crawler - Pearl Marine 1997<br />
# [[Bonaccia Gas Field]]<br />
#* Italy<br />
#* TMF<br />
#* Bonaccia Gas Field Development Project - production platform and sealines<br />
#* 2,600<br />
#* EPIC<br />
#* Crawler - Pearl Marine<br />
#* 1997<br />
# [[Varg Oil and Gas Field]]<br />
#* Norway<br />
#* Saga Petroleum <br />
#* Varg Field Development - wellhead platform <br />
#* 5,000 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 1997<br />
# [[Elgin Franklin Gas Field]]<br />
#* United Kingdom <br />
#* Elf Exploration UK <br />
#* Elgin and Franklin Wellhead Jacket Installation <br />
#* 9,100 <br />
#* EPIC <br />
#* Saipem 7000 <br />
#* 1997<br />
# [[Andrew Oil and Gas Field]]<br />
#* United Kingdom<br />
#* BP Exploration<br />
#* Andrew Project<br />
#* 17,400 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 1996<br />
# [[Sleipner Gas and Condensate Field]]<br />
#* Norway<br />
#* Statoil<br />
#* Sleipner Vest SLT Gas Treatment Platform<br />
#* 25,600<br />
#* T&I<br />
#* Saipem 7000<br />
#* 1996<br />
# Italy Agip Nilde Oil Field Development - single point mooring and sealines EPC N. A. 1986<br />
# [[Captain Oil Field]] - North Sea<br />
#* United Kingdom <br />
#* Texaco<br />
#* WPP Platform 13,700 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 1996<br />
# [[Erskine Oil and Gas Field]] - North Sea<br />
#* United Kingdom <br />
#* Texaco UK <br />
#* Erskine Field Development - platform jacket <br />
#* 2,700 <br />
#* EPIC <br />
#* Saipem 7000 <br />
#* 1996<br />
# [[Captain Oil Field]] - North Sea<br />
#* United Kingdom <br />
#* Texaco<br />
#* Captain Field Development Project - wellhead protection platform and sealines <br />
#* 16,000 <br />
#* EPIC <br />
#* Maxita - Saipem 7000 <br />
#* 1996<br />
# [[Daria Gas Field]]<br />
#* Italy Agip<br />
#* Daria B - drilling and production platform<br />
#* 2,100<br />
#* EPC<br />
#* 1995<br />
# [[Froy Oil and Gas Field]]<br />
#* Norway <br />
#* Elf Norge <br />
#* Froy Wellhead Platform Phase 2 <br />
#* 12,300 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 1995<br />
# [[Froy Oil and Gas Field]]<br />
#* Norway <br />
#* Elf Norge <br />
#* Froy Wellhead Platform Phase 3 <br />
#* 3,200<br />
#* T&I<br />
#* Saipem 7000<br />
#* 1995<br />
# [[Froy Oil and Gas Field]]<br />
#* Norway <br />
#* Elf Norge<br />
#* Froy Wellhead Platform Template Phase 1<br />
#* T&I<br />
#* Saipem<br />
#* 7000 1995<br />
# [[Judy Joanne and Jade Gas and Condensate Fields]]<br />
#* Norway<br />
#* Phillips Petroleum Company<br />
#* "J" Block Judy Wellhead Platform<br />
#* 30,900<br />
#* T&I <br />
#* Saipem 7000 <br />
#* 1995<br />
# [[Sleipner Gas and Condensate Field]]<br />
#* Norway<br />
#* Statoil<br />
#* Sleipner Vest SLB Wellhead Platform<br />
#* 7,500<br />
#* T&I <br />
#* Saipem 7000 <br />
#* 1995<br />
# [[Davy, Bessemer, Beaufort and Brown Gas Fields]]<br />
#* United Kingdom <br />
#* Amoco<br />
#* Brown & Root Highland Fabricators<br />
#* Davy & Bessemer Monotower Platforms<br />
#* 2,600<br />
#* T&I<br />
#* Saipem 7000<br />
#* 1995<br />
# [[Claymore Oil Field]]<br />
#* United Kingdom <br />
#* Elf Enterprise Caledonia <br />
#* Claymore Accommodation Platform Project (CAP) <br />
#* 10,500 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 1995<br />
# [[Europipe I Gas Pipeline]]<br />
#* Norway<br />
#* Statoil<br />
#* Europipe 16/11E Riser Platform<br />
#* 11,500<br />
#* T&I <br />
#* Saipem 7000 <br />
#* 1994<br />
# [[Greater Alwyn Oil and Gas Fields]]<br />
#* United Kingdom<br />
#* Total Oil Marine<br />
#* Dunbar Integrated Deck <br />
#* EPC <br />
#* 1994<br />
# Italy Agip Campagna Mare 1993 Adriatic Sea - platforms and sealines T&I Castoro II 1993<br />
# [[West Sole Gas Fields]]<br />
#* United Kingdom<br />
#* BP Exploration<br />
#* Hyde Alliance Project - production platform<br />
#* 2,000<br />
#* T&I<br />
#* 1993<br />
# [[Alba Oil Field]]<br />
#* United Kingdom<br />
#* Chevron<br />
#* Alba Field Development - Alba Northern Platform<br />
#* 15,100<br />
#* T&I<br />
#* Saipem 7000<br />
#* 1993<br />
# [[West Sole Gas Fields]]<br />
#* United Kingdom<br />
#* BP Exploration<br />
#* Project Alliance Hyde Platform<br />
#* 2,300<br />
#* T&I<br />
#* Saipem 7000<br />
#* 1993<br />
# Italy Agip Platforms Installation in Adriatic Sea T&I Castoro II - Pearl Marine 1992<br />
# [[Bruce Oil and Gas Field]]<br />
#* UK <br />
#* Britoil <br />
#* Bruce Area Development <br />
#* 51,400 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 1992<br />
# [[Markham Gas Field]]<br />
#* United Kingdom<br />
#* Lasmo-Ultramar Exploration<br />
#* Markham J6A platform <br />
#* 5,200 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 1992<br />
# [[Eldfisk Oil Field]]<br />
#* Norway<br />
#* Phillips Petroleum<br />
#* Embla Field Development<br />
#* 8,700<br />
#* T&I<br />
#* Saipem 7000<br />
#* 1992<br />
# [[Tiffany Oil Field]]<br />
#* United Kingdom<br />
#* Agip UK<br />
#* Tiffany Field Development<br />
#* 30,700<br />
#* T&I<br />
#* Saipem 7000<br />
#* 1992<br />
# United Kingdom Amoco Exploration Company Central Graben Development 30,700 T&I Saipem 7000 1992<br />
# [[Lomond Oil and Gas Field]]<br />
#* United Kingdom <br />
#* Amoco Exploration Company <br />
#* Central Graben Development - Lomond Integrated Deck <br />
#* 9,800 <br />
#* PC <br />
#* 1992<br />
# Italy Agip Platforms and Sealines Installation T&I Castoro II 1991<br />
# [[Rospo Mare Oil Field]]<br />
#* Italy<br />
#* Elf<br />
#* Rospo Mare C - platform and sealine<br />
#* 5,000<br />
#* T&I<br />
#* Castoro II<br />
#* 1991<br />
# [[Rospo Mare Oil Field]]<br />
#* Italy<br />
#* Elf<br />
#* Rospomare RSMC Platform<br />
#* 4,300<br />
#* EPIC<br />
#* 1991<br />
# [[Oseberg Oil Field]]<br />
#* Norway <br />
#* Norsk Hydro Produksjon<br />
#* Oseberg 2 Topsides<br />
#* 17,300<br />
#* T&I<br />
#* Saipem 7000<br />
#* 1991<br />
# [[Luna Gas Field]]<br />
#* Italy<br />
#* Agip<br />
#* Luna B and Giovanna Platforms Fabrication and T&I<br />
#* Castoro II<br />
#* 1990<br />
# [[Gyda Oil Field]]<br />
#* Norway <br />
#* BP Development <br />
#* Gyda Platform <br />
#* 19,200 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 1990<br />
# [[Veslefrikk Oil and Gas Field]]<br />
#* Norway <br />
#* Statoil <br />
#* Veslefrikk Platform <br />
#* 14,700 <br />
#* T&I <br />
#* Saipem 7000 <br />
#* 1989<br />
# United Kingdom Volker Stevin Aerospace British Aerospace Platforms 1,800 T&I Saipem 7000 1989<br />
# [[Barbara Gas Field]]<br />
#* Italy<br />
#* Agip<br />
#* Armida, Pennina and Barbara D Topsides<br />
#* 1,700<br />
#* Fabrication and T&I<br />
#* Castoro II<br />
#* 1987<br />
# Italy Agip Platforms and Sealines - Risers instalaltion T&I Castoro II 1978<br />
# Italy Agip Platforms Installation - Adriatic Sea 4,200 T&I Castoro II 1971<br />
# Italy Agip Revamping of Drilling Platforms 1,200 T&I 1971<br />
# [[Ekofisk Oil Field]]<br />
#* Norway <br />
#* Phillips Petroleum<br />
#* Ekofisk Field - drilling and production platform <br />
#* 5,500 <br />
#* T&I <br />
#* 1971<br />
# Italy Agip Drilling and Production Platforms - Adriatic Sea 4,500 T&I Castoro II 1970<br />
# Italy Agip Platforms Installation - Adriatic Sea 2,500 T&I 1969<br />
# Italy Agip Drilling and Production Platforms - Adriatic Sea 5,000 T&I 1968<br />
# Italy Elf Italiana Drilling and Production Platforms - Adriatic Sea 800 T&I 1968<br />
# Italy Agip Drilling and Production Platform - offshore Sicily 900 T&I 1967<br />
# Italy Agip Drilling and Production Platforms - Adriatic Sea 1,800 T&I 1967<br />
# Italy Agip Platform Installation - offshore Sicily 1,200 T&I 1961</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Greenstream_pipeline_Interconnector&diff=73490Greenstream pipeline Interconnector2024-03-25T09:06:04Z<p>Abarrelfull: </p>
<hr />
<div>Summary Information<br />
<br />
* Source: Mellitah, Libya<br />
* Destination: Gela in Sicily, Italy<br />
* Ownership: ENI, NOC<br />
* Website: http://www.eni.com/ <br />
* Length: 520 kilometres ( miles) <br />
* Capacity: 8 billion cubic metres of natural gas per year <br />
* Status: Operating<br />
<br />
+++ Details<br />
* The Greenstream, developed by Saipem is part of the Western Libya Gas Project; it connects the [[Mellitah Gas Processing Plant]], on the Libyan coast, to Gela in Sicily, is 520 kilometres long, has a diameter of 32 inches and was laid at a depth which reach 1,127 metres. The depth and dip of the seabed where the pipeline was laid, the numerous cable crossings, the careful attention paid to the environment and the time constraints made Greenstream a high technology challenge. <br />
* The natural gas come from two fields: the [[Wafa Oil And Gas Field]], located 500 km south of the coast, close to the border with Algeria, and the offshore field of Bahr Essalam, 110 km off the Libyan coast. Eni is operator, with a 50% stake, in the joint development of the fields. The other joint partner is NOC. <br />
<br />
+++ Contractors<br />
* **Saipem:** Pipeline transportation and installation<br />
<br />
+++ History<br />
* 2002 - Saipem awarded contract for the laying of the pipeline<br />
<br />
+++ Links<br />
# [http://www.eni.com/en_IT/media/press-releases/2004/10/Eni__the_Western_Libya_Gas_Pro_07.10.2004.shtml Eni: the Western Libya Gas Project, the first project that enhances the value of the Libyan natural gas through export and trading in Europe, gets underway]<br />
# [[Saipem Pipeline References]]<br />
# [http://killajoules.wikidot.com/blog:1286 Paolo Scaroni meets with Libyan NTC in Tripoli]<br />
# [http://killajoules.wikidot.com/blog:1423 NOC and Eni restart Greenstream pipeline] <br />
# [http://killajoules.wikidot.com/archive:saipem-awarded-two-contracts-offshore-libya-totallin Saipem awarded two contracts offshore Libya totalling approximately Euro 685 million]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Tyra_Oil_and_Gas_Field&diff=73489Tyra Oil and Gas Field2024-03-22T10:30:22Z<p>Abarrelfull: </p>
<hr />
<div>=== Summary Information ===<br />
* Operator: TotalEnergies<br />
* Country: Denmark <br />
* Location: North Sea<br />
* Production start: 1984<br />
* Partners: Blue Nord<br />
* Type: Oil / Gas<br />
* Estimated Reserves: <br />
* Production Volume:<br />
<br />
=== Description ===<br />
* The Tyra Field installations comprise two platform complexes, Tyra West (TW) and Tyra East (TE).<br />
* Tyra West consists of two wellhead platforms, TWB and TWC, one processing and accommodation platform, TWA, and one gas flare stack, TWD, as well as a bridge module installed at TWB and supported by a four-legged jacket, TWE.<br />
* The Tyra West processing facilities are used to pre-process oil and condensate production from the wells at Tyra West. Moreover, the Tyra West complex houses gasprocessing facilities and facilities for the injection and/or export of gas as well as processing facilities for the water produced. Tyra West receives part of the gas produced at [[Halfdan Oil and Gas Field | Halfdan]] and [[Valdemar Oil Field | Valdemar]].<br />
* Tyra East consists of two wellhead platforms, TEB and TEC, one processing and accommodation platform, TEA, one gas flare stack, TED, and one riser platform, TEE, as well as a bridge module supported by a STAR jacket, TEF.<br />
* Tyra East receives production from the satellite fields, Valdemar, Roar, Svend, Tyra Southeast and Harald/Lulita, as well as gas production from Gorm, Dan and parts of Halfdan D. The Tyra East complex includes facilities for the final processing of gas, oil, condensate and water. Treated production water from the whole of the Tyra Field is discharged into the sea.<br />
* The two platform complexes in the Tyra Field are interconnected by pipelines in order to yield the maximum operational flexibility and security of supply. Oil and condensate production from the Tyra Field and its satellite fields is transported ashore via Gorm E. The bulk of gas produced is transported from TEE at Tyra East to shore and the rest is transported from TWE at Tyra West to the [[Netra Nogat Pipeline System]].<br />
* Tyra East has accommodation facilities for 96 persons, while there are accommodation facilities for 80 persons at Tyra West.<br />
==== Tyra Redevelopment Project ====<br />
* The scope of the project includes removing old facilities, modifying existing ones, and installing new features. <br />
* The 2 existing process and accommodation platforms will be replaced by 1 new process platform and 1 new accommodation platform. <br />
* The 4 wellhead platforms and 2 riser platforms will have their jackets extended by 13 meters and the current topsides will be replaced.<br />
<br />
=== Contractors ===<br />
* '''HSM Offshore:''' Tyra West Upper Pipe Bridge<br />
* '''Heerema Marine Contractors:''' Installation of Tyra East B & C and Tyra West B & C, Tyra West A, C & D, Tyra TCP A and Tyra East D<br />
* '''FoundOcean:''' Grouting for Tyra East (B, C & E), Tyra East B & C and Tyra West B & C, Tyra West A, C & D, Tyra TCP A and Tyra East D<br />
<br />
==== Tyra Redevelopment Project ====<br />
* McDermott: Tyra East G (TEG) gas processing module<br />
* Dragados Offshore: Supply of jackets<br />
<br />
=== History ===<br />
* 1968 - Tyra Oil And Gas Field discovered<br />
* 1984 - First oil production<br />
* 2018 - Shell sold its stake<br />
* 2018 - Total became operator after acquiring Maersk<br />
* 2019 - Tyra is closed for redevelopment<br />
* 2020 - PGNIG agrees to buy 6.4 BCM of gas over 6 years<br />
* 2024 - Tyra restarted after the redevelopment. <br />
<br />
=== Geology ===<br />
* The Tyra Field is an anticline structure created by tectonic uplift. The accumulation consists of free gas containing condensate, overlying a thin oil zone. The reservoir is only slightly fractured.<br />
<br />
=== Links ===<br />
# [http://www.ens.dk/en-US/OilAndGas/FieldsandProduction/Documents/Denmarks%20producing%20fields%202011%20ENG.pdf Denmark, Producing Fields]<br />
# [[FoundOcean Subsea References]]<br />
# [[HSM Offshore Platform References]]<br />
# [https://abarrelfull.blogspot.com/2022/09/total-acquires-maersk-oil-for-745.html Total acquires Maersk Oil for $7.45 billion in a share and debt transaction]<br />
# [http://killajoules.wikidot.com/archive:shell-agrees-to-sell-upstream-interests-in-denmark-t Shell agrees to sell Upstream Interests in Denmark to Noreco for $1.9 billion]<br />
# [https://abarrelfull.blogspot.com/2022/09/pgnig-group-to-buy-danish-natural-gas.html PGNiG Group to buy Danish natural gas from Ørsted]<br />
# [https://a-barrel-full.blogspot.com/2022/09/mcdermott-completes-process-module-sail.html McDermott Completes Process Module Sail Away on Tyra Redevelopment Project]<br />
# [https://abarrelfull.blogspot.com/2023/04/tyra-jackets-installation-completed.html Tyra Jackets Installation Completed]<br />
# [https://a-barrel-full.blogspot.com/2024/03/bluenord-tyra-ii-production.html BlueNord: Tyra II Production Successfully Restarted]<br />
<br />
[[category:Field]]<br />
[[category:Denmark]]<br />
[[category:Total]]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Tyra_Oil_and_Gas_Field&diff=73488Tyra Oil and Gas Field2024-03-22T10:29:31Z<p>Abarrelfull: </p>
<hr />
<div>=== Summary Information ===<br />
* Operator: TotalEnergies<br />
* Country: Denmark <br />
* Location: North Sea<br />
* Production start: 1984<br />
* Partners: Blue Nord<br />
* Type: Oil / Gas<br />
* Estimated Reserves: <br />
* Production Volume:<br />
<br />
=== Description ===<br />
* The Tyra Field installations comprise two platform complexes, Tyra West (TW) and Tyra East (TE).<br />
* Tyra West consists of two wellhead platforms, TWB and TWC, one processing and accommodation platform, TWA, and one gas flare stack, TWD, as well as a bridge module installed at TWB and supported by a four-legged jacket, TWE.<br />
* The Tyra West processing facilities are used to pre-process oil and condensate production from the wells at Tyra West. Moreover, the Tyra West complex houses gasprocessing facilities and facilities for the injection and/or export of gas as well as processing facilities for the water produced. Tyra West receives part of the gas produced at [[Halfdan Oil and Gas Field | Halfdan]] and [[Valdemar Oil Field | Valdemar]].<br />
* Tyra East consists of two wellhead platforms, TEB and TEC, one processing and accommodation platform, TEA, one gas flare stack, TED, and one riser platform, TEE, as well as a bridge module supported by a STAR jacket, TEF.<br />
* Tyra East receives production from the satellite fields, Valdemar, Roar, Svend, Tyra Southeast and Harald/Lulita, as well as gas production from Gorm, Dan and parts of Halfdan D. The Tyra East complex includes facilities for the final processing of gas, oil, condensate and water. Treated production water from the whole of the Tyra Field is discharged into the sea.<br />
* The two platform complexes in the Tyra Field are interconnected by pipelines in order to yield the maximum operational flexibility and security of supply. Oil and condensate production from the Tyra Field and its satellite fields is transported ashore via Gorm E. The bulk of gas produced is transported from TEE at Tyra East to shore and the rest is transported from TWE at Tyra West to the [[Netra Nogat Pipeline System]].<br />
* Tyra East has accommodation facilities for 96 persons, while there are accommodation facilities for 80 persons at Tyra West.<br />
==== Tyra Redevelopment Project ====<br />
* The scope of the project includes removing old facilities, modifying existing ones, and installing new features. <br />
* The 2 existing process and accommodation platforms will be replaced by 1 new process platform and 1 new accommodation platform. <br />
* The 4 wellhead platforms and 2 riser platforms will have their jackets extended by 13 meters and the current topsides will be replaced.<br />
<br />
=== Contractors ===<br />
* **HSM Offshore:** Tyra West Upper Pipe Bridge<br />
* **Heerema Marine Contractors:** Installation of Tyra East B & C and Tyra West B & C, Tyra West A, C & D, Tyra TCP A and Tyra East D<br />
* **FoundOcean:** Grouting for Tyra East (B, C & E), Tyra East B & C and Tyra West B & C, Tyra West A, C & D, Tyra TCP A and Tyra East D<br />
==== Tyra Redevelopment Project ====<br />
* McDermott: Tyra East G (TEG) gas processing module<br />
* Dragados Offshore: Supply of jackets<br />
<br />
=== History ===<br />
* 1968 - Tyra Oil And Gas Field discovered<br />
* 1984 - First oil production<br />
* 2018 - Shell sold its stake<br />
* 2018 - Total became operator after acquiring Maersk<br />
* 2019 - Tyra is closed for redevelopment<br />
* 2020 - PGNIG agrees to buy 6.4 BCM of gas over 6 years<br />
* 2024 - Tyra restarted after the redevelopment. <br />
<br />
=== Geology ===<br />
* The Tyra Field is an anticline structure created by tectonic uplift. The accumulation consists of free gas containing condensate, overlying a thin oil zone. The reservoir is only slightly fractured.<br />
<br />
=== Links ===<br />
# [http://www.ens.dk/en-US/OilAndGas/FieldsandProduction/Documents/Denmarks%20producing%20fields%202011%20ENG.pdf Denmark, Producing Fields]<br />
# [[FoundOcean Subsea References]]<br />
# [[HSM Offshore Platform References]]<br />
# [https://abarrelfull.blogspot.com/2022/09/total-acquires-maersk-oil-for-745.html Total acquires Maersk Oil for $7.45 billion in a share and debt transaction]<br />
# [http://killajoules.wikidot.com/archive:shell-agrees-to-sell-upstream-interests-in-denmark-t Shell agrees to sell Upstream Interests in Denmark to Noreco for $1.9 billion]<br />
# [https://abarrelfull.blogspot.com/2022/09/pgnig-group-to-buy-danish-natural-gas.html PGNiG Group to buy Danish natural gas from Ørsted]<br />
# [https://a-barrel-full.blogspot.com/2022/09/mcdermott-completes-process-module-sail.html McDermott Completes Process Module Sail Away on Tyra Redevelopment Project]<br />
# [https://abarrelfull.blogspot.com/2023/04/tyra-jackets-installation-completed.html Tyra Jackets Installation Completed]<br />
# [https://a-barrel-full.blogspot.com/2024/03/bluenord-tyra-ii-production.html BlueNord: Tyra II Production Successfully Restarted]<br />
<br />
[[category:Field]]<br />
[[category:Denmark]]<br />
[[category:Total]]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Texas_LNG_Export_Terminal_Project&diff=73487Texas LNG Export Terminal Project2024-03-19T11:48:17Z<p>Abarrelfull: </p>
<hr />
<div>=== Summary Information ===<br />
<br />
* Ownership: Texas LNG<br />
* Website: https://txlng.com/<br />
* Location: Port of Brownsville in Brownsville, Texas <br />
* Capacity: 4.0 million tons/annum <br />
* Status: Planned<br />
<br />
=== Brief Description ===<br />
* Texas LNG will construct, own, and operate a Liquefied Natural Gas (LNG) facility to be constructed at the Port of Brownsville in Brownsville, Texas. Texas LNG will have a permitted capacity to produce 4 MTA (million tonnes per annum) Liquefied Natural Gas (LNG) from approximately 600 MMcf/d or 0.6 Bcf/d of feed gas sourced from the extensive US natural gas system. <br />
* The project will have two trains using the standard Air Products liquefaction technology producing 2 MTA each.<br />
<br />
=== Technical Details ===<br />
* Storage capacity:<br />
* Constructor: <br />
** Samsung Engineering, Technip Energies: Lead project contractor charged with project design and delivery <br />
* Licensor: Air Products<br />
<br />
=== Ongoing Projects/Project Status ===<br />
* Final Investment Decision (FID) for the development of the Texas LNG liquefaction project is expected in 2024<br />
* Commissioning is expected in [[LNG Terminals to be Completed in 2028 | 2028]]<br />
<br />
=== Suppliers / Customers ===<br />
* Suppliers: <br />
* Customers: <br />
** EQT - Tolling agreement for 0.5 mtpa, 15 years<br />
** Gunvor - 20-year LNG FOB sale and purchase agreement (“SPA”) for 0.5 MTPA of LNG<br />
<br />
=== History ===<br />
* 2015 - Texas LNG begun the US Government FERC pre-Filing process<br />
* 2017 - Non binding sales contracts signed with Asian buyers<br />
* 2019 - Final FERC Order authorizing construction and operation<br />
* 2022 - Technip Energies and Samsung Engineering Awarded Pre-FID Engineering Contract<br />
* 2024 - EQT and Ginvor signed tolling agreements for 0.5 mtpa each<br />
<br />
=== Other Information ===<br />
* -<br />
<br />
=== Links ===<br />
# [https://abarrelfull.blogspot.com/2022/01/texas-lng-executes-term-sheets.html Texas LNG Executes Term Sheets Exceeding 3 MTA With Asian LNG Buyers; Phase 2 Marketing Underway]<br />
# [https://abarrelfull.blogspot.com/2022/11/technip-energies-and-samsung.html Technip Energies and Samsung Engineering Awarded Pre-FID Contract, Form Joint Venture for Project Design and Delivery for Texas LNG in the USA]<br />
# [https://lng-news.blogspot.com/2024/01/eqt-announces-tolling-agreement-with.html EQT Announces Tolling Agreement with Texas LNG]<br />
# [https://lng-news.blogspot.com/2024/03/glenfarne-energy-transitions-texas-lng.html Glenfarne Energy Transition’s Texas LNG Announces LNG Offtake Agreement with Gunvor Group]<br />
<br />
[[category:LNG]]<br />
[[category:USA]]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Ruwais_LNG_Terminal_Project&diff=73486Ruwais LNG Terminal Project2024-03-18T18:11:45Z<p>Abarrelfull: </p>
<hr />
<div>=== Summary Information ===<br />
<br />
* Ownership: ADNOC<br />
* Website: https://www.adnoc.ae/<br />
* Wikipage: [[ADGAS Das Island LNG Terminal]]<br />
* Location: Al Ruwais Industrial City, Al Dhafrah, Abu Dhabi<br />
* Capacity: million tons/annum <br />
* Status: Planned<br />
<br />
=== Brief Description ===<br />
* The Ruwais LNG project consists of two 4.8 million metric tons per annum (mtpa) natural gas liquefaction trains with a total capacity of 9.6 mtpa of LNG. <br />
<br />
=== Technical Details ===<br />
* Storage capacity:<br />
* Constructor:<br />
** '''Baker Hughes:''' Provision two electric liquefaction systems<br />
** '''Technip Energies, JGC Corporation and National Petroleum Construction Company:''' EPC contract<br />
* Licensor:<br />
<br />
=== Ongoing Projects/Project Status ===<br />
* Commissioning is expected in [[LNG Terminal Projects to be Completed in 2028 | 2028]]<br />
<br />
=== Suppliers / Customers ===<br />
* Suppliers: Gas will be supplied from a number of projects including the [[Ghasha and Hail Sour Gas Fields]]<br />
* Customers: <br />
** ENN: 1 million tons per year<br />
** SEFE: 1 million tons per year<br />
<br />
=== History ===<br />
* 2024 - Notice to proceeed for EPC contractors<br />
* 2024 - HOA signed to supply SEFE<br />
<br />
=== Other Information ===<br />
* -<br />
<br />
=== Links ===<br />
# [https://lng-news.blogspot.com/2023/10/baker-hughes-announces-milestone.html Baker Hughes Announces Milestone Electric-LNG Award for ADNOC Ruwais LNG Export Terminal]<br />
# [https://lng-news.blogspot.com/2024/03/adnoc-issues-early-epc-award-for-ruwais.html ADNOC Issues Early EPC Award for Ruwais LNG Project]<br />
# [https://lng-news.blogspot.com/2024/03/adnoc-signs-second-long-term-heads-of.html ADNOC Signs Second Long-Term Heads of Agreement for Ruwais LNG Project]<br />
<br />
[[category:LNG]]<br />
[[category:UAE]]<br />
[[category:ADNOC]]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Obaiyed_Gas_Processing_Plant&diff=73485Obaiyed Gas Processing Plant2024-03-14T17:27:06Z<p>Abarrelfull: </p>
<hr />
<div>=== Summary Information ===<br />
<br />
* Ownership: Shell<br />
* Website: <br />
* Location: Egypt<br />
* Capacity: <br />
<br />
=== Brief Description ===<br />
* -<br />
<br />
=== Related Oil and Gas Fields ===<br />
* <br />
<br />
=== Ongoing Projects ===<br />
* -<br />
<br />
=== Other Information ===<br />
* -<br />
<br />
=== History ===<br />
* 2006 - ENPPI awarded upgrade project<br />
<br />
=== Links ===<br />
# [[ENPPI Gas Processing References]]<br />
<br />
[[category:Processing]]<br />
[[category:Egypt]]<br />
[[category:Shell]]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=ENPPI_Gas_Processing_References&diff=73484ENPPI Gas Processing References2024-03-14T17:26:42Z<p>Abarrelfull: </p>
<hr />
<div>Assil & Karam Gas Development Project <br />
<br />
<br />
Client: Client: Badr Petroleum Company (Bapetco) <br />
Project Description <br />
The project aims to the Installation of CO2 removal Plant, utility facilities to support CO2 REMOVAL PLANT, 29KM P/L, Gas turbine generator, Air cooler,2 Separators, Flare Package. <br />
Contract Type <br />
Professional Services & Construction Lump-sum, Material Disbursable – EPC Turnkey. <br />
Scope of Services <br />
Detailed engineering, material supply, construction, commissioning & start-up <br />
<br />
# [[West Harbor Gas Processing Plant]]]<br />
#* West Harbor Expansion Project<br />
#* Client: Pharaonic Petroleum Company (PhPC)<br />
#* Project Description: <br />
#** The project aims to expand West Harbor facility, which is currently processing 280 MMSCFD from Ha’py and 265 MMSCFD from Taurt fields; by providing an additional HP stage Compression Train and Expand the plant design capacity to 585 MMSCFD<br />
#** Contract Type: EPC LSTK (Enppi Main Contractor)<br />
#** Scope of Services: Engineering, Material Supply, Construction, Commissioning and Start-up and Overall Management <br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Phase VII Main Compression Onshore Project <br />
<br />
Client: Burullus Gas Company (Burullus) <br />
Project Description <br />
The project aims to the installation of a new 5x25% gas turbine driven compression trains, for Burullus Gas Company (a joint venture with BG), with a capacity of 642 Million Standard Cubic Feet per day in the <br />
7th phase of Idku Hub plant, to accommodate the pressure declination of the plant inlet pressure from 58 to 30 bar gauge. <br />
It also includes a new Finger type slug catcher, High Pressure Separators and all supporting utilities. <br />
Contract Type <br />
EPC main contractor – Lump-sum turnkey <br />
Scope of Services <br />
Basic & detailed engineering, Project Management, material supply, construction, commissioning & start-up <br />
<br />
Yanbu Gas Plant Expansion 2006 / 2009 <br />
<br />
Client: Saudi Aramco <br />
Project Description <br />
The project aims to expand Yanbu NGL plant capacity from 390 to 585 MBOD. The work scope includes 195 MBOD de-Ethanizer with ancillaries and propane, refrigeration system, feed to the existing de-Propanizer and de-Butanizer columns, construction of substation with process interface room and expansion of DCS and ESD systems. <br />
Contract Type <br />
EPC main contractor – Lump-sum turnkey <br />
Scope of Services <br />
Detailed engineering, material supply, construction, commissioning & start-up <br />
<br />
<br />
<br />
Extraction and Compression Project <br />
<br />
Client: Petróleos de Venezuela, S.A. (PDVSA) <br />
Project Description <br />
The project aims to install a new NGL extraction plant in San Joaquin with a processing capacity of 1000 MMSCFD of natural gas. Contract Type <br />
Lump-sum for professional services & material supply cost plus <br />
Scope of Services <br />
Basic & detailed engineering & procurement services <br />
<br />
<br />
<br />
PAGMI Project Phase I & II Gas conditioning for Domestic Market <br />
<br />
Client: Petróleos de Venezuela, S.A. (PDVSA) <br />
Project Description <br />
Treating & Conditioning of gas produced from the offshore area in Northeastern Venezuela to be used in the domestic market in the PDVSA Complex, located in Güİria, Estado Sucre – Venezuela. <br />
Phase I: Conditioning of 600 MMSCFD from Dragon field (mainly Methane saturated with water), molecular sieve dehydration package and all required utilities to accomplish the domestic market requirements. <br />
Phase II: Treatment of 1000 MMSCFD gas & 20197 STD bpd condensate. There will be an additional dehydration module (module B) parallel to module A in PAGMI phase I with a capacity of 600 MMSCFD with different outlet water content. <br />
Contract Type <br />
EPCM – Lump-sum for professional services, material supply cost plus and unit rates for construction works Scope of Services <br />
Basic engineering review, detailed engineering and procurement services for long lead equipment, construction management and overall management for phase I. Conceptual engineering and basic and detailed engineering for phase II <br />
<br />
# [[Khursaniyah Gas Processing Plant]]<br />
#* Khursaniyah Gas Plant 2005 / 2006<br />
#* Client: Saudi Aramco / Bechtel <br />
#* Project Description: <br />
#** The Khursaniyah gas plant includes two gas-conditioning trains, ethane and natural gas liquids recovery units process 1000 MMSCFD of natural gas, produce 550 MMSCFD sales gas, 240,000 BL/D ethane / natural gas liquids, and 1,800 metric tons / day sulfur. <br />
#** The complex will process natural gas from three onshore fields in the eastern province: Abu Hadriya, Fadhili, and Khursaniyah. <br />
#** Contract Type: Professional services - reimbursable basis<br />
#** Scope of Services: Engineering services (main contractor – Bechtel) <br />
<br />
<br />
Ethane Recovery Project <br />
<br />
Client: Petróleos de Venezuela, S.A. (PDVSA) <br />
Project Description <br />
Installation of 2200 MMSCFD gas sweetening plant to completely remove the CO2 / H2S and CO2 dehydration for the natural gas upstream. The extraction facilities in ANACO and the dehydrated CO2 (200 MMSCFD) will be used for well gas lift, in addition to retrofit of the San Joaquin extraction facilities Trains A & B to achieve 98 % ethane recovery. The scope includes provision of molecular sieve dehydration package along with its regeneration <br />
(H2O plus CO2 200 MMSCFD – well gas lift.) <br />
Contract Type <br />
Lump sum for professional services <br />
Scope of Services <br />
Basic & detailed engineering for sweetening package (ISBL), detailed engineering for C2 extraction unit (ISBL) and overall project management & coordination <br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Fractionation Capacity Increase at Jose (ACFJ) Project <br />
<br />
Client: Petróleos de Venezuela, S.A. (PDVSA) <br />
Project Description <br />
Development of new facilities to process the increase of NGL capacity to 50000 BPD in order to cover the requirements of the 1st phase of NGL production increase. Each fractionation train will be designed to produce propane, ISO-butane, n-butane, pentanes, gasoline, and heavy ends. <br />
Contract Type <br />
Lump sum for professional services / material supply cost plus Scope of Services <br />
Conceptual design, basic & detailed engineering, procurement services and construction supervision <br />
<br />
<br />
# [[Al Khafji Oil Field]]<br />
#* Al-Khafji Field Development – Phase 1 2006 / 2010 <br />
#* Client: Al-Khafji Joint Operations (KJO) <br />
#* Project Description <br />
#** The field development for Khafji has been developed to maintain the maximum sustainable capacity of 300,000 Barrel Oil per Day and production of 125 Million Standard Cubic Feet Per Day of Associated gases, as well as, 50 Million Standard Cubic Feet Per Day gas lift, by installation of 6 new platforms, 8500 tons total structure weight and modification of 9 existing platforms, in addition to subsea pipelines with a total length of 110 kilometer sizing 24 inches, 28 inches, 36 inches and 42 inches and laying of 59 km subsea cables. <br />
#** Contract Type - EPC LSTK – consortium <br />
#** Scope of Services - Engineering, material supply, supervision of onshore structure fabrication & offshore laying/installation, overall management, consortium leader and commissioning & start-up <br />
# [[Obaiyed Gas Processing Plant]]<br />
#* Obayied Pre-Compression Project 2006 / 2009 <br />
#* Client: Badr Petroleum Company (BAPETCO) <br />
#* Project Description <br />
#** The project aims to restore Obayied Gas Plant (OGP) compression capacity by 420 MMSCFD through the installation of 2x50% compression train facilities to upgrade OGP pressure from 25 to 86 barg. <br />
#* Contract Type <br />
#** EPC turnkey – Lump-sum for professional services and construction works and disbursable for material supply <br />
#* Scope of Services <br />
#** Detailed engineering, procurement, construction supervision, commissioning & start-up assistance and overall project management <br />
# [[Sapphire Gas Field]]<br />
#* Sapphire Gas Development Project - 2003 / 2005 <br />
#* Client: Burullus Gas Company (Burullus) <br />
#* Project Description <br />
#** Extension to the onshore existing Scarab/Saffron and Simian/Sienna facility to treat 665 MMSCFD of natural gas produced from Sapphire offshore deepwater fields to feed the onshore Egyptian LNG Plant. <br />
#* Contract Type <br />
#** EPC Lump-sum turnkey – consortium <br />
#* Scope of Services <br />
#** Consortium leader, overall Project management, basic & detailed engineering, procurement services, construction supervision, commissioning & start-up assistance <br />
# [[Simian Sienna Gas Field]]<br />
#* Simian / Sienna Gas Development Project 2003 / 2005 <br />
#* Client: Burullus Gas Company (Burullus) <br />
#* Project Description <br />
#** Extension to the onshore existing Scarab/Saffron facility to treat 665 MMSCFD of natural gas produced from Simian / Sienna offshore deep water fields to feed the onshore Egyptian LNG Plant. <br />
#* Contract Type <br />
#** EPC Lump-sum turnkey – consortium <br />
#* Scope of Services <br />
#** Consortium leader, overall project management, basic & detailed engineering, procurement services, construction supervision, commissioning & start-up assistance <br />
<br />
Maximization of C2 / C3 from Western Desert Gas Fields <br />
<br />
Client: The Egyptian Natural Gas Company (GASCO) <br />
Project Description <br />
The project aims to maximize C2 & C3 recovery in the Western Desert Gas Complex and Amerya Liquefied Petroleum Gas (LPG) plant. The recovered C2 & C3 in Amerya LPG plant will be transferred to Western Desert Gas Complex through a 12 inch pipeline to be processed within Western Desert Gas Complex, where the storage and loading facilities exist. <br />
The project was executed in three phases; the 1st tends to reach a production of 600 million standard cubic feet per day, the 2nd stage tends to reach a production of 800 million standard cubic feet per day, and finally to reach by the 3rd phase a total production of 900 million standard cubic feet per day. <br />
Contract Type <br />
Lump-sum for professional services / material supply disbursable <br />
Scope of Services <br />
EPCM: techno-economic / feasibility study, basic and detailed engineering, procurement, construction supervision, commissioning & start up assistance & overall project management <br />
<br />
<br />
Western Desert Gas Complex <br />
<br />
Client: The Egyptian Natural Gas Company (GASCO) <br />
Project Description <br />
The project aims to the treatment of 550 million standard cubic feet per day of natural gas produced from the western desert (Obaiyed, Salam and Tarek), to produce ethane & propane mixture of downstream ethylene and polyethylene production, commercial propane, sales gas, Liquefied Petroleum Gas (LPG) and condensate. <br />
Contract Type <br />
Lump-sum for professional services and disbursable for material supply <br />
Scope of Services <br />
EPCM: techno-economic / feasibility study, basic and detailed engineering, procurement, construction supervision, commissioning & start-up assistance and overall project management <br />
<br />
<br />
<br />
NGL Project at Port Said 2001 / 2004 <br />
<br />
Client: United Gas Derivatives Company (UGDC) (BP / Eni / GASCO) <br />
Project Description <br />
Installation of processing facilities for 1100 MMSCFD feed of natural gases produced from El- Gamil & HA’PY fields to produce propane, LPG, and condensates (dehydration package : 1100 MMSCFD molecular sieve one train). <br />
Contract Type <br />
Lump-sum for professional services and <br />
material supply disbursable <br />
Scope of Services <br />
EPCM: basic engineering review, detailed engineering and procurement services, construction supervision, commissioning & start-up assistance and overall project management <br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Damietta Export Facilities 2001 / 2004 <br />
<br />
Client: United Gas Derivatives Company (UGDC) <br />
Project Description <br />
Installation of Marine export facilities – cryogenic tank capacity (30,000m3) for propane storage produced from Port Said NGL process facilities <br />
Contract Type <br />
EPC turnkey – consortium (Enppi / Tractebel) – lump-sum for professional services, cost plus fees for material supply and construction work <br />
Scope of Services <br />
FEED & detailed engineering, procurement, construction, commissioning, & start-up assistance <br />
<br />
Professional Services for Denise Platform 2006 / 2008 <br />
<br />
Client: Belayim Petroleum Company (Petrobel) <br />
Project Description <br />
Upgrade of TNW2 existing platform to suit Denise gas field production, transmit additional capacity to onshore via 61 KM 32” offshore pipeline and 1 KM 32” pipeline onshore and upgrade of El Gamil onshore facilities. <br />
Contract Type <br />
Lump sum for professional services <br />
Scope of Services <br />
Basic & detailed engineering and procurement services <br />
<br />
Semman Field Development 2006 / 2008 <br />
<br />
Client: Belayim Petroleum Company (Petrobel) <br />
Project Description <br />
Installation of new Semman platform (tripod plus deck) and laying of new 18” sea line from Semman to existing Darfeel platform with total length 20 Km. <br />
Contract Type <br />
Professional services reimbursable <br />
Scope of Services <br />
Basic engineering review, detailed engineering and procurement services <br />
<br />
Taurt Onshore Detailed Engineering 2006 / 2007 <br />
<br />
Client: Gulf of Suez Petroleum Company (GUPCO) <br />
Project Description <br />
GUPCO intends to develop Taurt field through a sub-sea production system (SPS) that consists of 7 sub-sea wells tied with a manifold with well testing capability. <br />
Contract Type <br />
Professional services reimbursable <br />
Scope of Services <br />
Detailed Engineering for onshore part of Taurt gas field development project <br />
<br />
<br />
Offshore North Sinai Field Development ONS 2005 / 2007 - NOSPCO <br />
<br />
Client: The Egyptian Natural Gas Company (GASCO) <br />
Project Description <br />
Development of Tao offshore gas field, 60 km north of Rommana producing 130 MMSCFD of gas. The development includes offshore production wells, production platform, submarine pipeline, onshore gas treatment plant and sales gas pipeline, in addition to gas dehydration. <br />
Contract Type <br />
Lump-Sum for professional services and disbursable for material supply <br />
Scope of Services <br />
Detailed engineering for offshore topside facilities and onshore gas central processing facility, overall procurement services except pipelines and offshore structure steel, and construction supervision <br />
<br />
<br />
Temsah – 4 Platform 2005 / 2007 <br />
<br />
Client: Belayim Petroleum Company (Petrobel) <br />
Project Description <br />
Installation of a new platform: 4 legs, 12-slot unmanned fixed offshore production platform at 85 m water depth and a capacity of 10 MMSCMD gas plus 3000 BPD condensate. <br />
Contract Type <br />
Lump-sum for professional services <br />
Scope of Services <br />
Basic & detailed engineering and procurement services <br />
<br />
Baltim-N Platform 2003 / 2005 <br />
<br />
Client: Belayim Petroleum Company (Petrobel ) <br />
Project Description <br />
The project aims to install 4 legs 9-slots tubular steel frame jacket, and a fixed offshore production platform with a capacity of 4.7 MMSCMD Gas. Gas & Condensate are directed to Baltim east existing platform through an 18" Pipeline. <br />
Contract Type <br />
Lump sum for professional services <br />
Scope of Services <br />
Basic & detailed engineering and procurement services <br />
# [[Barboni Gas Field]]<br />
#* Barboni Platform 2003 / 2005 <br />
#* Client: Belayim Petroleum Company (Petrobel) <br />
#* Project Description <br />
#** The project aims to install a new platform in 91 m Water Depth, Capacity of 4.4 MMSCMD. Gas is transmitted to Noras P.L.E.M. via 26” subsea pipeline. <br />
#* Contract Type <br />
#** Lump-sum for professional services <br />
#* Scope of Services <br />
#** Basic & detailed engineering and procurement services <br />
<br />
Rashid-2 Platform Project <br />
2003 / 2004 <br />
<br />
Client: Rashid Petroleum Company (RASHPETCO) <br />
Project Description <br />
The project aims to install 4 legged unmanned steel jacket platform located at Rosetta 49 m water depth with a capacity of 265 MMSCFD and weighing 450 tons. The gas is transmitted through a 24” subsea pipeline to the onshore terminal for final processing, along with 3 (1X70 mm2) XLPE 12/20 KV 61 KM submarine cable with optical <br />
fiber bundle Contract Type <br />
Lump-sum for professional services <br />
Scope of Services <br />
Basic & detailed engineering and procurement services <br />
<br />
<br />
Amerya LPG Recovery Plant <br />
<br />
Client: Egyptian General Petroleum Corporation (EGPC) <br />
Project Description <br />
The project aims to install LPG recovery plant with inlet gas production capacity of 300 MMSCFD producing 360 T/D of LPG. The scope includes dehydration: 330 MMSCFD molecular sieve one train. <br />
Contract Type <br />
Lump-sum for professional services and disbursable for material supply and construction work <br />
Scope of Services <br />
Basic & detailed engineering and procurement services, construction supervision, commissioning & start-up assistance <br />
<br />
<br />
<br />
<br />
<br />
Damietta LNG project 2002 / 2005 <br />
<br />
Client: SEGAS - Union Fenosa – M.W. Kellogg – UK <br />
Project Description <br />
The Project aims to install LNG plant at Damietta with production of 4.7 MMTY of LNG. <br />
Contract Type <br />
S/C. from M.W. Kellogg – Lump-sum for engineering services, reimbursable for procurement services & <br />
construction supervision <br />
Scope of Services <br />
Detailed engineering for fractionators unit, procurement services & construction supervision <br />
<br />
<br />
<br />
<br />
Egyptian LNG Project 2002 / 2005 <br />
<br />
Client: The Egyptian Liquefied Natural Gas Company <br />
(ELNG) Project Description <br />
The 1st LNG project in Egypt, two trains LNG plant with a capacity of 3.6 MMTY LNG productions each, located In Idku, Beheira - Northern Coast of Egypt. <br />
Contract Type <br />
S/C. Lump sum for engineering services – Bechtel Houston <br />
Scope of Services <br />
Detailed engineering for: Inlet treating unit, buildings for power generation, LNG storage, flares, marine facilities & utilities <br />
<br />
<br />
# [[Rosetta Gas Field]] <br />
#* Rosetta Gas Field Development - 1998 / 2000 <br />
#* Client: Rashid Petroleum Company (RASHPETCO) <br />
#* Project Description <br />
#** The project aims to install offshore production platform with a capacity of 275 MMSCFD. Gas is transmitted through a 24” gas subsea P/L 67 km to onshore terminal. <br />
#* Contract Type <br />
#** Lump sum for basic & detailed engineering reimbursable for construction supervision, commissioning and start-up assistance <br />
#* Scope of Services <br />
#** Detailed engineering, procurement services, construction supervision, commissioning & startup assistance <br />
<br />
<br />
Transgulf LPG Plant <br />
<br />
Client: Egyptian General Petroleum Corporation (EGPC) <br />
Project Description <br />
Inlet gas production 130 MMSCFD - produce 960 T/D of LPG. The scope includes provision of molecular sieve dehydration package along with its regeneration 130 MMSCFD one train. <br />
Contract Type <br />
EPC turnkey - Lump sum for professional services and disbursable for material supply and construction works <br />
Scope of Services <br />
Detailed engineering, procurement services, construction supervision, commissioning and start-up assistance <br />
<br />
<br />
<br />
Qantara Field Development <br />
<br />
Client: Qantara Petroleum Company (QPC) <br />
Project Description <br />
Development of Qantara field with a total capacity of 8 MMSCFD to produce: <br />
- 6 MMSCFD sales gas transferred to GASCO gas grid manifold through a 6” Pipeline 0.4 Km. <br />
- 1000 BBL/Day transferred to the petroleum pipeline company 12”condensate pipeline through 4” pipeline to the Suez Refinery. Contract Type <br />
EPC Lump-sum turnkey <br />
Scope of Services <br />
Detailed engineering, material supply, construction, commissioning & start-up <br />
Bed 2 Field Development <br />
Client: Egyptian General Petroleum Corporation (EGPC) <br />
Project Description <br />
Bed 2 gas field includes a gas gathering and gas liquid separation, one gas production train, 180 MMCFD, train contains production separator, glycol dehydration unit and inter field pipelines between Bed-2 & Bed-3, in addition to third gas train in Bed-3. The scope also includes provision of TEG Dehydration package along with its regeneration. <br />
Contract Type <br />
Reimbursable MHR's <br />
Scope of Services <br />
Basic and detailed engineering as subcontractor through COMPRIMO <br />
<br />
Bed 3 Field Development <br />
Client: Egyptian General Petroleum Corporation (EGPC) <br />
Project Description <br />
Two identical gas conditioning trains, 90 MMSCFD capacity each, trains contains production separator, glycol dehydration unit, turbo-expander, LTS and sales gas compressor, the third train was added due to increase Bed-2 supply increase, oil production trains produces oil at 3 different levels with total capacity of 40,000 BBLD. The scope includes provision of Triethylene Glycol Dehydration package along with its regeneration. <br />
Contract Type <br />
Reimbursable MHR's <br />
Scope of Services <br />
Basic engineering, (subcontract of detailed engineering – International Bechtel Incorporation IBI UK) in addition to procurement services <br />
<br />
Abu Sannan Condensate Recovery Plant 1988 / 1990 <br />
<br />
Client: General Petroleum Company (GPC) <br />
Project Description <br />
Gathering of 85 MMSCFD of natural gas from three gas fields (T, Y & Bed 1) through pipelines and delivered to a central processing area where condensate is recovered and spiked into GPC existing crude pipelines. The scope also includes provision of Tri-ethylene Glycol Dehydration package along with its regeneration. <br />
Contract Type <br />
Lump sum for professional services & disbursable for material supply and construction work reimbursable <br />
Scope of Services <br />
Detailed engineering, material supply, construction, commissioning & start-up <br />
<br />
<br />
<br />
Abu Madi LPG Recovery <br />
<br />
Client: Belayim Petroleum Company (Petrobel) <br />
Project Description <br />
The plant is designed to treat 260 MMSCFD produced at existing LTS units in order to recover LPG and condensate and deliver sales gas to users - dehydration: 260 MMSCFD Molecular Sieve. <br />
Contract Type <br />
Reimbursable maximum ceil man-hours <br />
Scope of Services <br />
Project management including basic and detailed engineering review and procurement services, in addition to partial detailed engineering and survey services as subcontractor to Snamprogetti</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Obaiyed_Gas_Processing_Plant&diff=73483Obaiyed Gas Processing Plant2024-03-14T17:25:28Z<p>Abarrelfull: Created page with "=== Summary Information === * Ownership: Shell * Website: * Location: Egypt * Capacity: === Brief Description === * - === Related Oil and Gas Fields === * === Ongoing P..."</p>
<hr />
<div>=== Summary Information ===<br />
<br />
* Ownership: Shell<br />
* Website: <br />
* Location: Egypt<br />
* Capacity: <br />
<br />
=== Brief Description ===<br />
* -<br />
<br />
=== Related Oil and Gas Fields ===<br />
* <br />
<br />
=== Ongoing Projects ===<br />
* -<br />
<br />
=== Other Information ===<br />
* -<br />
<br />
=== History ===<br />
* -<br />
<br />
=== Links ===<br />
# [[ENPPI Gas Processing References]]<br />
<br />
[[category:Processing]]<br />
[[category:Egypt]]<br />
[[category:Shell]]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Simian_Sienna_Gas_Field&diff=73482Simian Sienna Gas Field2024-03-14T17:18:49Z<p>Abarrelfull: </p>
<hr />
<div>=== Summary Information ===<br />
* Operator: Shell<br />
* Country: Egypt<br />
* Location: 120 kilometres offshore from Alexandria in the Mediterranean Sea<br />
* Production start: 2005<br />
* Partners:<br />
* Type: Gas<br />
* Estimated Reserves:<br />
* Production Volume:<br />
<br />
=== Description ===<br />
* The Shell operated Simian Sienna field is located in the West Delta Deep Marine (WDDM) Concession approximately 120 kilometres offshore from Alexandria in the Mediterranean Sea. <br />
* The offshore facilities consist of eight subsea wells tied in to the existing WDDM gas gathering network. In addition there is a shallow water control platform. <br />
* The onshore processing facilities form part of the Idku Gas Hub where the [[ELNG IDCO LNG Terminal | ELNG facilities]] are also located.<br />
<br />
=== Contractors ===<br />
* '''Intecsea:''' Concept Definition Studies and the subsequent FEED <br />
* '''Petrojet:''' Jacket, Deck, Heli-deck & Topside<br />
* '''Technip:''' Design, engineering, procurement, fabrication, installation, testing and commissioning of the Simian/Sienna subsea facilities<br />
<br />
=== History ===<br />
* 2003 - Technip awarded subsea contract<br />
* 2005 - First gas production<br />
* 2015 - Shell acquired BG Group and became the operator<br />
<br />
=== Geology ===<br />
* <br />
<br />
=== Links ===<br />
# [[ENPPI Gas Processing References]]<br />
# [[Jotun Platform References]]<br />
# [[Serimax Pipeline References]]<br />
# [http://killajoules.wikidot.com/archive:bg-announces-first-gas-from-simian-sienna-and-rosett BG announces first gas from Simian Sienna and Rosetta Phase Two in Egypt]<br />
# [http://www.intecsea.com/project_experience/project/default.asp?project_id=17 Intecsea, Burullus Gas Simian/Sienna]<br />
# [http://killajoules.wikidot.com/archive:contract-award-for-the-subsea-development-of-simian/ Contract award for the subsea development of Simian/Sienna gas field offshore Egypt]<br />
# [https://abarrelfull.blogspot.com/2023/09/recommended-cash-and-share-offer-for-bg.html Recommended cash and share offer for BG Group by Royal Dutch Shell]<br />
<br />
[[category:Field]]<br />
[[category:Egypt]]<br />
[[category:Shell]]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Simian_Sienna_Gas_Field&diff=73481Simian Sienna Gas Field2024-03-14T17:18:24Z<p>Abarrelfull: </p>
<hr />
<div>=== Summary Information ===<br />
* Operator: Shell<br />
* Country: Egypt<br />
* Location: 120 kilometres offshore from Alexandria in the Mediterranean Sea<br />
* Production start: 2005<br />
* Partners:<br />
* Type: Gas<br />
* Estimated Reserves:<br />
* Production Volume:<br />
<br />
=== Description ===<br />
* The Shell operated Simian Sienna field is located in the West Delta Deep Marine (WDDM) Concession approximately 120 kilometres offshore from Alexandria in the Mediterranean Sea. <br />
* The offshore facilities consist of eight subsea wells tied in to the existing WDDM gas gathering network. In addition there is a shallow water control platform. <br />
* The onshore processing facilities form part of the Idku Gas Hub where the [[ELNG IDCO LNG Terminal | ELNG facilities]] are also located.<br />
<br />
=== Contractors ===<br />
* **Intecsea:** Concept Definition Studies and the subsequent FEED <br />
* **Petrojet:** Jacket, Deck, Heli-deck & Topside<br />
* **Technip:** Design, engineering, procurement, fabrication, installation, testing and commissioning of the Simian/Sienna subsea facilities<br />
<br />
=== History ===<br />
* 2003 - Technip awarded subsea contract<br />
* 2005 - First gas production<br />
* 2015 - Shell acquired BG Group and became the operator<br />
<br />
=== Geology ===<br />
* <br />
<br />
=== Links ===<br />
# [[ENPPI Gas Processing References]]<br />
# [[Jotun Platform References]]<br />
# [[Serimax Pipeline References]]<br />
# [http://killajoules.wikidot.com/archive:bg-announces-first-gas-from-simian-sienna-and-rosett BG announces first gas from Simian Sienna and Rosetta Phase Two in Egypt]<br />
# [http://www.intecsea.com/project_experience/project/default.asp?project_id=17 Intecsea, Burullus Gas Simian/Sienna]<br />
# [http://killajoules.wikidot.com/archive:contract-award-for-the-subsea-development-of-simian/ Contract award for the subsea development of Simian/Sienna gas field offshore Egypt]<br />
# [https://abarrelfull.blogspot.com/2023/09/recommended-cash-and-share-offer-for-bg.html Recommended cash and share offer for BG Group by Royal Dutch Shell]<br />
<br />
[[category:Field]]<br />
[[category:Egypt]]<br />
[[category:Shell]]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Simian_Sienna_Gas_Field&diff=73480Simian Sienna Gas Field2024-03-14T17:17:21Z<p>Abarrelfull: </p>
<hr />
<div>=== Summary Information ===<br />
* Operator: Shell<br />
* Country: Egypt<br />
* Location: 120 kilometres offshore from Alexandria in the Mediterranean Sea<br />
* Production start: 2005<br />
* Partners:<br />
* Type: Gas<br />
* Estimated Reserves:<br />
* Production Volume:<br />
<br />
=== Description ===<br />
* The Shell operated Simian Sienna field is located in the West Delta Deep Marine (WDDM) Concession approximately 120 kilometres offshore from Alexandria in the Mediterranean Sea. <br />
* The offshore facilities consist of eight subsea wells tied in to the existing WDDM gas gathering network. In addition there is a shallow water control platform. <br />
* The onshore processing facilities form part of the Idku Gas Hub where the ELNG facilities are also located.<br />
<br />
=== Contractors ===<br />
* **Intecsea:** Concept Definition Studies and the subsequent FEED <br />
* **Petrojet:** Jacket, Deck, Heli-deck & Topside<br />
* **Technip:** Design, engineering, procurement, fabrication, installation, testing and commissioning of the Simian/Sienna subsea facilities<br />
<br />
=== History ===<br />
* 2003 - Technip awarded subsea contract<br />
* 2005 - First gas production<br />
* 2015 - Shell acquired BG Group and became the operator<br />
<br />
=== Geology ===<br />
* <br />
<br />
=== Links ===<br />
# [[ENPPI Gas Processing References]]<br />
# [[Jotun Platform References]]<br />
# [[Serimax Pipeline References]]<br />
# [http://killajoules.wikidot.com/archive:bg-announces-first-gas-from-simian-sienna-and-rosett BG announces first gas from Simian Sienna and Rosetta Phase Two in Egypt]<br />
# [http://www.intecsea.com/project_experience/project/default.asp?project_id=17 Intecsea, Burullus Gas Simian/Sienna]<br />
# [http://killajoules.wikidot.com/archive:contract-award-for-the-subsea-development-of-simian/ Contract award for the subsea development of Simian/Sienna gas field offshore Egypt]<br />
# [https://abarrelfull.blogspot.com/2023/09/recommended-cash-and-share-offer-for-bg.html Recommended cash and share offer for BG Group by Royal Dutch Shell]<br />
<br />
[[category:Field]]<br />
[[category:Egypt]]<br />
[[category:Shell]]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=ENPPI_Gas_Processing_References&diff=73479ENPPI Gas Processing References2024-03-14T17:16:13Z<p>Abarrelfull: </p>
<hr />
<div>Assil & Karam Gas Development Project <br />
<br />
<br />
Client: Client: Badr Petroleum Company (Bapetco) <br />
Project Description <br />
The project aims to the Installation of CO2 removal Plant, utility facilities to support CO2 REMOVAL PLANT, 29KM P/L, Gas turbine generator, Air cooler,2 Separators, Flare Package. <br />
Contract Type <br />
Professional Services & Construction Lump-sum, Material Disbursable – EPC Turnkey. <br />
Scope of Services <br />
Detailed engineering, material supply, construction, commissioning & start-up <br />
<br />
# [[West Harbor Gas Processing Plant]]]<br />
#* West Harbor Expansion Project<br />
#* Client: Pharaonic Petroleum Company (PhPC)<br />
#* Project Description: <br />
#** The project aims to expand West Harbor facility, which is currently processing 280 MMSCFD from Ha’py and 265 MMSCFD from Taurt fields; by providing an additional HP stage Compression Train and Expand the plant design capacity to 585 MMSCFD<br />
#** Contract Type: EPC LSTK (Enppi Main Contractor)<br />
#** Scope of Services: Engineering, Material Supply, Construction, Commissioning and Start-up and Overall Management <br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Phase VII Main Compression Onshore Project <br />
<br />
Client: Burullus Gas Company (Burullus) <br />
Project Description <br />
The project aims to the installation of a new 5x25% gas turbine driven compression trains, for Burullus Gas Company (a joint venture with BG), with a capacity of 642 Million Standard Cubic Feet per day in the <br />
7th phase of Idku Hub plant, to accommodate the pressure declination of the plant inlet pressure from 58 to 30 bar gauge. <br />
It also includes a new Finger type slug catcher, High Pressure Separators and all supporting utilities. <br />
Contract Type <br />
EPC main contractor – Lump-sum turnkey <br />
Scope of Services <br />
Basic & detailed engineering, Project Management, material supply, construction, commissioning & start-up <br />
<br />
Yanbu Gas Plant Expansion 2006 / 2009 <br />
<br />
Client: Saudi Aramco <br />
Project Description <br />
The project aims to expand Yanbu NGL plant capacity from 390 to 585 MBOD. The work scope includes 195 MBOD de-Ethanizer with ancillaries and propane, refrigeration system, feed to the existing de-Propanizer and de-Butanizer columns, construction of substation with process interface room and expansion of DCS and ESD systems. <br />
Contract Type <br />
EPC main contractor – Lump-sum turnkey <br />
Scope of Services <br />
Detailed engineering, material supply, construction, commissioning & start-up <br />
<br />
<br />
<br />
Extraction and Compression Project <br />
<br />
Client: Petróleos de Venezuela, S.A. (PDVSA) <br />
Project Description <br />
The project aims to install a new NGL extraction plant in San Joaquin with a processing capacity of 1000 MMSCFD of natural gas. Contract Type <br />
Lump-sum for professional services & material supply cost plus <br />
Scope of Services <br />
Basic & detailed engineering & procurement services <br />
<br />
<br />
<br />
PAGMI Project Phase I & II Gas conditioning for Domestic Market <br />
<br />
Client: Petróleos de Venezuela, S.A. (PDVSA) <br />
Project Description <br />
Treating & Conditioning of gas produced from the offshore area in Northeastern Venezuela to be used in the domestic market in the PDVSA Complex, located in Güİria, Estado Sucre – Venezuela. <br />
Phase I: Conditioning of 600 MMSCFD from Dragon field (mainly Methane saturated with water), molecular sieve dehydration package and all required utilities to accomplish the domestic market requirements. <br />
Phase II: Treatment of 1000 MMSCFD gas & 20197 STD bpd condensate. There will be an additional dehydration module (module B) parallel to module A in PAGMI phase I with a capacity of 600 MMSCFD with different outlet water content. <br />
Contract Type <br />
EPCM – Lump-sum for professional services, material supply cost plus and unit rates for construction works Scope of Services <br />
Basic engineering review, detailed engineering and procurement services for long lead equipment, construction management and overall management for phase I. Conceptual engineering and basic and detailed engineering for phase II <br />
<br />
# [[Khursaniyah Gas Processing Plant]]<br />
#* Khursaniyah Gas Plant 2005 / 2006<br />
#* Client: Saudi Aramco / Bechtel <br />
#* Project Description: <br />
#** The Khursaniyah gas plant includes two gas-conditioning trains, ethane and natural gas liquids recovery units process 1000 MMSCFD of natural gas, produce 550 MMSCFD sales gas, 240,000 BL/D ethane / natural gas liquids, and 1,800 metric tons / day sulfur. <br />
#** The complex will process natural gas from three onshore fields in the eastern province: Abu Hadriya, Fadhili, and Khursaniyah. <br />
#** Contract Type: Professional services - reimbursable basis<br />
#** Scope of Services: Engineering services (main contractor – Bechtel) <br />
<br />
<br />
Ethane Recovery Project <br />
<br />
Client: Petróleos de Venezuela, S.A. (PDVSA) <br />
Project Description <br />
Installation of 2200 MMSCFD gas sweetening plant to completely remove the CO2 / H2S and CO2 dehydration for the natural gas upstream. The extraction facilities in ANACO and the dehydrated CO2 (200 MMSCFD) will be used for well gas lift, in addition to retrofit of the San Joaquin extraction facilities Trains A & B to achieve 98 % ethane recovery. The scope includes provision of molecular sieve dehydration package along with its regeneration <br />
(H2O plus CO2 200 MMSCFD – well gas lift.) <br />
Contract Type <br />
Lump sum for professional services <br />
Scope of Services <br />
Basic & detailed engineering for sweetening package (ISBL), detailed engineering for C2 extraction unit (ISBL) and overall project management & coordination <br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Fractionation Capacity Increase at Jose (ACFJ) Project <br />
<br />
Client: Petróleos de Venezuela, S.A. (PDVSA) <br />
Project Description <br />
Development of new facilities to process the increase of NGL capacity to 50000 BPD in order to cover the requirements of the 1st phase of NGL production increase. Each fractionation train will be designed to produce propane, ISO-butane, n-butane, pentanes, gasoline, and heavy ends. <br />
Contract Type <br />
Lump sum for professional services / material supply cost plus Scope of Services <br />
Conceptual design, basic & detailed engineering, procurement services and construction supervision <br />
<br />
<br />
# [[Al Khafji Oil Field]]<br />
#* Al-Khafji Field Development – Phase 1 2006 / 2010 <br />
#* Client: Al-Khafji Joint Operations (KJO) <br />
#* Project Description <br />
#** The field development for Khafji has been developed to maintain the maximum sustainable capacity of 300,000 Barrel Oil per Day and production of 125 Million Standard Cubic Feet Per Day of Associated gases, as well as, 50 Million Standard Cubic Feet Per Day gas lift, by installation of 6 new platforms, 8500 tons total structure weight and modification of 9 existing platforms, in addition to subsea pipelines with a total length of 110 kilometer sizing 24 inches, 28 inches, 36 inches and 42 inches and laying of 59 km subsea cables. <br />
#** Contract Type - EPC LSTK – consortium <br />
#** Scope of Services - Engineering, material supply, supervision of onshore structure fabrication & offshore laying/installation, overall management, consortium leader and commissioning & start-up <br />
<br />
<br />
<br />
Obayied Pre-Compression Project 2006 / 2009 <br />
<br />
Client: Badr Petroleum Company (BAPETCO) <br />
Project Description <br />
The project aims to restore Obayied Gas Plant (OGP) compression capacity by 420 MMSCFD through the installation of 2x50% compression train facilities to upgrade OGP pressure from 25 to 86 barg. <br />
Contract Type <br />
EPC turnkey – Lump-sum for professional services and construction works and <br />
disbursable for material supply <br />
Scope of Services <br />
Detailed engineering, procurement, construction supervision, commissioning & start-up assistance and overall project management <br />
<br />
<br />
# [[Sapphire Gas Field]]<br />
#* Sapphire Gas Development Project - 2003 / 2005 <br />
#* Client: Burullus Gas Company (Burullus) <br />
#* Project Description <br />
#** Extension to the onshore existing Scarab/Saffron and Simian/Sienna facility to treat 665 MMSCFD of natural gas produced from Sapphire offshore deepwater fields to feed the onshore Egyptian LNG Plant. <br />
#* Contract Type <br />
#** EPC Lump-sum turnkey – consortium <br />
#* Scope of Services <br />
#** Consortium leader, overall Project management, basic & detailed engineering, procurement services, construction supervision, commissioning & start-up assistance <br />
# [[Simian Sienna Gas Field]]<br />
#* Simian / Sienna Gas Development Project 2003 / 2005 <br />
#* Client: Burullus Gas Company (Burullus) <br />
#* Project Description <br />
#** Extension to the onshore existing Scarab/Saffron facility to treat 665 MMSCFD of natural gas produced from Simian / Sienna offshore deep water fields to feed the onshore Egyptian LNG Plant. <br />
#* Contract Type <br />
#** EPC Lump-sum turnkey – consortium <br />
#* Scope of Services <br />
#** Consortium leader, overall project management, basic & detailed engineering, procurement services, construction supervision, commissioning & start-up assistance <br />
<br />
Maximization of C2 / C3 from Western Desert Gas Fields <br />
<br />
Client: The Egyptian Natural Gas Company (GASCO) <br />
Project Description <br />
The project aims to maximize C2 & C3 recovery in the Western Desert Gas Complex and Amerya Liquefied Petroleum Gas (LPG) plant. The recovered C2 & C3 in Amerya LPG plant will be transferred to Western Desert Gas Complex through a 12 inch pipeline to be processed within Western Desert Gas Complex, where the storage and loading facilities exist. <br />
The project was executed in three phases; the 1st tends to reach a production of 600 million standard cubic feet per day, the 2nd stage tends to reach a production of 800 million standard cubic feet per day, and finally to reach by the 3rd phase a total production of 900 million standard cubic feet per day. <br />
Contract Type <br />
Lump-sum for professional services / material supply disbursable <br />
Scope of Services <br />
EPCM: techno-economic / feasibility study, basic and detailed engineering, procurement, construction supervision, commissioning & start up assistance & overall project management <br />
<br />
<br />
Western Desert Gas Complex <br />
<br />
Client: The Egyptian Natural Gas Company (GASCO) <br />
Project Description <br />
The project aims to the treatment of 550 million standard cubic feet per day of natural gas produced from the western desert (Obaiyed, Salam and Tarek), to produce ethane & propane mixture of downstream ethylene and polyethylene production, commercial propane, sales gas, Liquefied Petroleum Gas (LPG) and condensate. <br />
Contract Type <br />
Lump-sum for professional services and disbursable for material supply <br />
Scope of Services <br />
EPCM: techno-economic / feasibility study, basic and detailed engineering, procurement, construction supervision, commissioning & start-up assistance and overall project management <br />
<br />
<br />
<br />
NGL Project at Port Said 2001 / 2004 <br />
<br />
Client: United Gas Derivatives Company (UGDC) (BP / Eni / GASCO) <br />
Project Description <br />
Installation of processing facilities for 1100 MMSCFD feed of natural gases produced from El- Gamil & HA’PY fields to produce propane, LPG, and condensates (dehydration package : 1100 MMSCFD molecular sieve one train). <br />
Contract Type <br />
Lump-sum for professional services and <br />
material supply disbursable <br />
Scope of Services <br />
EPCM: basic engineering review, detailed engineering and procurement services, construction supervision, commissioning & start-up assistance and overall project management <br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Damietta Export Facilities 2001 / 2004 <br />
<br />
Client: United Gas Derivatives Company (UGDC) <br />
Project Description <br />
Installation of Marine export facilities – cryogenic tank capacity (30,000m3) for propane storage produced from Port Said NGL process facilities <br />
Contract Type <br />
EPC turnkey – consortium (Enppi / Tractebel) – lump-sum for professional services, cost plus fees for material supply and construction work <br />
Scope of Services <br />
FEED & detailed engineering, procurement, construction, commissioning, & start-up assistance <br />
<br />
Professional Services for Denise Platform 2006 / 2008 <br />
<br />
Client: Belayim Petroleum Company (Petrobel) <br />
Project Description <br />
Upgrade of TNW2 existing platform to suit Denise gas field production, transmit additional capacity to onshore via 61 KM 32” offshore pipeline and 1 KM 32” pipeline onshore and upgrade of El Gamil onshore facilities. <br />
Contract Type <br />
Lump sum for professional services <br />
Scope of Services <br />
Basic & detailed engineering and procurement services <br />
<br />
Semman Field Development 2006 / 2008 <br />
<br />
Client: Belayim Petroleum Company (Petrobel) <br />
Project Description <br />
Installation of new Semman platform (tripod plus deck) and laying of new 18” sea line from Semman to existing Darfeel platform with total length 20 Km. <br />
Contract Type <br />
Professional services reimbursable <br />
Scope of Services <br />
Basic engineering review, detailed engineering and procurement services <br />
<br />
Taurt Onshore Detailed Engineering 2006 / 2007 <br />
<br />
Client: Gulf of Suez Petroleum Company (GUPCO) <br />
Project Description <br />
GUPCO intends to develop Taurt field through a sub-sea production system (SPS) that consists of 7 sub-sea wells tied with a manifold with well testing capability. <br />
Contract Type <br />
Professional services reimbursable <br />
Scope of Services <br />
Detailed Engineering for onshore part of Taurt gas field development project <br />
<br />
<br />
Offshore North Sinai Field Development ONS 2005 / 2007 - NOSPCO <br />
<br />
Client: The Egyptian Natural Gas Company (GASCO) <br />
Project Description <br />
Development of Tao offshore gas field, 60 km north of Rommana producing 130 MMSCFD of gas. The development includes offshore production wells, production platform, submarine pipeline, onshore gas treatment plant and sales gas pipeline, in addition to gas dehydration. <br />
Contract Type <br />
Lump-Sum for professional services and disbursable for material supply <br />
Scope of Services <br />
Detailed engineering for offshore topside facilities and onshore gas central processing facility, overall procurement services except pipelines and offshore structure steel, and construction supervision <br />
<br />
<br />
Temsah – 4 Platform 2005 / 2007 <br />
<br />
Client: Belayim Petroleum Company (Petrobel) <br />
Project Description <br />
Installation of a new platform: 4 legs, 12-slot unmanned fixed offshore production platform at 85 m water depth and a capacity of 10 MMSCMD gas plus 3000 BPD condensate. <br />
Contract Type <br />
Lump-sum for professional services <br />
Scope of Services <br />
Basic & detailed engineering and procurement services <br />
<br />
Baltim-N Platform 2003 / 2005 <br />
<br />
Client: Belayim Petroleum Company (Petrobel ) <br />
Project Description <br />
The project aims to install 4 legs 9-slots tubular steel frame jacket, and a fixed offshore production platform with a capacity of 4.7 MMSCMD Gas. Gas & Condensate are directed to Baltim east existing platform through an 18" Pipeline. <br />
Contract Type <br />
Lump sum for professional services <br />
Scope of Services <br />
Basic & detailed engineering and procurement services <br />
# [[Barboni Gas Field]]<br />
#* Barboni Platform 2003 / 2005 <br />
#* Client: Belayim Petroleum Company (Petrobel) <br />
#* Project Description <br />
#** The project aims to install a new platform in 91 m Water Depth, Capacity of 4.4 MMSCMD. Gas is transmitted to Noras P.L.E.M. via 26” subsea pipeline. <br />
#* Contract Type <br />
#** Lump-sum for professional services <br />
#* Scope of Services <br />
#** Basic & detailed engineering and procurement services <br />
<br />
Rashid-2 Platform Project <br />
2003 / 2004 <br />
<br />
Client: Rashid Petroleum Company (RASHPETCO) <br />
Project Description <br />
The project aims to install 4 legged unmanned steel jacket platform located at Rosetta 49 m water depth with a capacity of 265 MMSCFD and weighing 450 tons. The gas is transmitted through a 24” subsea pipeline to the onshore terminal for final processing, along with 3 (1X70 mm2) XLPE 12/20 KV 61 KM submarine cable with optical <br />
fiber bundle Contract Type <br />
Lump-sum for professional services <br />
Scope of Services <br />
Basic & detailed engineering and procurement services <br />
<br />
<br />
Amerya LPG Recovery Plant <br />
<br />
Client: Egyptian General Petroleum Corporation (EGPC) <br />
Project Description <br />
The project aims to install LPG recovery plant with inlet gas production capacity of 300 MMSCFD producing 360 T/D of LPG. The scope includes dehydration: 330 MMSCFD molecular sieve one train. <br />
Contract Type <br />
Lump-sum for professional services and disbursable for material supply and construction work <br />
Scope of Services <br />
Basic & detailed engineering and procurement services, construction supervision, commissioning & start-up assistance <br />
<br />
<br />
<br />
<br />
<br />
Damietta LNG project 2002 / 2005 <br />
<br />
Client: SEGAS - Union Fenosa – M.W. Kellogg – UK <br />
Project Description <br />
The Project aims to install LNG plant at Damietta with production of 4.7 MMTY of LNG. <br />
Contract Type <br />
S/C. from M.W. Kellogg – Lump-sum for engineering services, reimbursable for procurement services & <br />
construction supervision <br />
Scope of Services <br />
Detailed engineering for fractionators unit, procurement services & construction supervision <br />
<br />
<br />
<br />
<br />
Egyptian LNG Project 2002 / 2005 <br />
<br />
Client: The Egyptian Liquefied Natural Gas Company <br />
(ELNG) Project Description <br />
The 1st LNG project in Egypt, two trains LNG plant with a capacity of 3.6 MMTY LNG productions each, located In Idku, Beheira - Northern Coast of Egypt. <br />
Contract Type <br />
S/C. Lump sum for engineering services – Bechtel Houston <br />
Scope of Services <br />
Detailed engineering for: Inlet treating unit, buildings for power generation, LNG storage, flares, marine facilities & utilities <br />
<br />
<br />
# [[Rosetta Gas Field]] <br />
#* Rosetta Gas Field Development - 1998 / 2000 <br />
#* Client: Rashid Petroleum Company (RASHPETCO) <br />
#* Project Description <br />
#** The project aims to install offshore production platform with a capacity of 275 MMSCFD. Gas is transmitted through a 24” gas subsea P/L 67 km to onshore terminal. <br />
#* Contract Type <br />
#** Lump sum for basic & detailed engineering reimbursable for construction supervision, commissioning and start-up assistance <br />
#* Scope of Services <br />
#** Detailed engineering, procurement services, construction supervision, commissioning & startup assistance <br />
<br />
<br />
Transgulf LPG Plant <br />
<br />
Client: Egyptian General Petroleum Corporation (EGPC) <br />
Project Description <br />
Inlet gas production 130 MMSCFD - produce 960 T/D of LPG. The scope includes provision of molecular sieve dehydration package along with its regeneration 130 MMSCFD one train. <br />
Contract Type <br />
EPC turnkey - Lump sum for professional services and disbursable for material supply and construction works <br />
Scope of Services <br />
Detailed engineering, procurement services, construction supervision, commissioning and start-up assistance <br />
<br />
<br />
<br />
Qantara Field Development <br />
<br />
Client: Qantara Petroleum Company (QPC) <br />
Project Description <br />
Development of Qantara field with a total capacity of 8 MMSCFD to produce: <br />
- 6 MMSCFD sales gas transferred to GASCO gas grid manifold through a 6” Pipeline 0.4 Km. <br />
- 1000 BBL/Day transferred to the petroleum pipeline company 12”condensate pipeline through 4” pipeline to the Suez Refinery. Contract Type <br />
EPC Lump-sum turnkey <br />
Scope of Services <br />
Detailed engineering, material supply, construction, commissioning & start-up <br />
Bed 2 Field Development <br />
Client: Egyptian General Petroleum Corporation (EGPC) <br />
Project Description <br />
Bed 2 gas field includes a gas gathering and gas liquid separation, one gas production train, 180 MMCFD, train contains production separator, glycol dehydration unit and inter field pipelines between Bed-2 & Bed-3, in addition to third gas train in Bed-3. The scope also includes provision of TEG Dehydration package along with its regeneration. <br />
Contract Type <br />
Reimbursable MHR's <br />
Scope of Services <br />
Basic and detailed engineering as subcontractor through COMPRIMO <br />
<br />
Bed 3 Field Development <br />
Client: Egyptian General Petroleum Corporation (EGPC) <br />
Project Description <br />
Two identical gas conditioning trains, 90 MMSCFD capacity each, trains contains production separator, glycol dehydration unit, turbo-expander, LTS and sales gas compressor, the third train was added due to increase Bed-2 supply increase, oil production trains produces oil at 3 different levels with total capacity of 40,000 BBLD. The scope includes provision of Triethylene Glycol Dehydration package along with its regeneration. <br />
Contract Type <br />
Reimbursable MHR's <br />
Scope of Services <br />
Basic engineering, (subcontract of detailed engineering – International Bechtel Incorporation IBI UK) in addition to procurement services <br />
<br />
Abu Sannan Condensate Recovery Plant 1988 / 1990 <br />
<br />
Client: General Petroleum Company (GPC) <br />
Project Description <br />
Gathering of 85 MMSCFD of natural gas from three gas fields (T, Y & Bed 1) through pipelines and delivered to a central processing area where condensate is recovered and spiked into GPC existing crude pipelines. The scope also includes provision of Tri-ethylene Glycol Dehydration package along with its regeneration. <br />
Contract Type <br />
Lump sum for professional services & disbursable for material supply and construction work reimbursable <br />
Scope of Services <br />
Detailed engineering, material supply, construction, commissioning & start-up <br />
<br />
<br />
<br />
Abu Madi LPG Recovery <br />
<br />
Client: Belayim Petroleum Company (Petrobel) <br />
Project Description <br />
The plant is designed to treat 260 MMSCFD produced at existing LTS units in order to recover LPG and condensate and deliver sales gas to users - dehydration: 260 MMSCFD Molecular Sieve. <br />
Contract Type <br />
Reimbursable maximum ceil man-hours <br />
Scope of Services <br />
Project management including basic and detailed engineering review and procurement services, in addition to partial detailed engineering and survey services as subcontractor to Snamprogetti</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Rosetta_Gas_Field&diff=73478Rosetta Gas Field2024-03-14T17:13:23Z<p>Abarrelfull: </p>
<hr />
<div>=== Summary Information ===<br />
* Operator: Shell<br />
* Country: Egypt<br />
* Location: Mediterranean Sea, offshore Egypt<br />
* Production start: 2001<br />
* Partners: Shell, Edison<br />
* Type: Gas<br />
* Estimated Reserves:<br />
* Production Volume:<br />
<br />
=== Description ===<br />
* Located offshore in the Mediterranean Sea in 61 metres of water 48 kilometres northeast of Alexandria<br />
* Phase I included an offshore production platform with a capacity of 275 MMSCFD and a 67 km, 24” gas subsea pipeline running to onshore terminal<br />
* Phase 2 of the Rosetta Concession development consists of an unmanned minimum facilities wellhead platform tied back to the existing Rosetta platform<br />
<br />
=== Contractors ===<br />
* **Enppi:** Basic & detailed engineering, procurement services, construction supervision, commissioning & start-up assistance<br />
* **Seaway Heavy Lifting:** Installation of Rosetta Field Platform Jacket<br />
* **Tecon:** Feasibility study and conceptual design of one minimum facilities wellhead platform for phase 2<br />
* **Petrojet Marine:** Jacket, Heli-deck & Topside<br />
* **Aker Kvaerner:** Supply of five umbilicals to the Phase 3 development<br />
* **Saipem:** Rosetta Phase III Development Pipeline Installation<br />
* **Global Maritime:** Warranty surveyor for installation of flowlines, umbilicals and subsea manifolds - Phase II<br />
<br />
=== History ===<br />
* 1997 - First successful exploration well drilled<br />
* 2001 - First production<br />
* 2004 - BG Group acquires Shell's 40% stake<br />
* 2005 - Phase 2 production begins<br />
* 2006 - Aker Kvaerner wins Rosetta Phase 3 subsea umbilicals<br />
* 2008 - First gas from phase 3<br />
* 2015 - Shell acquired BG Group and became the operator<br />
<br />
=== Geology ===<br />
* <br />
<br />
=== Links ===<br />
# [[Aker Solutions Umbilical References]]<br />
# [[ENPPI Gas Processing References]]<br />
# [[ENPPI Offshore Platform References]]<br />
# [[Global Maritime Pipeline References]]<br />
# [[Jotun Platform References]]<br />
# [[Saipem Africa Pipeline References]]<br />
# [[Seaway Heavy Lifting Oil And Gas References]]<br />
# [http://killajoules.wikidot.com/archive:bg-exploration-production-announces-gas-discovery-in BG Exploration & Production announces gas discovery in Rosetta Concession, Offshore Egypt]<br />
# [http://killajoules.wikidot.com/archive:bg-group-completes-purchase-of-rosetta-stake-offshor BG Group completes purchase of Rosetta stake offshore Egypt]<br />
# [http://killajoules.wikidot.com/archive:bg-announces-first-gas-from-simian-sienna-and-rosett BG announces first gas from Simian Sienna and Rosetta Phase Two in Egypt]<br />
# [http://killajoules.wikidot.com/archive:aker-kvaerner-wins-rosetta-phase-3-subsea-umbilicals Aker Kvaerner wins Rosetta Phase 3 subsea umbilicals]<br />
# [http://killajoules.wikidot.com/blog:5788 New production for Egyptian domestic market to start following BG Egypt and BP Egypt agreement]<br />
# [https://abarrelfull.blogspot.com/2023/09/recommended-cash-and-share-offer-for-bg.html Recommended cash and share offer for BG Group by Royal Dutch Shell]<br />
<br />
[[category:Field]]<br />
[[category:Egypt]]<br />
[[category:Shell]]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=ENPPI_Gas_Processing_References&diff=73477ENPPI Gas Processing References2024-03-14T17:12:45Z<p>Abarrelfull: </p>
<hr />
<div>Assil & Karam Gas Development Project <br />
<br />
<br />
Client: Client: Badr Petroleum Company (Bapetco) <br />
Project Description <br />
The project aims to the Installation of CO2 removal Plant, utility facilities to support CO2 REMOVAL PLANT, 29KM P/L, Gas turbine generator, Air cooler,2 Separators, Flare Package. <br />
Contract Type <br />
Professional Services & Construction Lump-sum, Material Disbursable – EPC Turnkey. <br />
Scope of Services <br />
Detailed engineering, material supply, construction, commissioning & start-up <br />
<br />
# [[West Harbor Gas Processing Plant]]]<br />
#* West Harbor Expansion Project<br />
#* Client: Pharaonic Petroleum Company (PhPC)<br />
#* Project Description: <br />
#** The project aims to expand West Harbor facility, which is currently processing 280 MMSCFD from Ha’py and 265 MMSCFD from Taurt fields; by providing an additional HP stage Compression Train and Expand the plant design capacity to 585 MMSCFD<br />
#** Contract Type: EPC LSTK (Enppi Main Contractor)<br />
#** Scope of Services: Engineering, Material Supply, Construction, Commissioning and Start-up and Overall Management <br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Phase VII Main Compression Onshore Project <br />
<br />
Client: Burullus Gas Company (Burullus) <br />
Project Description <br />
The project aims to the installation of a new 5x25% gas turbine driven compression trains, for Burullus Gas Company (a joint venture with BG), with a capacity of 642 Million Standard Cubic Feet per day in the <br />
7th phase of Idku Hub plant, to accommodate the pressure declination of the plant inlet pressure from 58 to 30 bar gauge. <br />
It also includes a new Finger type slug catcher, High Pressure Separators and all supporting utilities. <br />
Contract Type <br />
EPC main contractor – Lump-sum turnkey <br />
Scope of Services <br />
Basic & detailed engineering, Project Management, material supply, construction, commissioning & start-up <br />
<br />
Yanbu Gas Plant Expansion 2006 / 2009 <br />
<br />
Client: Saudi Aramco <br />
Project Description <br />
The project aims to expand Yanbu NGL plant capacity from 390 to 585 MBOD. The work scope includes 195 MBOD de-Ethanizer with ancillaries and propane, refrigeration system, feed to the existing de-Propanizer and de-Butanizer columns, construction of substation with process interface room and expansion of DCS and ESD systems. <br />
Contract Type <br />
EPC main contractor – Lump-sum turnkey <br />
Scope of Services <br />
Detailed engineering, material supply, construction, commissioning & start-up <br />
<br />
<br />
<br />
Extraction and Compression Project <br />
<br />
Client: Petróleos de Venezuela, S.A. (PDVSA) <br />
Project Description <br />
The project aims to install a new NGL extraction plant in San Joaquin with a processing capacity of 1000 MMSCFD of natural gas. Contract Type <br />
Lump-sum for professional services & material supply cost plus <br />
Scope of Services <br />
Basic & detailed engineering & procurement services <br />
<br />
<br />
<br />
PAGMI Project Phase I & II Gas conditioning for Domestic Market <br />
<br />
Client: Petróleos de Venezuela, S.A. (PDVSA) <br />
Project Description <br />
Treating & Conditioning of gas produced from the offshore area in Northeastern Venezuela to be used in the domestic market in the PDVSA Complex, located in Güİria, Estado Sucre – Venezuela. <br />
Phase I: Conditioning of 600 MMSCFD from Dragon field (mainly Methane saturated with water), molecular sieve dehydration package and all required utilities to accomplish the domestic market requirements. <br />
Phase II: Treatment of 1000 MMSCFD gas & 20197 STD bpd condensate. There will be an additional dehydration module (module B) parallel to module A in PAGMI phase I with a capacity of 600 MMSCFD with different outlet water content. <br />
Contract Type <br />
EPCM – Lump-sum for professional services, material supply cost plus and unit rates for construction works Scope of Services <br />
Basic engineering review, detailed engineering and procurement services for long lead equipment, construction management and overall management for phase I. Conceptual engineering and basic and detailed engineering for phase II <br />
<br />
# [[Khursaniyah Gas Processing Plant]]<br />
#* Khursaniyah Gas Plant 2005 / 2006<br />
#* Client: Saudi Aramco / Bechtel <br />
#* Project Description: <br />
#** The Khursaniyah gas plant includes two gas-conditioning trains, ethane and natural gas liquids recovery units process 1000 MMSCFD of natural gas, produce 550 MMSCFD sales gas, 240,000 BL/D ethane / natural gas liquids, and 1,800 metric tons / day sulfur. <br />
#** The complex will process natural gas from three onshore fields in the eastern province: Abu Hadriya, Fadhili, and Khursaniyah. <br />
#** Contract Type: Professional services - reimbursable basis<br />
#** Scope of Services: Engineering services (main contractor – Bechtel) <br />
<br />
<br />
Ethane Recovery Project <br />
<br />
Client: Petróleos de Venezuela, S.A. (PDVSA) <br />
Project Description <br />
Installation of 2200 MMSCFD gas sweetening plant to completely remove the CO2 / H2S and CO2 dehydration for the natural gas upstream. The extraction facilities in ANACO and the dehydrated CO2 (200 MMSCFD) will be used for well gas lift, in addition to retrofit of the San Joaquin extraction facilities Trains A & B to achieve 98 % ethane recovery. The scope includes provision of molecular sieve dehydration package along with its regeneration <br />
(H2O plus CO2 200 MMSCFD – well gas lift.) <br />
Contract Type <br />
Lump sum for professional services <br />
Scope of Services <br />
Basic & detailed engineering for sweetening package (ISBL), detailed engineering for C2 extraction unit (ISBL) and overall project management & coordination <br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Fractionation Capacity Increase at Jose (ACFJ) Project <br />
<br />
Client: Petróleos de Venezuela, S.A. (PDVSA) <br />
Project Description <br />
Development of new facilities to process the increase of NGL capacity to 50000 BPD in order to cover the requirements of the 1st phase of NGL production increase. Each fractionation train will be designed to produce propane, ISO-butane, n-butane, pentanes, gasoline, and heavy ends. <br />
Contract Type <br />
Lump sum for professional services / material supply cost plus Scope of Services <br />
Conceptual design, basic & detailed engineering, procurement services and construction supervision <br />
<br />
<br />
# [[Al Khafji Oil Field]]<br />
#* Al-Khafji Field Development – Phase 1 2006 / 2010 <br />
#* Client: Al-Khafji Joint Operations (KJO) <br />
#* Project Description <br />
#** The field development for Khafji has been developed to maintain the maximum sustainable capacity of 300,000 Barrel Oil per Day and production of 125 Million Standard Cubic Feet Per Day of Associated gases, as well as, 50 Million Standard Cubic Feet Per Day gas lift, by installation of 6 new platforms, 8500 tons total structure weight and modification of 9 existing platforms, in addition to subsea pipelines with a total length of 110 kilometer sizing 24 inches, 28 inches, 36 inches and 42 inches and laying of 59 km subsea cables. <br />
#** Contract Type - EPC LSTK – consortium <br />
#** Scope of Services - Engineering, material supply, supervision of onshore structure fabrication & offshore laying/installation, overall management, consortium leader and commissioning & start-up <br />
<br />
<br />
<br />
Obayied Pre-Compression Project 2006 / 2009 <br />
<br />
Client: Badr Petroleum Company (BAPETCO) <br />
Project Description <br />
The project aims to restore Obayied Gas Plant (OGP) compression capacity by 420 MMSCFD through the installation of 2x50% compression train facilities to upgrade OGP pressure from 25 to 86 barg. <br />
Contract Type <br />
EPC turnkey – Lump-sum for professional services and construction works and <br />
disbursable for material supply <br />
Scope of Services <br />
Detailed engineering, procurement, construction supervision, commissioning & start-up assistance and overall project management <br />
<br />
<br />
<br />
Sapphire Gas Development Project 2003 / 2005 <br />
<br />
Client: Burullus Gas Company (Burullus) <br />
Project Description <br />
Extension to the onshore existing <br />
Scarab/Saffron and Simian/Sienna facility to treat 665 MMSCFD of natural gas produced from Sapphire offshore deepwater fields to feed the onshore Egyptian LNG Plant. <br />
Contract Type <br />
EPC Lump-sum turnkey – consortium <br />
Scope of Services <br />
Consortium leader, overall Project <br />
management, basic & detailed engineering, procurement services, construction supervision, commissioning & start-up assistance <br />
<br />
<br />
<br />
Simian / Sienna Gas Development Project 2003 / 2005 <br />
<br />
Client: Burullus Gas Company (Burullus) <br />
Project Description <br />
Extension to the onshore existing <br />
Scarab/Saffron facility to treat 665 MMSCFD of natural gas produced from Simian / Sienna offshore deep water fields to feed the onshore Egyptian LNG Plant. <br />
Contract Type <br />
EPC Lump-sum turnkey – consortium <br />
Scope of Services <br />
Consortium leader, overall project management, basic & detailed engineering, procurement services, construction supervision, commissioning & start-up assistance <br />
<br />
Maximization of C2 / C3 from Western Desert Gas Fields <br />
<br />
Client: The Egyptian Natural Gas Company (GASCO) <br />
Project Description <br />
The project aims to maximize C2 & C3 recovery in the Western Desert Gas Complex and Amerya Liquefied Petroleum Gas (LPG) plant. The recovered C2 & C3 in Amerya LPG plant will be transferred to Western Desert Gas Complex through a 12 inch pipeline to be processed within Western Desert Gas Complex, where the storage and loading facilities exist. <br />
The project was executed in three phases; the 1st tends to reach a production of 600 million standard cubic feet per day, the 2nd stage tends to reach a production of 800 million standard cubic feet per day, and finally to reach by the 3rd phase a total production of 900 million standard cubic feet per day. <br />
Contract Type <br />
Lump-sum for professional services / material supply disbursable <br />
Scope of Services <br />
EPCM: techno-economic / feasibility study, basic and detailed engineering, procurement, construction supervision, commissioning & start up assistance & overall project management <br />
<br />
<br />
Western Desert Gas Complex <br />
<br />
Client: The Egyptian Natural Gas Company (GASCO) <br />
Project Description <br />
The project aims to the treatment of 550 million standard cubic feet per day of natural gas produced from the western desert (Obaiyed, Salam and Tarek), to produce ethane & propane mixture of downstream ethylene and polyethylene production, commercial propane, sales gas, Liquefied Petroleum Gas (LPG) and condensate. <br />
Contract Type <br />
Lump-sum for professional services and disbursable for material supply <br />
Scope of Services <br />
EPCM: techno-economic / feasibility study, basic and detailed engineering, procurement, construction supervision, commissioning & start-up assistance and overall project management <br />
<br />
<br />
<br />
NGL Project at Port Said 2001 / 2004 <br />
<br />
Client: United Gas Derivatives Company (UGDC) (BP / Eni / GASCO) <br />
Project Description <br />
Installation of processing facilities for 1100 MMSCFD feed of natural gases produced from El- Gamil & HA’PY fields to produce propane, LPG, and condensates (dehydration package : 1100 MMSCFD molecular sieve one train). <br />
Contract Type <br />
Lump-sum for professional services and <br />
material supply disbursable <br />
Scope of Services <br />
EPCM: basic engineering review, detailed engineering and procurement services, construction supervision, commissioning & start-up assistance and overall project management <br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Damietta Export Facilities 2001 / 2004 <br />
<br />
Client: United Gas Derivatives Company (UGDC) <br />
Project Description <br />
Installation of Marine export facilities – cryogenic tank capacity (30,000m3) for propane storage produced from Port Said NGL process facilities <br />
Contract Type <br />
EPC turnkey – consortium (Enppi / Tractebel) – lump-sum for professional services, cost plus fees for material supply and construction work <br />
Scope of Services <br />
FEED & detailed engineering, procurement, construction, commissioning, & start-up assistance <br />
<br />
Professional Services for Denise Platform 2006 / 2008 <br />
<br />
Client: Belayim Petroleum Company (Petrobel) <br />
Project Description <br />
Upgrade of TNW2 existing platform to suit Denise gas field production, transmit additional capacity to onshore via 61 KM 32” offshore pipeline and 1 KM 32” pipeline onshore and upgrade of El Gamil onshore facilities. <br />
Contract Type <br />
Lump sum for professional services <br />
Scope of Services <br />
Basic & detailed engineering and procurement services <br />
<br />
Semman Field Development 2006 / 2008 <br />
<br />
Client: Belayim Petroleum Company (Petrobel) <br />
Project Description <br />
Installation of new Semman platform (tripod plus deck) and laying of new 18” sea line from Semman to existing Darfeel platform with total length 20 Km. <br />
Contract Type <br />
Professional services reimbursable <br />
Scope of Services <br />
Basic engineering review, detailed engineering and procurement services <br />
<br />
Taurt Onshore Detailed Engineering 2006 / 2007 <br />
<br />
Client: Gulf of Suez Petroleum Company (GUPCO) <br />
Project Description <br />
GUPCO intends to develop Taurt field through a sub-sea production system (SPS) that consists of 7 sub-sea wells tied with a manifold with well testing capability. <br />
Contract Type <br />
Professional services reimbursable <br />
Scope of Services <br />
Detailed Engineering for onshore part of Taurt gas field development project <br />
<br />
<br />
Offshore North Sinai Field Development ONS 2005 / 2007 - NOSPCO <br />
<br />
Client: The Egyptian Natural Gas Company (GASCO) <br />
Project Description <br />
Development of Tao offshore gas field, 60 km north of Rommana producing 130 MMSCFD of gas. The development includes offshore production wells, production platform, submarine pipeline, onshore gas treatment plant and sales gas pipeline, in addition to gas dehydration. <br />
Contract Type <br />
Lump-Sum for professional services and disbursable for material supply <br />
Scope of Services <br />
Detailed engineering for offshore topside facilities and onshore gas central processing facility, overall procurement services except pipelines and offshore structure steel, and construction supervision <br />
<br />
<br />
Temsah – 4 Platform 2005 / 2007 <br />
<br />
Client: Belayim Petroleum Company (Petrobel) <br />
Project Description <br />
Installation of a new platform: 4 legs, 12-slot unmanned fixed offshore production platform at 85 m water depth and a capacity of 10 MMSCMD gas plus 3000 BPD condensate. <br />
Contract Type <br />
Lump-sum for professional services <br />
Scope of Services <br />
Basic & detailed engineering and procurement services <br />
<br />
Baltim-N Platform 2003 / 2005 <br />
<br />
Client: Belayim Petroleum Company (Petrobel ) <br />
Project Description <br />
The project aims to install 4 legs 9-slots tubular steel frame jacket, and a fixed offshore production platform with a capacity of 4.7 MMSCMD Gas. Gas & Condensate are directed to Baltim east existing platform through an 18" Pipeline. <br />
Contract Type <br />
Lump sum for professional services <br />
Scope of Services <br />
Basic & detailed engineering and procurement services <br />
# [[Barboni Gas Field]]<br />
#* Barboni Platform 2003 / 2005 <br />
#* Client: Belayim Petroleum Company (Petrobel) <br />
#* Project Description <br />
#** The project aims to install a new platform in 91 m Water Depth, Capacity of 4.4 MMSCMD. Gas is transmitted to Noras P.L.E.M. via 26” subsea pipeline. <br />
#* Contract Type <br />
#** Lump-sum for professional services <br />
#* Scope of Services <br />
#** Basic & detailed engineering and procurement services <br />
<br />
Rashid-2 Platform Project <br />
2003 / 2004 <br />
<br />
Client: Rashid Petroleum Company (RASHPETCO) <br />
Project Description <br />
The project aims to install 4 legged unmanned steel jacket platform located at Rosetta 49 m water depth with a capacity of 265 MMSCFD and weighing 450 tons. The gas is transmitted through a 24” subsea pipeline to the onshore terminal for final processing, along with 3 (1X70 mm2) XLPE 12/20 KV 61 KM submarine cable with optical <br />
fiber bundle Contract Type <br />
Lump-sum for professional services <br />
Scope of Services <br />
Basic & detailed engineering and procurement services <br />
<br />
<br />
Amerya LPG Recovery Plant <br />
<br />
Client: Egyptian General Petroleum Corporation (EGPC) <br />
Project Description <br />
The project aims to install LPG recovery plant with inlet gas production capacity of 300 MMSCFD producing 360 T/D of LPG. The scope includes dehydration: 330 MMSCFD molecular sieve one train. <br />
Contract Type <br />
Lump-sum for professional services and disbursable for material supply and construction work <br />
Scope of Services <br />
Basic & detailed engineering and procurement services, construction supervision, commissioning & start-up assistance <br />
<br />
<br />
<br />
<br />
<br />
Damietta LNG project 2002 / 2005 <br />
<br />
Client: SEGAS - Union Fenosa – M.W. Kellogg – UK <br />
Project Description <br />
The Project aims to install LNG plant at Damietta with production of 4.7 MMTY of LNG. <br />
Contract Type <br />
S/C. from M.W. Kellogg – Lump-sum for engineering services, reimbursable for procurement services & <br />
construction supervision <br />
Scope of Services <br />
Detailed engineering for fractionators unit, procurement services & construction supervision <br />
<br />
<br />
<br />
<br />
Egyptian LNG Project 2002 / 2005 <br />
<br />
Client: The Egyptian Liquefied Natural Gas Company <br />
(ELNG) Project Description <br />
The 1st LNG project in Egypt, two trains LNG plant with a capacity of 3.6 MMTY LNG productions each, located In Idku, Beheira - Northern Coast of Egypt. <br />
Contract Type <br />
S/C. Lump sum for engineering services – Bechtel Houston <br />
Scope of Services <br />
Detailed engineering for: Inlet treating unit, buildings for power generation, LNG storage, flares, marine facilities & utilities <br />
<br />
<br />
# [[Rosetta Gas Field]] <br />
#* Rosetta Gas Field Development - 1998 / 2000 <br />
#* Client: Rashid Petroleum Company (RASHPETCO) <br />
#* Project Description <br />
#** The project aims to install offshore production platform with a capacity of 275 MMSCFD. Gas is transmitted through a 24” gas subsea P/L 67 km to onshore terminal. <br />
#* Contract Type <br />
#** Lump sum for basic & detailed engineering reimbursable for construction supervision, commissioning and start-up assistance <br />
#* Scope of Services <br />
#** Detailed engineering, procurement services, construction supervision, commissioning & startup assistance <br />
<br />
<br />
Transgulf LPG Plant <br />
<br />
Client: Egyptian General Petroleum Corporation (EGPC) <br />
Project Description <br />
Inlet gas production 130 MMSCFD - produce 960 T/D of LPG. The scope includes provision of molecular sieve dehydration package along with its regeneration 130 MMSCFD one train. <br />
Contract Type <br />
EPC turnkey - Lump sum for professional services and disbursable for material supply and construction works <br />
Scope of Services <br />
Detailed engineering, procurement services, construction supervision, commissioning and start-up assistance <br />
<br />
<br />
<br />
Qantara Field Development <br />
<br />
Client: Qantara Petroleum Company (QPC) <br />
Project Description <br />
Development of Qantara field with a total capacity of 8 MMSCFD to produce: <br />
- 6 MMSCFD sales gas transferred to GASCO gas grid manifold through a 6” Pipeline 0.4 Km. <br />
- 1000 BBL/Day transferred to the petroleum pipeline company 12”condensate pipeline through 4” pipeline to the Suez Refinery. Contract Type <br />
EPC Lump-sum turnkey <br />
Scope of Services <br />
Detailed engineering, material supply, construction, commissioning & start-up <br />
Bed 2 Field Development <br />
Client: Egyptian General Petroleum Corporation (EGPC) <br />
Project Description <br />
Bed 2 gas field includes a gas gathering and gas liquid separation, one gas production train, 180 MMCFD, train contains production separator, glycol dehydration unit and inter field pipelines between Bed-2 & Bed-3, in addition to third gas train in Bed-3. The scope also includes provision of TEG Dehydration package along with its regeneration. <br />
Contract Type <br />
Reimbursable MHR's <br />
Scope of Services <br />
Basic and detailed engineering as subcontractor through COMPRIMO <br />
<br />
Bed 3 Field Development <br />
Client: Egyptian General Petroleum Corporation (EGPC) <br />
Project Description <br />
Two identical gas conditioning trains, 90 MMSCFD capacity each, trains contains production separator, glycol dehydration unit, turbo-expander, LTS and sales gas compressor, the third train was added due to increase Bed-2 supply increase, oil production trains produces oil at 3 different levels with total capacity of 40,000 BBLD. The scope includes provision of Triethylene Glycol Dehydration package along with its regeneration. <br />
Contract Type <br />
Reimbursable MHR's <br />
Scope of Services <br />
Basic engineering, (subcontract of detailed engineering – International Bechtel Incorporation IBI UK) in addition to procurement services <br />
<br />
Abu Sannan Condensate Recovery Plant 1988 / 1990 <br />
<br />
Client: General Petroleum Company (GPC) <br />
Project Description <br />
Gathering of 85 MMSCFD of natural gas from three gas fields (T, Y & Bed 1) through pipelines and delivered to a central processing area where condensate is recovered and spiked into GPC existing crude pipelines. The scope also includes provision of Tri-ethylene Glycol Dehydration package along with its regeneration. <br />
Contract Type <br />
Lump sum for professional services & disbursable for material supply and construction work reimbursable <br />
Scope of Services <br />
Detailed engineering, material supply, construction, commissioning & start-up <br />
<br />
<br />
<br />
Abu Madi LPG Recovery <br />
<br />
Client: Belayim Petroleum Company (Petrobel) <br />
Project Description <br />
The plant is designed to treat 260 MMSCFD produced at existing LTS units in order to recover LPG and condensate and deliver sales gas to users - dehydration: 260 MMSCFD Molecular Sieve. <br />
Contract Type <br />
Reimbursable maximum ceil man-hours <br />
Scope of Services <br />
Project management including basic and detailed engineering review and procurement services, in addition to partial detailed engineering and survey services as subcontractor to Snamprogetti</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=Barboni_Gas_Field&diff=73476Barboni Gas Field2024-03-14T17:10:33Z<p>Abarrelfull: </p>
<hr />
<div>Summary Information<br />
* Operator: ENI<br />
* Country: Egypt <br />
* Location: North Port Said<br />
* Production start: <br />
* Partners: <br />
* Type: Oil / Gas<br />
* Estimated Reserves: <br />
* Production Volume: <br />
<br />
+++ Description<br />
* <br />
<br />
+++ Contractors<br />
* ENPPI: Platform installation<br />
* **Micoperi:** Hook up activities, PLEM and spools installation on Akhen, Temsah 4 and Barboni Platforms<br />
<br />
+++ History<br />
* <br />
<br />
+++ Geology<br />
* <br />
<br />
+++ Links<br />
# [[ENPPI Gas Processing References]]<br />
# [[Micoperi Offshore And Platform References]]</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=ENPPI_Gas_Processing_References&diff=73475ENPPI Gas Processing References2024-03-14T17:09:51Z<p>Abarrelfull: </p>
<hr />
<div>Assil & Karam Gas Development Project <br />
<br />
<br />
Client: Client: Badr Petroleum Company (Bapetco) <br />
Project Description <br />
The project aims to the Installation of CO2 removal Plant, utility facilities to support CO2 REMOVAL PLANT, 29KM P/L, Gas turbine generator, Air cooler,2 Separators, Flare Package. <br />
Contract Type <br />
Professional Services & Construction Lump-sum, Material Disbursable – EPC Turnkey. <br />
Scope of Services <br />
Detailed engineering, material supply, construction, commissioning & start-up <br />
<br />
# [[West Harbor Gas Processing Plant]]]<br />
#* West Harbor Expansion Project<br />
#* Client: Pharaonic Petroleum Company (PhPC)<br />
#* Project Description: <br />
#** The project aims to expand West Harbor facility, which is currently processing 280 MMSCFD from Ha’py and 265 MMSCFD from Taurt fields; by providing an additional HP stage Compression Train and Expand the plant design capacity to 585 MMSCFD<br />
#** Contract Type: EPC LSTK (Enppi Main Contractor)<br />
#** Scope of Services: Engineering, Material Supply, Construction, Commissioning and Start-up and Overall Management <br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Phase VII Main Compression Onshore Project <br />
<br />
Client: Burullus Gas Company (Burullus) <br />
Project Description <br />
The project aims to the installation of a new 5x25% gas turbine driven compression trains, for Burullus Gas Company (a joint venture with BG), with a capacity of 642 Million Standard Cubic Feet per day in the <br />
7th phase of Idku Hub plant, to accommodate the pressure declination of the plant inlet pressure from 58 to 30 bar gauge. <br />
It also includes a new Finger type slug catcher, High Pressure Separators and all supporting utilities. <br />
Contract Type <br />
EPC main contractor – Lump-sum turnkey <br />
Scope of Services <br />
Basic & detailed engineering, Project Management, material supply, construction, commissioning & start-up <br />
<br />
Yanbu Gas Plant Expansion 2006 / 2009 <br />
<br />
Client: Saudi Aramco <br />
Project Description <br />
The project aims to expand Yanbu NGL plant capacity from 390 to 585 MBOD. The work scope includes 195 MBOD de-Ethanizer with ancillaries and propane, refrigeration system, feed to the existing de-Propanizer and de-Butanizer columns, construction of substation with process interface room and expansion of DCS and ESD systems. <br />
Contract Type <br />
EPC main contractor – Lump-sum turnkey <br />
Scope of Services <br />
Detailed engineering, material supply, construction, commissioning & start-up <br />
<br />
<br />
<br />
Extraction and Compression Project <br />
<br />
Client: Petróleos de Venezuela, S.A. (PDVSA) <br />
Project Description <br />
The project aims to install a new NGL extraction plant in San Joaquin with a processing capacity of 1000 MMSCFD of natural gas. Contract Type <br />
Lump-sum for professional services & material supply cost plus <br />
Scope of Services <br />
Basic & detailed engineering & procurement services <br />
<br />
<br />
<br />
PAGMI Project Phase I & II Gas conditioning for Domestic Market <br />
<br />
Client: Petróleos de Venezuela, S.A. (PDVSA) <br />
Project Description <br />
Treating & Conditioning of gas produced from the offshore area in Northeastern Venezuela to be used in the domestic market in the PDVSA Complex, located in Güİria, Estado Sucre – Venezuela. <br />
Phase I: Conditioning of 600 MMSCFD from Dragon field (mainly Methane saturated with water), molecular sieve dehydration package and all required utilities to accomplish the domestic market requirements. <br />
Phase II: Treatment of 1000 MMSCFD gas & 20197 STD bpd condensate. There will be an additional dehydration module (module B) parallel to module A in PAGMI phase I with a capacity of 600 MMSCFD with different outlet water content. <br />
Contract Type <br />
EPCM – Lump-sum for professional services, material supply cost plus and unit rates for construction works Scope of Services <br />
Basic engineering review, detailed engineering and procurement services for long lead equipment, construction management and overall management for phase I. Conceptual engineering and basic and detailed engineering for phase II <br />
<br />
# [[Khursaniyah Gas Processing Plant]]<br />
#* Khursaniyah Gas Plant 2005 / 2006<br />
#* Client: Saudi Aramco / Bechtel <br />
#* Project Description: <br />
#** The Khursaniyah gas plant includes two gas-conditioning trains, ethane and natural gas liquids recovery units process 1000 MMSCFD of natural gas, produce 550 MMSCFD sales gas, 240,000 BL/D ethane / natural gas liquids, and 1,800 metric tons / day sulfur. <br />
#** The complex will process natural gas from three onshore fields in the eastern province: Abu Hadriya, Fadhili, and Khursaniyah. <br />
#** Contract Type: Professional services - reimbursable basis<br />
#** Scope of Services: Engineering services (main contractor – Bechtel) <br />
<br />
<br />
Ethane Recovery Project <br />
<br />
Client: Petróleos de Venezuela, S.A. (PDVSA) <br />
Project Description <br />
Installation of 2200 MMSCFD gas sweetening plant to completely remove the CO2 / H2S and CO2 dehydration for the natural gas upstream. The extraction facilities in ANACO and the dehydrated CO2 (200 MMSCFD) will be used for well gas lift, in addition to retrofit of the San Joaquin extraction facilities Trains A & B to achieve 98 % ethane recovery. The scope includes provision of molecular sieve dehydration package along with its regeneration <br />
(H2O plus CO2 200 MMSCFD – well gas lift.) <br />
Contract Type <br />
Lump sum for professional services <br />
Scope of Services <br />
Basic & detailed engineering for sweetening package (ISBL), detailed engineering for C2 extraction unit (ISBL) and overall project management & coordination <br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Fractionation Capacity Increase at Jose (ACFJ) Project <br />
<br />
Client: Petróleos de Venezuela, S.A. (PDVSA) <br />
Project Description <br />
Development of new facilities to process the increase of NGL capacity to 50000 BPD in order to cover the requirements of the 1st phase of NGL production increase. Each fractionation train will be designed to produce propane, ISO-butane, n-butane, pentanes, gasoline, and heavy ends. <br />
Contract Type <br />
Lump sum for professional services / material supply cost plus Scope of Services <br />
Conceptual design, basic & detailed engineering, procurement services and construction supervision <br />
<br />
<br />
# [[Al Khafji Oil Field]]<br />
#* Al-Khafji Field Development – Phase 1 2006 / 2010 <br />
#* Client: Al-Khafji Joint Operations (KJO) <br />
#* Project Description <br />
#** The field development for Khafji has been developed to maintain the maximum sustainable capacity of 300,000 Barrel Oil per Day and production of 125 Million Standard Cubic Feet Per Day of Associated gases, as well as, 50 Million Standard Cubic Feet Per Day gas lift, by installation of 6 new platforms, 8500 tons total structure weight and modification of 9 existing platforms, in addition to subsea pipelines with a total length of 110 kilometer sizing 24 inches, 28 inches, 36 inches and 42 inches and laying of 59 km subsea cables. <br />
#** Contract Type - EPC LSTK – consortium <br />
#** Scope of Services - Engineering, material supply, supervision of onshore structure fabrication & offshore laying/installation, overall management, consortium leader and commissioning & start-up <br />
<br />
<br />
<br />
Obayied Pre-Compression Project 2006 / 2009 <br />
<br />
Client: Badr Petroleum Company (BAPETCO) <br />
Project Description <br />
The project aims to restore Obayied Gas Plant (OGP) compression capacity by 420 MMSCFD through the installation of 2x50% compression train facilities to upgrade OGP pressure from 25 to 86 barg. <br />
Contract Type <br />
EPC turnkey – Lump-sum for professional services and construction works and <br />
disbursable for material supply <br />
Scope of Services <br />
Detailed engineering, procurement, construction supervision, commissioning & start-up assistance and overall project management <br />
<br />
<br />
<br />
Sapphire Gas Development Project 2003 / 2005 <br />
<br />
Client: Burullus Gas Company (Burullus) <br />
Project Description <br />
Extension to the onshore existing <br />
Scarab/Saffron and Simian/Sienna facility to treat 665 MMSCFD of natural gas produced from Sapphire offshore deepwater fields to feed the onshore Egyptian LNG Plant. <br />
Contract Type <br />
EPC Lump-sum turnkey – consortium <br />
Scope of Services <br />
Consortium leader, overall Project <br />
management, basic & detailed engineering, procurement services, construction supervision, commissioning & start-up assistance <br />
<br />
<br />
<br />
Simian / Sienna Gas Development Project 2003 / 2005 <br />
<br />
Client: Burullus Gas Company (Burullus) <br />
Project Description <br />
Extension to the onshore existing <br />
Scarab/Saffron facility to treat 665 MMSCFD of natural gas produced from Simian / Sienna offshore deep water fields to feed the onshore Egyptian LNG Plant. <br />
Contract Type <br />
EPC Lump-sum turnkey – consortium <br />
Scope of Services <br />
Consortium leader, overall project management, basic & detailed engineering, procurement services, construction supervision, commissioning & start-up assistance <br />
<br />
Maximization of C2 / C3 from Western Desert Gas Fields <br />
<br />
Client: The Egyptian Natural Gas Company (GASCO) <br />
Project Description <br />
The project aims to maximize C2 & C3 recovery in the Western Desert Gas Complex and Amerya Liquefied Petroleum Gas (LPG) plant. The recovered C2 & C3 in Amerya LPG plant will be transferred to Western Desert Gas Complex through a 12 inch pipeline to be processed within Western Desert Gas Complex, where the storage and loading facilities exist. <br />
The project was executed in three phases; the 1st tends to reach a production of 600 million standard cubic feet per day, the 2nd stage tends to reach a production of 800 million standard cubic feet per day, and finally to reach by the 3rd phase a total production of 900 million standard cubic feet per day. <br />
Contract Type <br />
Lump-sum for professional services / material supply disbursable <br />
Scope of Services <br />
EPCM: techno-economic / feasibility study, basic and detailed engineering, procurement, construction supervision, commissioning & start up assistance & overall project management <br />
<br />
<br />
Western Desert Gas Complex <br />
<br />
Client: The Egyptian Natural Gas Company (GASCO) <br />
Project Description <br />
The project aims to the treatment of 550 million standard cubic feet per day of natural gas produced from the western desert (Obaiyed, Salam and Tarek), to produce ethane & propane mixture of downstream ethylene and polyethylene production, commercial propane, sales gas, Liquefied Petroleum Gas (LPG) and condensate. <br />
Contract Type <br />
Lump-sum for professional services and disbursable for material supply <br />
Scope of Services <br />
EPCM: techno-economic / feasibility study, basic and detailed engineering, procurement, construction supervision, commissioning & start-up assistance and overall project management <br />
<br />
<br />
<br />
NGL Project at Port Said 2001 / 2004 <br />
<br />
Client: United Gas Derivatives Company (UGDC) (BP / Eni / GASCO) <br />
Project Description <br />
Installation of processing facilities for 1100 MMSCFD feed of natural gases produced from El- Gamil & HA’PY fields to produce propane, LPG, and condensates (dehydration package : 1100 MMSCFD molecular sieve one train). <br />
Contract Type <br />
Lump-sum for professional services and <br />
material supply disbursable <br />
Scope of Services <br />
EPCM: basic engineering review, detailed engineering and procurement services, construction supervision, commissioning & start-up assistance and overall project management <br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Damietta Export Facilities 2001 / 2004 <br />
<br />
Client: United Gas Derivatives Company (UGDC) <br />
Project Description <br />
Installation of Marine export facilities – cryogenic tank capacity (30,000m3) for propane storage produced from Port Said NGL process facilities <br />
Contract Type <br />
EPC turnkey – consortium (Enppi / Tractebel) – lump-sum for professional services, cost plus fees for material supply and construction work <br />
Scope of Services <br />
FEED & detailed engineering, procurement, construction, commissioning, & start-up assistance <br />
<br />
Professional Services for Denise Platform 2006 / 2008 <br />
<br />
Client: Belayim Petroleum Company (Petrobel) <br />
Project Description <br />
Upgrade of TNW2 existing platform to suit Denise gas field production, transmit additional capacity to onshore via 61 KM 32” offshore pipeline and 1 KM 32” pipeline onshore and upgrade of El Gamil onshore facilities. <br />
Contract Type <br />
Lump sum for professional services <br />
Scope of Services <br />
Basic & detailed engineering and procurement services <br />
<br />
Semman Field Development 2006 / 2008 <br />
<br />
Client: Belayim Petroleum Company (Petrobel) <br />
Project Description <br />
Installation of new Semman platform (tripod plus deck) and laying of new 18” sea line from Semman to existing Darfeel platform with total length 20 Km. <br />
Contract Type <br />
Professional services reimbursable <br />
Scope of Services <br />
Basic engineering review, detailed engineering and procurement services <br />
<br />
Taurt Onshore Detailed Engineering 2006 / 2007 <br />
<br />
Client: Gulf of Suez Petroleum Company (GUPCO) <br />
Project Description <br />
GUPCO intends to develop Taurt field through a sub-sea production system (SPS) that consists of 7 sub-sea wells tied with a manifold with well testing capability. <br />
Contract Type <br />
Professional services reimbursable <br />
Scope of Services <br />
Detailed Engineering for onshore part of Taurt gas field development project <br />
<br />
<br />
Offshore North Sinai Field Development ONS 2005 / 2007 - NOSPCO <br />
<br />
Client: The Egyptian Natural Gas Company (GASCO) <br />
Project Description <br />
Development of Tao offshore gas field, 60 km north of Rommana producing 130 MMSCFD of gas. The development includes offshore production wells, production platform, submarine pipeline, onshore gas treatment plant and sales gas pipeline, in addition to gas dehydration. <br />
Contract Type <br />
Lump-Sum for professional services and disbursable for material supply <br />
Scope of Services <br />
Detailed engineering for offshore topside facilities and onshore gas central processing facility, overall procurement services except pipelines and offshore structure steel, and construction supervision <br />
<br />
<br />
Temsah – 4 Platform 2005 / 2007 <br />
<br />
Client: Belayim Petroleum Company (Petrobel) <br />
Project Description <br />
Installation of a new platform: 4 legs, 12-slot unmanned fixed offshore production platform at 85 m water depth and a capacity of 10 MMSCMD gas plus 3000 BPD condensate. <br />
Contract Type <br />
Lump-sum for professional services <br />
Scope of Services <br />
Basic & detailed engineering and procurement services <br />
<br />
Baltim-N Platform 2003 / 2005 <br />
<br />
Client: Belayim Petroleum Company (Petrobel ) <br />
Project Description <br />
The project aims to install 4 legs 9-slots tubular steel frame jacket, and a fixed offshore production platform with a capacity of 4.7 MMSCMD Gas. Gas & Condensate are directed to Baltim east existing platform through an 18" Pipeline. <br />
Contract Type <br />
Lump sum for professional services <br />
Scope of Services <br />
Basic & detailed engineering and procurement services <br />
# [[Barboni Gas Field]]<br />
#* Barboni Platform 2003 / 2005 <br />
#* Client: Belayim Petroleum Company (Petrobel) <br />
#* Project Description <br />
#** The project aims to install a new platform in 91 m Water Depth, Capacity of 4.4 MMSCMD. Gas is transmitted to Noras P.L.E.M. via 26” subsea pipeline. <br />
#* Contract Type <br />
#** Lump-sum for professional services <br />
#* Scope of Services <br />
#** Basic & detailed engineering and procurement services <br />
<br />
Rashid-2 Platform Project <br />
2003 / 2004 <br />
<br />
Client: Rashid Petroleum Company (RASHPETCO) <br />
Project Description <br />
The project aims to install 4 legged unmanned steel jacket platform located at Rosetta 49 m water depth with a capacity of 265 MMSCFD and weighing 450 tons. The gas is transmitted through a 24” subsea pipeline to the onshore terminal for final processing, along with 3 (1X70 mm2) XLPE 12/20 KV 61 KM submarine cable with optical <br />
fiber bundle Contract Type <br />
Lump-sum for professional services <br />
Scope of Services <br />
Basic & detailed engineering and procurement services <br />
<br />
<br />
Amerya LPG Recovery Plant <br />
<br />
Client: Egyptian General Petroleum Corporation (EGPC) <br />
Project Description <br />
The project aims to install LPG recovery plant with inlet gas production capacity of 300 MMSCFD producing 360 T/D of LPG. The scope includes dehydration: 330 MMSCFD molecular sieve one train. <br />
Contract Type <br />
Lump-sum for professional services and disbursable for material supply and construction work <br />
Scope of Services <br />
Basic & detailed engineering and procurement services, construction supervision, commissioning & start-up assistance <br />
<br />
<br />
<br />
<br />
<br />
Damietta LNG project 2002 / 2005 <br />
<br />
Client: SEGAS - Union Fenosa – M.W. Kellogg – UK <br />
Project Description <br />
The Project aims to install LNG plant at Damietta with production of 4.7 MMTY of LNG. <br />
Contract Type <br />
S/C. from M.W. Kellogg – Lump-sum for engineering services, reimbursable for procurement services & <br />
construction supervision <br />
Scope of Services <br />
Detailed engineering for fractionators unit, procurement services & construction supervision <br />
<br />
<br />
<br />
<br />
Egyptian LNG Project 2002 / 2005 <br />
<br />
Client: The Egyptian Liquefied Natural Gas Company <br />
(ELNG) Project Description <br />
The 1st LNG project in Egypt, two trains LNG plant with a capacity of 3.6 MMTY LNG productions each, located In Idku, Beheira - Northern Coast of Egypt. <br />
Contract Type <br />
S/C. Lump sum for engineering services – Bechtel Houston <br />
Scope of Services <br />
Detailed engineering for: Inlet treating unit, buildings for power generation, LNG storage, flares, marine facilities & utilities <br />
<br />
<br />
<br />
Rosetta Gas Field Development 1998 / 2000 <br />
<br />
Client: Rashid Petroleum Company (RASHPETCO) <br />
Project Description <br />
The project aims to install offshore production platform with a capacity of 275 MMSCFD. Gas is transmitted through a 24” gas subsea P/L 67 km to onshore terminal. <br />
Contract Type <br />
Lump sum for basic & detailed engineering reimbursable for construction supervision, commissioning and start-up assistance <br />
Scope of Services <br />
Detailed engineering, procurement services, construction supervision, commissioning & startup assistance <br />
<br />
<br />
Transgulf LPG Plant <br />
<br />
Client: Egyptian General Petroleum Corporation (EGPC) <br />
Project Description <br />
Inlet gas production 130 MMSCFD - produce 960 T/D of LPG. The scope includes provision of molecular sieve dehydration package along with its regeneration 130 MMSCFD one train. <br />
Contract Type <br />
EPC turnkey - Lump sum for professional services and disbursable for material supply and construction works <br />
Scope of Services <br />
Detailed engineering, procurement services, construction supervision, commissioning and start-up assistance <br />
<br />
<br />
<br />
Qantara Field Development <br />
<br />
Client: Qantara Petroleum Company (QPC) <br />
Project Description <br />
Development of Qantara field with a total capacity of 8 MMSCFD to produce: <br />
- 6 MMSCFD sales gas transferred to GASCO gas grid manifold through a 6” Pipeline 0.4 Km. <br />
- 1000 BBL/Day transferred to the petroleum pipeline company 12”condensate pipeline through 4” pipeline to the Suez Refinery. Contract Type <br />
EPC Lump-sum turnkey <br />
Scope of Services <br />
Detailed engineering, material supply, construction, commissioning & start-up <br />
Bed 2 Field Development <br />
Client: Egyptian General Petroleum Corporation (EGPC) <br />
Project Description <br />
Bed 2 gas field includes a gas gathering and gas liquid separation, one gas production train, 180 MMCFD, train contains production separator, glycol dehydration unit and inter field pipelines between Bed-2 & Bed-3, in addition to third gas train in Bed-3. The scope also includes provision of TEG Dehydration package along with its regeneration. <br />
Contract Type <br />
Reimbursable MHR's <br />
Scope of Services <br />
Basic and detailed engineering as subcontractor through COMPRIMO <br />
<br />
Bed 3 Field Development <br />
Client: Egyptian General Petroleum Corporation (EGPC) <br />
Project Description <br />
Two identical gas conditioning trains, 90 MMSCFD capacity each, trains contains production separator, glycol dehydration unit, turbo-expander, LTS and sales gas compressor, the third train was added due to increase Bed-2 supply increase, oil production trains produces oil at 3 different levels with total capacity of 40,000 BBLD. The scope includes provision of Triethylene Glycol Dehydration package along with its regeneration. <br />
Contract Type <br />
Reimbursable MHR's <br />
Scope of Services <br />
Basic engineering, (subcontract of detailed engineering – International Bechtel Incorporation IBI UK) in addition to procurement services <br />
<br />
Abu Sannan Condensate Recovery Plant 1988 / 1990 <br />
<br />
Client: General Petroleum Company (GPC) <br />
Project Description <br />
Gathering of 85 MMSCFD of natural gas from three gas fields (T, Y & Bed 1) through pipelines and delivered to a central processing area where condensate is recovered and spiked into GPC existing crude pipelines. The scope also includes provision of Tri-ethylene Glycol Dehydration package along with its regeneration. <br />
Contract Type <br />
Lump sum for professional services & disbursable for material supply and construction work reimbursable <br />
Scope of Services <br />
Detailed engineering, material supply, construction, commissioning & start-up <br />
<br />
<br />
<br />
Abu Madi LPG Recovery <br />
<br />
Client: Belayim Petroleum Company (Petrobel) <br />
Project Description <br />
The plant is designed to treat 260 MMSCFD produced at existing LTS units in order to recover LPG and condensate and deliver sales gas to users - dehydration: 260 MMSCFD Molecular Sieve. <br />
Contract Type <br />
Reimbursable maximum ceil man-hours <br />
Scope of Services <br />
Project management including basic and detailed engineering review and procurement services, in addition to partial detailed engineering and survey services as subcontractor to Snamprogetti</div>Abarrelfullhttp://www.abarrelfull.co.uk/index.php?title=ENPPI_Gas_Processing_References&diff=73474ENPPI Gas Processing References2024-03-14T17:07:59Z<p>Abarrelfull: </p>
<hr />
<div>Assil & Karam Gas Development Project <br />
<br />
<br />
Client: Client: Badr Petroleum Company (Bapetco) <br />
Project Description <br />
The project aims to the Installation of CO2 removal Plant, utility facilities to support CO2 REMOVAL PLANT, 29KM P/L, Gas turbine generator, Air cooler,2 Separators, Flare Package. <br />
Contract Type <br />
Professional Services & Construction Lump-sum, Material Disbursable – EPC Turnkey. <br />
Scope of Services <br />
Detailed engineering, material supply, construction, commissioning & start-up <br />
<br />
# [[West Harbor Gas Processing Plant]]]<br />
#* West Harbor Expansion Project<br />
#* Client: Pharaonic Petroleum Company (PhPC)<br />
#* Project Description: <br />
#** The project aims to expand West Harbor facility, which is currently processing 280 MMSCFD from Ha’py and 265 MMSCFD from Taurt fields; by providing an additional HP stage Compression Train and Expand the plant design capacity to 585 MMSCFD<br />
#** Contract Type: EPC LSTK (Enppi Main Contractor)<br />
#** Scope of Services: Engineering, Material Supply, Construction, Commissioning and Start-up and Overall Management <br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Phase VII Main Compression Onshore Project <br />
<br />
Client: Burullus Gas Company (Burullus) <br />
Project Description <br />
The project aims to the installation of a new 5x25% gas turbine driven compression trains, for Burullus Gas Company (a joint venture with BG), with a capacity of 642 Million Standard Cubic Feet per day in the <br />
7th phase of Idku Hub plant, to accommodate the pressure declination of the plant inlet pressure from 58 to 30 bar gauge. <br />
It also includes a new Finger type slug catcher, High Pressure Separators and all supporting utilities. <br />
Contract Type <br />
EPC main contractor – Lump-sum turnkey <br />
Scope of Services <br />
Basic & detailed engineering, Project Management, material supply, construction, commissioning & start-up <br />
<br />
Yanbu Gas Plant Expansion 2006 / 2009 <br />
<br />
Client: Saudi Aramco <br />
Project Description <br />
The project aims to expand Yanbu NGL plant capacity from 390 to 585 MBOD. The work scope includes 195 MBOD de-Ethanizer with ancillaries and propane, refrigeration system, feed to the existing de-Propanizer and de-Butanizer columns, construction of substation with process interface room and expansion of DCS and ESD systems. <br />
Contract Type <br />
EPC main contractor – Lump-sum turnkey <br />
Scope of Services <br />
Detailed engineering, material supply, construction, commissioning & start-up <br />
<br />
<br />
<br />
Extraction and Compression Project <br />
<br />
Client: Petróleos de Venezuela, S.A. (PDVSA) <br />
Project Description <br />
The project aims to install a new NGL extraction plant in San Joaquin with a processing capacity of 1000 MMSCFD of natural gas. Contract Type <br />
Lump-sum for professional services & material supply cost plus <br />
Scope of Services <br />
Basic & detailed engineering & procurement services <br />
<br />
<br />
<br />
PAGMI Project Phase I & II Gas conditioning for Domestic Market <br />
<br />
Client: Petróleos de Venezuela, S.A. (PDVSA) <br />
Project Description <br />
Treating & Conditioning of gas produced from the offshore area in Northeastern Venezuela to be used in the domestic market in the PDVSA Complex, located in Güİria, Estado Sucre – Venezuela. <br />
Phase I: Conditioning of 600 MMSCFD from Dragon field (mainly Methane saturated with water), molecular sieve dehydration package and all required utilities to accomplish the domestic market requirements. <br />
Phase II: Treatment of 1000 MMSCFD gas & 20197 STD bpd condensate. There will be an additional dehydration module (module B) parallel to module A in PAGMI phase I with a capacity of 600 MMSCFD with different outlet water content. <br />
Contract Type <br />
EPCM – Lump-sum for professional services, material supply cost plus and unit rates for construction works Scope of Services <br />
Basic engineering review, detailed engineering and procurement services for long lead equipment, construction management and overall management for phase I. Conceptual engineering and basic and detailed engineering for phase II <br />
<br />
# [[Khursaniyah Gas Processing Plant]]<br />
#* Khursaniyah Gas Plant 2005 / 2006<br />
#* Client: Saudi Aramco / Bechtel <br />
#* Project Description: <br />
#** The Khursaniyah gas plant includes two gas-conditioning trains, ethane and natural gas liquids recovery units process 1000 MMSCFD of natural gas, produce 550 MMSCFD sales gas, 240,000 BL/D ethane / natural gas liquids, and 1,800 metric tons / day sulfur. <br />
#** The complex will process natural gas from three onshore fields in the eastern province: Abu Hadriya, Fadhili, and Khursaniyah. <br />
#** Contract Type: Professional services - reimbursable basis<br />
#** Scope of Services: Engineering services (main contractor – Bechtel) <br />
<br />
<br />
Ethane Recovery Project <br />
<br />
Client: Petróleos de Venezuela, S.A. (PDVSA) <br />
Project Description <br />
Installation of 2200 MMSCFD gas sweetening plant to completely remove the CO2 / H2S and CO2 dehydration for the natural gas upstream. The extraction facilities in ANACO and the dehydrated CO2 (200 MMSCFD) will be used for well gas lift, in addition to retrofit of the San Joaquin extraction facilities Trains A & B to achieve 98 % ethane recovery. The scope includes provision of molecular sieve dehydration package along with its regeneration <br />
(H2O plus CO2 200 MMSCFD – well gas lift.) <br />
Contract Type <br />
Lump sum for professional services <br />
Scope of Services <br />
Basic & detailed engineering for sweetening package (ISBL), detailed engineering for C2 extraction unit (ISBL) and overall project management & coordination <br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Fractionation Capacity Increase at Jose (ACFJ) Project <br />
<br />
Client: Petróleos de Venezuela, S.A. (PDVSA) <br />
Project Description <br />
Development of new facilities to process the increase of NGL capacity to 50000 BPD in order to cover the requirements of the 1st phase of NGL production increase. Each fractionation train will be designed to produce propane, ISO-butane, n-butane, pentanes, gasoline, and heavy ends. <br />
Contract Type <br />
Lump sum for professional services / material supply cost plus Scope of Services <br />
Conceptual design, basic & detailed engineering, procurement services and construction supervision <br />
<br />
<br />
# [[Al Khafji Oil Field]]<br />
#* Al-Khafji Field Development – Phase 1 2006 / 2010 <br />
#* Client: Al-Khafji Joint Operations (KJO) <br />
#* Project Description <br />
#** The field development for Khafji has been developed to maintain the maximum sustainable capacity of 300,000 Barrel Oil per Day and production of 125 Million Standard Cubic Feet Per Day of Associated gases, as well as, 50 Million Standard Cubic Feet Per Day gas lift, by installation of 6 new platforms, 8500 tons total structure weight and modification of 9 existing platforms, in addition to subsea pipelines with a total length of 110 kilometer sizing 24 inches, 28 inches, 36 inches and 42 inches and laying of 59 km subsea cables. <br />
#** Contract Type - EPC LSTK – consortium <br />
#** Scope of Services - Engineering, material supply, supervision of onshore structure fabrication & offshore laying/installation, overall management, consortium leader and commissioning & start-up <br />
<br />
<br />
<br />
Obayied Pre-Compression Project 2006 / 2009 <br />
<br />
Client: Badr Petroleum Company (BAPETCO) <br />
Project Description <br />
The project aims to restore Obayied Gas Plant (OGP) compression capacity by 420 MMSCFD through the installation of 2x50% compression train facilities to upgrade OGP pressure from 25 to 86 barg. <br />
Contract Type <br />
EPC turnkey – Lump-sum for professional services and construction works and <br />
disbursable for material supply <br />
Scope of Services <br />
Detailed engineering, procurement, construction supervision, commissioning & start-up assistance and overall project management <br />
<br />
<br />
<br />
Sapphire Gas Development Project 2003 / 2005 <br />
<br />
Client: Burullus Gas Company (Burullus) <br />
Project Description <br />
Extension to the onshore existing <br />
Scarab/Saffron and Simian/Sienna facility to treat 665 MMSCFD of natural gas produced from Sapphire offshore deepwater fields to feed the onshore Egyptian LNG Plant. <br />
Contract Type <br />
EPC Lump-sum turnkey – consortium <br />
Scope of Services <br />
Consortium leader, overall Project <br />
management, basic & detailed engineering, procurement services, construction supervision, commissioning & start-up assistance <br />
<br />
<br />
<br />
Simian / Sienna Gas Development Project 2003 / 2005 <br />
<br />
Client: Burullus Gas Company (Burullus) <br />
Project Description <br />
Extension to the onshore existing <br />
Scarab/Saffron facility to treat 665 MMSCFD of natural gas produced from Simian / Sienna offshore deep water fields to feed the onshore Egyptian LNG Plant. <br />
Contract Type <br />
EPC Lump-sum turnkey – consortium <br />
Scope of Services <br />
Consortium leader, overall project management, basic & detailed engineering, procurement services, construction supervision, commissioning & start-up assistance <br />
<br />
Maximization of C2 / C3 from Western Desert Gas Fields <br />
<br />
Client: The Egyptian Natural Gas Company (GASCO) <br />
Project Description <br />
The project aims to maximize C2 & C3 recovery in the Western Desert Gas Complex and Amerya Liquefied Petroleum Gas (LPG) plant. The recovered C2 & C3 in Amerya LPG plant will be transferred to Western Desert Gas Complex through a 12 inch pipeline to be processed within Western Desert Gas Complex, where the storage and loading facilities exist. <br />
The project was executed in three phases; the 1st tends to reach a production of 600 million standard cubic feet per day, the 2nd stage tends to reach a production of 800 million standard cubic feet per day, and finally to reach by the 3rd phase a total production of 900 million standard cubic feet per day. <br />
Contract Type <br />
Lump-sum for professional services / material supply disbursable <br />
Scope of Services <br />
EPCM: techno-economic / feasibility study, basic and detailed engineering, procurement, construction supervision, commissioning & start up assistance & overall project management <br />
<br />
<br />
Western Desert Gas Complex <br />
<br />
Client: The Egyptian Natural Gas Company (GASCO) <br />
Project Description <br />
The project aims to the treatment of 550 million standard cubic feet per day of natural gas produced from the western desert (Obaiyed, Salam and Tarek), to produce ethane & propane mixture of downstream ethylene and polyethylene production, commercial propane, sales gas, Liquefied Petroleum Gas (LPG) and condensate. <br />
Contract Type <br />
Lump-sum for professional services and disbursable for material supply <br />
Scope of Services <br />
EPCM: techno-economic / feasibility study, basic and detailed engineering, procurement, construction supervision, commissioning & start-up assistance and overall project management <br />
<br />
<br />
<br />
NGL Project at Port Said 2001 / 2004 <br />
<br />
Client: United Gas Derivatives Company (UGDC) (BP / Eni / GASCO) <br />
Project Description <br />
Installation of processing facilities for 1100 MMSCFD feed of natural gases produced from El- Gamil & HA’PY fields to produce propane, LPG, and condensates (dehydration package : 1100 MMSCFD molecular sieve one train). <br />
Contract Type <br />
Lump-sum for professional services and <br />
material supply disbursable <br />
Scope of Services <br />
EPCM: basic engineering review, detailed engineering and procurement services, construction supervision, commissioning & start-up assistance and overall project management <br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Damietta Export Facilities 2001 / 2004 <br />
<br />
Client: United Gas Derivatives Company (UGDC) <br />
Project Description <br />
Installation of Marine export facilities – cryogenic tank capacity (30,000m3) for propane storage produced from Port Said NGL process facilities <br />
Contract Type <br />
EPC turnkey – consortium (Enppi / Tractebel) – lump-sum for professional services, cost plus fees for material supply and construction work <br />
Scope of Services <br />
FEED & detailed engineering, procurement, construction, commissioning, & start-up assistance <br />
<br />
Professional Services for Denise Platform 2006 / 2008 <br />
<br />
Client: Belayim Petroleum Company (Petrobel) <br />
Project Description <br />
Upgrade of TNW2 existing platform to suit Denise gas field production, transmit additional capacity to onshore via 61 KM 32” offshore pipeline and 1 KM 32” pipeline onshore and upgrade of El Gamil onshore facilities. <br />
Contract Type <br />
Lump sum for professional services <br />
Scope of Services <br />
Basic & detailed engineering and procurement services <br />
<br />
Semman Field Development 2006 / 2008 <br />
<br />
Client: Belayim Petroleum Company (Petrobel) <br />
Project Description <br />
Installation of new Semman platform (tripod plus deck) and laying of new 18” sea line from Semman to existing Darfeel platform with total length 20 Km. <br />
Contract Type <br />
Professional services reimbursable <br />
Scope of Services <br />
Basic engineering review, detailed engineering and procurement services <br />
<br />
Taurt Onshore Detailed Engineering 2006 / 2007 <br />
<br />
Client: Gulf of Suez Petroleum Company (GUPCO) <br />
Project Description <br />
GUPCO intends to develop Taurt field through a sub-sea production system (SPS) that consists of 7 sub-sea wells tied with a manifold with well testing capability. <br />
Contract Type <br />
Professional services reimbursable <br />
Scope of Services <br />
Detailed Engineering for onshore part of Taurt gas field development project <br />
<br />
<br />
Offshore North Sinai Field Development ONS 2005 / 2007 - NOSPCO <br />
<br />
Client: The Egyptian Natural Gas Company (GASCO) <br />
Project Description <br />
Development of Tao offshore gas field, 60 km north of Rommana producing 130 MMSCFD of gas. The development includes offshore production wells, production platform, submarine pipeline, onshore gas treatment plant and sales gas pipeline, in addition to gas dehydration. <br />
Contract Type <br />
Lump-Sum for professional services and disbursable for material supply <br />
Scope of Services <br />
Detailed engineering for offshore topside facilities and onshore gas central processing facility, overall procurement services except pipelines and offshore structure steel, and construction supervision <br />
<br />
<br />
Temsah – 4 Platform 2005 / 2007 <br />
<br />
Client: Belayim Petroleum Company (Petrobel) <br />
Project Description <br />
Installation of a new platform: 4 legs, 12-slot unmanned fixed offshore production platform at 85 m water depth and a capacity of 10 MMSCMD gas plus 3000 BPD condensate. <br />
Contract Type <br />
Lump-sum for professional services <br />
Scope of Services <br />
Basic & detailed engineering and procurement services <br />
<br />
Baltim-N Platform 2003 / 2005 <br />
<br />
Client: Belayim Petroleum Company (Petrobel ) <br />
Project Description <br />
The project aims to install 4 legs 9-slots tubular steel frame jacket, and a fixed offshore production platform with a capacity of 4.7 MMSCMD Gas. Gas & Condensate are directed to Baltim east existing platform through an 18" Pipeline. <br />
Contract Type <br />
Lump sum for professional services <br />
Scope of Services <br />
Basic & detailed engineering and procurement services <br />
<br />
Barboni Platform 2003 / 2005 <br />
<br />
Client: Belayim Petroleum Company (Petrobel) <br />
Project Description <br />
The project aims to install a new platform in 91 m Water Depth, Capacity of 4.4 MMSCMD. Gas is transmitted to Noras P.L.E.M. via 26” subsea pipeline. <br />
Contract Type <br />
Lump-sum for professional services <br />
Scope of Services <br />
Basic & detailed engineering and procurement services <br />
<br />
Rashid-2 Platform Project <br />
2003 / 2004 <br />
<br />
Client: Rashid Petroleum Company (RASHPETCO) <br />
Project Description <br />
The project aims to install 4 legged unmanned steel jacket platform located at Rosetta 49 m water depth with a capacity of 265 MMSCFD and weighing 450 tons. The gas is transmitted through a 24” subsea pipeline to the onshore terminal for final processing, along with 3 (1X70 mm2) XLPE 12/20 KV 61 KM submarine cable with optical <br />
fiber bundle Contract Type <br />
Lump-sum for professional services <br />
Scope of Services <br />
Basic & detailed engineering and procurement services <br />
<br />
<br />
Amerya LPG Recovery Plant <br />
<br />
Client: Egyptian General Petroleum Corporation (EGPC) <br />
Project Description <br />
The project aims to install LPG recovery plant with inlet gas production capacity of 300 MMSCFD producing 360 T/D of LPG. The scope includes dehydration: 330 MMSCFD molecular sieve one train. <br />
Contract Type <br />
Lump-sum for professional services and disbursable for material supply and construction work <br />
Scope of Services <br />
Basic & detailed engineering and procurement services, construction supervision, commissioning & start-up assistance <br />
<br />
<br />
<br />
<br />
<br />
Damietta LNG project 2002 / 2005 <br />
<br />
Client: SEGAS - Union Fenosa – M.W. Kellogg – UK <br />
Project Description <br />
The Project aims to install LNG plant at Damietta with production of 4.7 MMTY of LNG. <br />
Contract Type <br />
S/C. from M.W. Kellogg – Lump-sum for engineering services, reimbursable for procurement services & <br />
construction supervision <br />
Scope of Services <br />
Detailed engineering for fractionators unit, procurement services & construction supervision <br />
<br />
<br />
<br />
<br />
Egyptian LNG Project 2002 / 2005 <br />
<br />
Client: The Egyptian Liquefied Natural Gas Company <br />
(ELNG) Project Description <br />
The 1st LNG project in Egypt, two trains LNG plant with a capacity of 3.6 MMTY LNG productions each, located In Idku, Beheira - Northern Coast of Egypt. <br />
Contract Type <br />
S/C. Lump sum for engineering services – Bechtel Houston <br />
Scope of Services <br />
Detailed engineering for: Inlet treating unit, buildings for power generation, LNG storage, flares, marine facilities & utilities <br />
<br />
<br />
<br />
Rosetta Gas Field Development 1998 / 2000 <br />
<br />
Client: Rashid Petroleum Company (RASHPETCO) <br />
Project Description <br />
The project aims to install offshore production platform with a capacity of 275 MMSCFD. Gas is transmitted through a 24” gas subsea P/L 67 km to onshore terminal. <br />
Contract Type <br />
Lump sum for basic & detailed engineering reimbursable for construction supervision, commissioning and start-up assistance <br />
Scope of Services <br />
Detailed engineering, procurement services, construction supervision, commissioning & startup assistance <br />
<br />
<br />
Transgulf LPG Plant <br />
<br />
Client: Egyptian General Petroleum Corporation (EGPC) <br />
Project Description <br />
Inlet gas production 130 MMSCFD - produce 960 T/D of LPG. The scope includes provision of molecular sieve dehydration package along with its regeneration 130 MMSCFD one train. <br />
Contract Type <br />
EPC turnkey - Lump sum for professional services and disbursable for material supply and construction works <br />
Scope of Services <br />
Detailed engineering, procurement services, construction supervision, commissioning and start-up assistance <br />
<br />
<br />
<br />
Qantara Field Development <br />
<br />
Client: Qantara Petroleum Company (QPC) <br />
Project Description <br />
Development of Qantara field with a total capacity of 8 MMSCFD to produce: <br />
- 6 MMSCFD sales gas transferred to GASCO gas grid manifold through a 6” Pipeline 0.4 Km. <br />
- 1000 BBL/Day transferred to the petroleum pipeline company 12”condensate pipeline through 4” pipeline to the Suez Refinery. Contract Type <br />
EPC Lump-sum turnkey <br />
Scope of Services <br />
Detailed engineering, material supply, construction, commissioning & start-up <br />
Bed 2 Field Development <br />
Client: Egyptian General Petroleum Corporation (EGPC) <br />
Project Description <br />
Bed 2 gas field includes a gas gathering and gas liquid separation, one gas production train, 180 MMCFD, train contains production separator, glycol dehydration unit and inter field pipelines between Bed-2 & Bed-3, in addition to third gas train in Bed-3. The scope also includes provision of TEG Dehydration package along with its regeneration. <br />
Contract Type <br />
Reimbursable MHR's <br />
Scope of Services <br />
Basic and detailed engineering as subcontractor through COMPRIMO <br />
<br />
Bed 3 Field Development <br />
Client: Egyptian General Petroleum Corporation (EGPC) <br />
Project Description <br />
Two identical gas conditioning trains, 90 MMSCFD capacity each, trains contains production separator, glycol dehydration unit, turbo-expander, LTS and sales gas compressor, the third train was added due to increase Bed-2 supply increase, oil production trains produces oil at 3 different levels with total capacity of 40,000 BBLD. The scope includes provision of Triethylene Glycol Dehydration package along with its regeneration. <br />
Contract Type <br />
Reimbursable MHR's <br />
Scope of Services <br />
Basic engineering, (subcontract of detailed engineering – International Bechtel Incorporation IBI UK) in addition to procurement services <br />
<br />
Abu Sannan Condensate Recovery Plant 1988 / 1990 <br />
<br />
Client: General Petroleum Company (GPC) <br />
Project Description <br />
Gathering of 85 MMSCFD of natural gas from three gas fields (T, Y & Bed 1) through pipelines and delivered to a central processing area where condensate is recovered and spiked into GPC existing crude pipelines. The scope also includes provision of Tri-ethylene Glycol Dehydration package along with its regeneration. <br />
Contract Type <br />
Lump sum for professional services & disbursable for material supply and construction work reimbursable <br />
Scope of Services <br />
Detailed engineering, material supply, construction, commissioning & start-up <br />
<br />
<br />
<br />
Abu Madi LPG Recovery <br />
<br />
Client: Belayim Petroleum Company (Petrobel) <br />
Project Description <br />
The plant is designed to treat 260 MMSCFD produced at existing LTS units in order to recover LPG and condensate and deliver sales gas to users - dehydration: 260 MMSCFD Molecular Sieve. <br />
Contract Type <br />
Reimbursable maximum ceil man-hours <br />
Scope of Services <br />
Project management including basic and detailed engineering review and procurement services, in addition to partial detailed engineering and survey services as subcontractor to Snamprogetti</div>Abarrelfull