Difference between revisions of "Zhejiang Zhoushan LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 13: | Line 13: | ||
=== Technical Details === | === Technical Details === | ||
− | * Storage capacity: | + | * Storage capacity: 2x 160,000 m3 tanks |
* Unloading capacity: | * Unloading capacity: | ||
* Send out capacity: | * Send out capacity: | ||
* Constructor: | * Constructor: | ||
+ | ** TGE: EPC contractor for the tanks | ||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === |
Revision as of 16:37, 6 January 2022
Contents
Summary Information
- Ownership: ENN
- Website: ENN Natural Gas Co
- Location:
- Capacity: 8.0 million tons/annum
- Status:
Brief Description
- China's first private owned major terminal
Technical Details
- Storage capacity: 2x 160,000 m3 tanks
- Unloading capacity:
- Send out capacity:
- Constructor:
- TGE: EPC contractor for the tanks
Ongoing Projects/Project Status
Suppliers / Customers
- Suppliers: Chevron is supplying 0.5 mtpa from the Gorgon LNG Terminal
- Customers:
History
- 2016 - ENN signed an LNG suply agreement with Chevron
- 2018 - Terminal operations begin
Other Information
-