Yemen Marib Gas Pipeline

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Source: Marib Gas Field
  • Destination: Bal Haf in the Gulf of Aden
  • Ownership: Yemen LNG
  • Website:
  • Length: 320 kilometres ( miles)
  • Capacity: per day
  • Status: Operating

+++ Details

  • The pipeline includes 320km of 38 inch gas pipeline and 25km of 20 inch pipeline together with a number of ancillary structures
  • The pipeline transports gas from the Marib Gas Field to the Yemen LNG Terminal

+++ Contractors

  • **AMEC:** engineering, procurement and construction

+++ History

  • 2005 - AMEC awarded engineering, procurement and construction contract

+++ Other Information

  • -

+++ Links

  1. AMEC partnership wins Yemen pipeline contract