Difference between revisions of "Yantai Shandong LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(5 intermediate revisions by the same user not shown) | |||
Line 14: | Line 14: | ||
=== Technical Details === | === Technical Details === | ||
− | * Storage capacity: | + | * Storage capacity: 5x 200,000 m3 tanks |
* Unloading capacity: | * Unloading capacity: | ||
− | * Send out capacity: | + | * Send out capacity: 40 million m3 of gas per day |
* Constructor: | * Constructor: | ||
+ | ** China Tianchen / Harbin Electric: EPC contract | ||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
− | + | * The terminal is scheduled for commissioning in [[LNG Terminal Projects to be Completed in 2023 | 2023]] | |
+ | * A second phase is planned, which would expand caacity to 10 mtpa by 2025 | ||
=== Suppliers / Customers === | === Suppliers / Customers === | ||
Line 30: | Line 32: | ||
* 2020 - The National Development and Reform Commission of China officially approved construction | * 2020 - The National Development and Reform Commission of China officially approved construction | ||
+ | * 2020 - EPC contract signed | ||
=== Other Information === | === Other Information === | ||
− | - | + | * In the long term, Yantai LNG is approved to feature six LNG berths accepting vessels up to 266,000 cubic meters in capacity and twenty-two 200,000-cubic-meter LNG storage tanks |
+ | |||
=== Links === | === Links === | ||
# [https://abarrelfull.blogspot.com/2022/01/yantai-lng-gets-approval-to-build.html Yantai LNG gets approval to build receiving terminal in northern China] | # [https://abarrelfull.blogspot.com/2022/01/yantai-lng-gets-approval-to-build.html Yantai LNG gets approval to build receiving terminal in northern China] | ||
+ | # [https://abarrelfull.blogspot.com/2022/01/yantai-lng-receiving-terminals-epc.html Yantai LNG Receiving Terminal's EPC Contract Signed Successfully] | ||
[[category:LNG]] | [[category:LNG]] | ||
[[category:China]] | [[category:China]] |
Latest revision as of 16:39, 7 January 2022
Contents
Summary Information
- Ownership: Poly-GCL Pan-Asia International Energy
- Website: http://www.yantailng.com/
- Location: West Yantai Port, Shandong Province, China
- Capacity: 5.0 million tons/annum
- Status: Under construction
Brief Description
- The terminal is located in a petrochemical-dedicated port area in West Yantai Port, Shandong Province, China.
- Phase I includes one 266,000 m3 capacity receiving berth, five 200,000 m3 LNG storage tanks, one 50,000 m3 transshipment berth, and regasification facilities.
- The terminal will receive up to 5 MTPA of LNG and regasify up to 40 million m3 of gas per day.
Technical Details
- Storage capacity: 5x 200,000 m3 tanks
- Unloading capacity:
- Send out capacity: 40 million m3 of gas per day
- Constructor:
- China Tianchen / Harbin Electric: EPC contract
Ongoing Projects/Project Status
- The terminal is scheduled for commissioning in 2023
- A second phase is planned, which would expand caacity to 10 mtpa by 2025
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2020 - The National Development and Reform Commission of China officially approved construction
- 2020 - EPC contract signed
Other Information
- In the long term, Yantai LNG is approved to feature six LNG berths accepting vessels up to 266,000 cubic meters in capacity and twenty-two 200,000-cubic-meter LNG storage tanks