Yanga Sendji Oil Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: Total
  • Country: Congo
  • Location:
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • A satellite of the Yanga field, Libondo consists of wellhead platforms tied back to production facilities

+++ Contractors

  • **Saipem:**
    • Project Detail Engineering, Procurement, construction and Commissioning Services (2011)
    • Pipelaying on The Tchibouela, Yanga, Sendji and Tchendo Fields (1992)
    • Conceptual Design for Yanga - YAFP and SEFP Platforms Compressors (1982)

++++ Libondo:

  • **Tecon:** Detailed structural design of the Libondo platform deck, jacket and foundations
  • **Saipem:** Wellhead platform and sealines
  • **Rosetti Marino:** Detail design, Fabrication engineering, Procurement, Jacket prefabrication , Deck Construction, On-shore Commissioning, Load-out, Sea Fastening, Hook-up, Commissioning, Revamping of two existing platforms, Assistance to Start up


+++ History

+++ Geology

+++ Links

  1. Tecon Platform References
  2. Rosetti Marino Platform References
  3. Saipem Fixed Offshore Production Facilities Project References
  4. JDR Delivers Subsea Power Cables For Total’s Libondo Field