Yadana Gas Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: Total
  • Country: Myanmar
  • Location: offshore Blocks M5 and M6
  • Production start: 1998
  • Partners: Total E&P Myanmar - 31.24%, Unocal Myanmar Offshore (UMOL) - 28.26%, PTTEP International Limited (PTTEPI) - 25.5%, Myanma Oil and Gas Enterprise (MOGE) - 15%
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • Gas produced on the field is delivered primarily to PTT to be used in Thai power plants. The Yadana field also supplies the domestic market via a land pipeline and, since June 2010, via a sub-sea pipeline built and operated by Myanmar’s state-owned company MOGE.

+++ Contractors

  • **HHI:** EPIC: MP Compression Platform, Pile & Bridge : 8,120 Ton
  • **Swiber:** Offshore installation works for 150 kilometres gas pipelines
  • **Saipem:** Installation of pipelines
  • **Thai Nippon Steel Sumikin:**
    • Yadana Wellhead Platform & Modification Work
    • Yadana Production Platform Modification Work

+++ History

  • 1992 - Production sharing contract signed
  • 1998 - First production
  • 2006 - Gas sales contract increased
  • 2008 - Compression project completed
  • 2022 - Total announced it was withdrawing from the project

+++ Geology

Links

  1. Total: Exploration & Production Operations in Asia-Pacific
  2. Yadana Project, PTTEP
  3. Serimax Asia Pipeline References
  4. Hyundai Heavy Industries Platform References
  5. Thai Nippon Steel Sumikin Engineering Construction Platform
  6. Saipem Asia Pipeline References
  7. Signing of Amendment Agreement to the Yadana Export Gas Sales Agreement
  8. Swiber Secures Maiden Myanmar Offshore Installation Project Worth US$77.0 Million
  9. TotalEnergies withdraws from Myanmar