Wrangler Oil Pipeline Project

From A Barrel Full
Revision as of 10:25, 3 May 2024 by Abarrelfull (talk | contribs) (Created page with "* **The project has been cancelled** +++ Summary Information * Source: Cushing, Oklahoma * Destination: Houston, Texas * Ownership: 50/50 joint venture partnership of Enbrid...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • **The project has been cancelled**

+++ Summary Information

  • Source: Cushing, Oklahoma
  • Destination: Houston, Texas
  • Ownership: 50/50 joint venture partnership of Enbridge (U.S.) Inc. and Enterprise Products Partners L.P.
  • Website: http://www.wranglerpipeline.com/
  • Length: kilometres (500 miles)
  • Capacity: 800,000 barrels of oil per day
  • Crude Type: light and medium grades of crude oil

+++ The Route

  • Phase 1 originates at an Enbridge terminal in Cushing, Okla. and extends to the Enterprise ECHO Terminal southeast of Houston, Texas.
  • Phase 2, when developed, will extend from ECHO Terminal to near Port Arthur, Texas.

+++ Pipeline Status

  • Planning

+++ History

  • 2011 - Open Season launched to secure commitments
  • 2011 - The project was cancelled, and replaced with the Seaway Crude Oil Pipeline project

+++ Other Information

  • This is one of a number of projects looking to solve the WTI conundrum

+++ Links

  1. Project Homepage
  2. Project Flyer
  3. Enterprise and Enbridge to Develop Crude Oil Pipeline from Cushing to the Gulf Coast
  4. Enterprise and Enbridge to Conduct Open Seasons for Seaway Pipeline Expansion and New Crude Oil Pipeline to Port Arthur/Beaumont