Woollybutt Oil Field

From A Barrel Full
Revision as of 07:38, 29 November 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: ENI * Country: Australia * Location: 80 km from the town of Onslow * Production start: 2003 * Partners: ENI, Exxon, Tap Oil * Type: Oil * Estim...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Operator: ENI
  • Country: Australia
  • Location: 80 km from the town of Onslow
  • Production start: 2003
  • Partners: ENI, Exxon, Tap Oil
  • Type: Oil
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The Woollybutt Field is located in permit WA-25-L off the coast of Western Australia, approximately 40km west of Barrow Island
  • During production, the field development consisted of four subsea wells (WB1, WB2A, SB1 and WB4) that produced through subsea wellheads and flexible flowlines to a double-hulled FPSO vessel, Four Vanguard FPSO
  • The field has ceased production


+++ Contractors

  • **Keppel:** FPSO construction
  • **Premuda:** carried out the detailed design, procurement, fabrication, tanker conversion and FPSO installation for the development
  • **NKT Flexibles:** Risers
  • **ICON Engineering:** Project Management and Design Engineering for the Scalybutt Tie back Project

+++ History

  • 1997 - Woollybutt Oil Field discovered
  • 2003 - FSPO delivered
  • 2003 - Woollybutt Oil Field production started
  • 2008 - Woollybutt South Development completed
  • 2012 - Production on the field ceased

+++ Geology

+++ Links

  1. Woollybutt, Decommissioning
  2. NKT Flexibles, Woollybutt, Australia
  3. Premuda, Woollybutt Project Overview
  4. [[[Icon Engineering Platform References]]]
  5. Keppel Shipyard reaffirmed as a preferred yard by Vanguard with the completion of their first FPSO
  6. Eni: started production from Woollybutt field, Australia
  7. Completion of Woollybutt South Development and Woollybutt Production Start Up