Windermere Gas Field
Revision as of 16:33, 3 September 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: RWE * Country: UK * Location: * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume: +++ Descripti...")
Summary Information
- Operator: RWE
- Country: UK
- Location:
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The Windermere development is a gas producing normally unattended installation (NUI) located in SNS Block 49/09b
- The Windermere platform is a fixed three-legged jacket
- The platform is tied back via a 7 kilometre long 8-inch pipeline to the Centrica Energy Upstream (Centrica), operated ST-1 platform that is part of the Markham Gas Field complex
+++ Contractors
- -
+++ History
- 1996 - Development approval granted
- 1997 - The Windermere platform was installed
+++ Geology
- A thin, basal aeolian sandstone is top-sealed by lacustrine Silverpit Formation, clay stones and sourced by the underlying Westphalian Coal Measures.
+++ Links