Wenchang 13/1 and 13/2 Oil Fields

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: CNOOC
  • Country: China
  • Location: South China Sea
  • Production start: 2002
  • Partners: CNOOC -60%, Husky - 40%
  • Type: Oil / Gas
  • Estimated Reserves: Estimated proved reserves of 83 million barrels
  • Production Volume:

+++ Description

  • The field utilises the Nanhai Endeavor FPSO, a permanent single turret moored FPSO designed for typhoon populated area

+++ Contractors

  • **Dalian New Shipyard:** FPSO construction
  • **CNOOC Engineering:** WC14-3 jacket fabrication
  • **CSE:** WEN13-1/13-2 Jackets & Topsides

+++ History

  • 2001 - FPSO completed
  • 2002 - First oil produced

+++ Geology

+++ Links

  1. International Protective Coatings Platform References
  2. The A jacket of WC14-3 was prefabricated in Qingdao fabrication yard
  3. FPSO "Nanhai Endeavor" Launched Ahead of Schedule
  4. Wenchang First Oil Bolsters Husky Energy’s International Growth
  5. Successful Installation of COOEC Wenchang 14-3A Jacket