Difference between revisions of "Wandoo Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Vermilion * Country: Australia * Location: * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume:...") |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Operator: Vermilion | * Operator: Vermilion | ||
* Country: Australia | * Country: Australia | ||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* Wandoo field is located approximately 80 kilometres north-west of the town of Karratha. | * Wandoo field is located approximately 80 kilometres north-west of the town of Karratha. | ||
* The field consists of the Wandoo A Unmanned Monopod; Wandoo B Production Platform and a Single Point Tanker Mooring and Offloading Facility. Wandoo B is a concrete gravity structure connected to Wandoo A by an undersea pipeline. | * The field consists of the Wandoo A Unmanned Monopod; Wandoo B Production Platform and a Single Point Tanker Mooring and Offloading Facility. Wandoo B is a concrete gravity structure connected to Wandoo A by an undersea pipeline. | ||
Line 15: | Line 15: | ||
* A floating hose is used in transferring the oil from the CALM Buoy to export tankers situated at a mooring facility. | * A floating hose is used in transferring the oil from the CALM Buoy to export tankers situated at a mooring facility. | ||
− | + | === Contractors === | |
− | * | + | * '''ICON Engineering:''' |
+ | ** Feasibility of a platform extension with tensioned conductors | ||
+ | ** Operating and Abandonment Liability Assessment | ||
− | + | === History === | |
* 1997 - Platform installed | * 1997 - Platform installed | ||
* 2007 - Vermilion increased its stake to 100% | * 2007 - Vermilion increased its stake to 100% | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
# [[Offshore Oil And Gas Production Platforms In Australia]] | # [[Offshore Oil And Gas Production Platforms In Australia]] | ||
# [[Icon Engineering Platform References]] | # [[Icon Engineering Platform References]] | ||
# [http://killajoules.wikidot.com/archive:vermilion-energy-trust-wandoo-acquisition Vermilion Energy Trust – Wandoo Acquisition] | # [http://killajoules.wikidot.com/archive:vermilion-energy-trust-wandoo-acquisition Vermilion Energy Trust – Wandoo Acquisition] |
Latest revision as of 15:54, 30 January 2024
Summary Information
- Operator: Vermilion
- Country: Australia
- Location:
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- Wandoo field is located approximately 80 kilometres north-west of the town of Karratha.
- The field consists of the Wandoo A Unmanned Monopod; Wandoo B Production Platform and a Single Point Tanker Mooring and Offloading Facility. Wandoo B is a concrete gravity structure connected to Wandoo A by an undersea pipeline.
- Oil is stored in the concrete structure supporting the Wandoo B processing facilities and then offloaded through flexible pipelines to a CALM Buoy located 1.2 kilometres north of the Wandoo B platform.
- A floating hose is used in transferring the oil from the CALM Buoy to export tankers situated at a mooring facility.
Contractors
- ICON Engineering:
- Feasibility of a platform extension with tensioned conductors
- Operating and Abandonment Liability Assessment
History
- 1997 - Platform installed
- 2007 - Vermilion increased its stake to 100%