Difference between revisions of "Volgograd Refinery Project"
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === Ownership: Lukoil Website: http://www.lukoil.com/ List of Lukoil Refineries Wiki Page: Volgograd Refinery Location: Volvograd, Southern Russia Capa...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | Ownership: Lukoil | + | * Ownership: Lukoil |
− | Website: http://www.lukoil.com/ | + | * Website: http://www.lukoil.com/ |
− | List of Lukoil Refineries | + | * List of [[Lukoil Refineries]] |
− | Wiki Page: Volgograd Refinery | + | * Wiki Page: [[Volgograd Refinery]] |
− | Location: Volvograd, Southern Russia | + | * Location: Volvograd, Southern Russia |
− | Capacity: 11.25 million tons/annum & 225.000 bbl/day | + | * Capacity: |
− | Nelson Complexity: | + | ** Before: 11.25 million tons/annum & 225.000 bbl/day |
− | Project Stage: | + | ** After: 14.5 million tons/annum & 290.000 bbl/day |
− | + | * Nelson Complexity: 6.9 | |
− | + | * Project Stage: Completed 2016 | |
+ | * Budget: | ||
+ | |||
=== The Project === | === The Project === | ||
Project Type: Upgrade | Project Type: Upgrade |
Revision as of 18:52, 19 March 2020
Summary Information
- Ownership: Lukoil
- Website: http://www.lukoil.com/
- List of Lukoil Refineries
- Wiki Page: Volgograd Refinery
- Location: Volvograd, Southern Russia
- Capacity:
- Before: 11.25 million tons/annum & 225.000 bbl/day
- After: 14.5 million tons/annum & 290.000 bbl/day
- Nelson Complexity: 6.9
- Project Stage: Completed 2016
- Budget:
The Project
Project Type: Upgrade Project Summary: Construction of delayed coking unit with annual capacity of 1 mln tons (to be commissioned during 2011) Construction of a unit for hydrotreatment of diesel fuel by 2011 Construction of a hydrocracker complex Construction of a FCC unit by 2015 === Main Contractors Técnicas Reunidas: Front End Engineering and Design (FEED) of a hydrocracker complex Engineering and supply of the equipment and materials, construction, pre-commissioning as well as support for commissioning of hydrocracker complex VNIPIneft won the tender and signed a contract to design the distillation column === Refining Units hydrocracker complex - 3.5 Million tpa Delayed Coker - Will replace 2 existing obsolete units Fluidised Catalytic Cracker - 1.5 Million tpa Diesel Hydrotreatment === Terminal Capacity Crude Oil: Refined Products: === Crude Supply Refines a blend of light West Siberian and Lower Volga crudes Products Produced The project will increase the proportion of light products The project will increase the output of Euro-5 diesel fuel by 2,4 million tonnes per year
History
2011 - Tecnicas Reunidas awarded the FEED for the hydrocracker complex 2011 - Construction of the delayed coker completed 2013 - Técnicas Reunidas awarded EPC contract for the hydrocracker complex
Other Information
-
Links
- Oil Refining in Russia. Majors Plan Upgrades to Raise Product Quality
- Técnicas Reunidas awarded a Project in Russia and another in Turkey
- LUKoil finished building a delayed coking unit at the Volgograd Refinery
- Design Installation ELOU-AVT-6 OAO LUKOIL-Volgogradneftepererabotka
- LUKOIL refineries development strategy
- Lukoil Launches A Major Modernization Project At Volgograd Refinery
- Técnicas Reunidas has been awarded a major contract for the Lukoil´s refinery in Volgodgrad, Russia