− | * The Victor gas field was developed using a Normally Unmanned Installation (NUI), operated from the nearby [[Viking Gas Field]]. Prior to Cessation of Production, the volumes were processed at the Viking facility and exported to the terminal facilities at [[Theddlethorpe Gas Processing Plant]] via the Viking Transportation System (VTS) | + | * The Victor gas field was developed using a Normally Unmanned Installation (NUI), operated from the nearby [[Viking Gas Field]]. Prior to Cessation of Production, the volumes were processed at the Viking facility and exported to the terminal facilities at [[Theddlethorpe Gas Processing Plant]] via the Viking Transportation System (VTS) and [[Lincolnshire Offshore Gas Gathering System (LOGGS)]] |
=== Contractors === | === Contractors === |
Latest revision as of 10:54, 31 January 2024
Summary Information
- Operator:
- Country:
- Location:
- Production start:
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The Victor gas field was developed using a Normally Unmanned Installation (NUI), operated from the nearby Viking Gas Field. Prior to Cessation of Production, the volumes were processed at the Viking facility and exported to the terminal facilities at Theddlethorpe Gas Processing Plant via the Viking Transportation System (VTS) and Lincolnshire Offshore Gas Gathering System (LOGGS)
Contractors
- Heerema Marine Contractors: Victor J-Block
- FoundOcean: Victor North West Template
History
- 1983 - Field development approved
- 1984 - Platform installed
- 2016 - Production ceased