Difference between revisions of "Vega Pleyade Offshore Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 12: | Line 12: | ||
=== Contractors === | === Contractors === | ||
− | * Dragados Offshore: engineering, procurement, construction (EPC), including in-house detail design, onshore commissioning, load-out and sea-fastening of the WHP topsides (1.500 tonnes), 4-legged jacket (1.000 tonnes), and piles | + | * '''Dragados Offshore:''' engineering, procurement, construction (EPC), including in-house detail design, onshore commissioning, load-out and sea-fastening of the WHP topsides (1.500 tonnes), 4-legged jacket (1.000 tonnes), and piles |
+ | * '''Serimax:''' Pipelines | ||
=== History === | === History === | ||
Line 23: | Line 24: | ||
=== Links === | === Links === | ||
+ | # [[Serimax Pipeline References]] | ||
# [https://abarrelfull.blogspot.com/2023/03/sail-away-vega-pleyade-project-from.html Sail Away Vega Pleyade Project from Puerto Real Yard, Cadiz, Spain] | # [https://abarrelfull.blogspot.com/2023/03/sail-away-vega-pleyade-project-from.html Sail Away Vega Pleyade Project from Puerto Real Yard, Cadiz, Spain] | ||
# [https://abarrelfull.blogspot.com/2023/03/argentina-total-starts-up-vega-pleyade.html Argentina: Total starts up Vega Pleyade offshore project in Tierra del Fuego] | # [https://abarrelfull.blogspot.com/2023/03/argentina-total-starts-up-vega-pleyade.html Argentina: Total starts up Vega Pleyade offshore project in Tierra del Fuego] |
Latest revision as of 17:54, 31 January 2024
Summary Information
- Country: Argentina
- Location: Offshore Southern Argentina
- Production start: 2016
- Partners: TotalEnergies 37.5%, Harbour Energy (37.5%) and Pan American Sur (25%).
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The Vega Pleyade development consists of a wellhead platform in 50 meters water depth, tied back via a 77 kilometer offshore pipeline to the Total-operated Rio Cullen and Cañadon Alfa onshore treatment facilities
Contractors
- Dragados Offshore: engineering, procurement, construction (EPC), including in-house detail design, onshore commissioning, load-out and sea-fastening of the WHP topsides (1.500 tonnes), 4-legged jacket (1.000 tonnes), and piles
- Serimax: Pipelines
History
- 2015 - The platform is completed
- 2016 - First gas produced
- 2023 - Harbour Energy acquired Wintershall's stake