Difference between revisions of "Vantage Ethane Pipeline"

From A Barrel Full
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
  
 
* Source: Tioga, North Dakota, USA
 
* Source: Tioga, North Dakota, USA
Line 9: Line 9:
 
* Status: In operation
 
* Status: In operation
  
+++ Details
+
=== Details ===
 
* The pipeline carries liquid ethane from [[Tioga Gas Processing Plant | a processing plant near Tioga, North Dakota]], through Saskatchewan to a gathering system near Empress, Alberta.  
 
* The pipeline carries liquid ethane from [[Tioga Gas Processing Plant | a processing plant near Tioga, North Dakota]], through Saskatchewan to a gathering system near Empress, Alberta.  
 
* The Canadian portion of the Vantage Pipeline consists of approximately 580 km of pipeline and related facilities, of which approximately 574 km is in Saskatchewan and 4.5 km in Alberta.  
 
* The Canadian portion of the Vantage Pipeline consists of approximately 580 km of pipeline and related facilities, of which approximately 574 km is in Saskatchewan and 4.5 km in Alberta.  
Line 15: Line 15:
 
* The pipeline capacity was expanded from 40,000 to 68,000 barrels per day in 2016
 
* The pipeline capacity was expanded from 40,000 to 68,000 barrels per day in 2016
  
+++ History
+
=== History ===
 
* 2011 - National Energy Board Receives Application for Vantage Pipeline Project  
 
* 2011 - National Energy Board Receives Application for Vantage Pipeline Project  
 
* 2012 - NEB Approves Vantage Pipeline Project
 
* 2012 - NEB Approves Vantage Pipeline Project
Line 22: Line 22:
 
* 2016 - Expansion completed
 
* 2016 - Expansion completed
  
+++ Other Information
+
=== Other Information ===
 
* -
 
* -
  
+++ Links
+
=== Links ===
 
# [[EIA Liquids Pipeline Projects 2015-2020]]
 
# [[EIA Liquids Pipeline Projects 2015-2020]]
 
# [http://www.vantagepipeline.state.gov/ Project Background]
 
# [http://www.vantagepipeline.state.gov/ Project Background]
Line 32: Line 32:
 
# [http://killajoules.wikidot.com/blog:5413 Pembina Pipeline Corporation To Acquire Vantage Pipeline And An Interest In Associated Assets For US$650 Million]
 
# [http://killajoules.wikidot.com/blog:5413 Pembina Pipeline Corporation To Acquire Vantage Pipeline And An Interest In Associated Assets For US$650 Million]
 
# [http://killajoules.wikidot.com/blog:5739 Pembina Pipeline Corporation To Expand Vantage Pipeline]
 
# [http://killajoules.wikidot.com/blog:5739 Pembina Pipeline Corporation To Expand Vantage Pipeline]
 +
 +
[[category:Pipeline]]
 +
[[category:Canada]]
 +
[[category:USA]]
 +
[[category:Pembina]]

Latest revision as of 06:24, 4 October 2023

Summary Information

  • Source: Tioga, North Dakota, USA
  • Destination: Empress, Alberta, Canada
  • Ownership: Vantage Pipeline Canada (Pembina )
  • Website: https://www.pembina.com/
  • Length: 580 kilometres ( miles)
  • Capacity: 68,000 barrels per day (bpd)
  • Status: In operation

Details

  • The pipeline carries liquid ethane from a processing plant near Tioga, North Dakota, through Saskatchewan to a gathering system near Empress, Alberta.
  • The Canadian portion of the Vantage Pipeline consists of approximately 580 km of pipeline and related facilities, of which approximately 574 km is in Saskatchewan and 4.5 km in Alberta.
  • In total, approximately 525 km of the pipeline is along or adjacent to existing pipeline and road right-of-way.
  • The pipeline capacity was expanded from 40,000 to 68,000 barrels per day in 2016

History

  • 2011 - National Energy Board Receives Application for Vantage Pipeline Project
  • 2012 - NEB Approves Vantage Pipeline Project
  • 2014 - Pembina acquired the pipeline
  • 2015 - Expansion project launched
  • 2016 - Expansion completed

Other Information

  • -

Links

  1. EIA Liquids Pipeline Projects 2015-2020
  2. Project Background
  3. National Energy Board Receives Application for Vantage Pipeline Project
  4. NEB Approves Vantage Pipeline Project
  5. Pembina Pipeline Corporation To Acquire Vantage Pipeline And An Interest In Associated Assets For US$650 Million
  6. Pembina Pipeline Corporation To Expand Vantage Pipeline