Vampire, Viscount and Valkyrie Gas Fields

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: Conoco Phillips
  • Country: UK
  • Location: 049/16
  • Production start:
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The Vampire development consists of a single a normally unmanned minimum facility fixed steel Platform
  • The Viscount development will consists of three production wells, a normally unmanned minimum facility fixed steel Platform and a subsea pipeline tied in to the Vampire platform
  • Valkyrie consists of a single extended reach well into the Valkyrie reservoir from the existing Vampire platform
  • Gas is transported via the Lincolnshire Offshore Gas Gathering System (Loggs) to the Theddlethorpe Gas Processing Plant

+++ Contractors

  • **Odebrecht:** T&I for Vampire platform

+++ History

  • 1998 - Vampire development approval granted
  • 2002 - Development approval for Viscount
  • 2004 - Valkyrie granted development approval

+++ Geology

+++ Links

  1. List Of Oil and Gas Production Platforms In The UK
  2. UK Oil and Gas Fields by Approval Date
  3. Seaway Heavy Lifting Europe Oil And Gas References