Difference between revisions of "Valiant, Vanguard and Vulcan Gas Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Conocophillips * Country: UK * Location: Southern North Sea * Production start: * Partners: BP * Type: Gas * Estimated Reserves: * Productio...") |
Abarrelfull (talk | contribs) |
||
Line 20: | Line 20: | ||
* **Saipem:** Installation of sealines in Valiant Field | * **Saipem:** Installation of sealines in Valiant Field | ||
* **Heerema Marine Contractors:** | * **Heerema Marine Contractors:** | ||
− | + | ** Vanguard & Vulcan accommodation | |
− | + | ** North Valiant I & II and Compression | |
+++ History | +++ History |
Latest revision as of 16:27, 3 September 2023
Summary Information
- Operator: Conocophillips
- Country: UK
- Location: Southern North Sea
- Production start:
- Partners: BP
- Type: Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The V-Fields comprise four separate gas accumulations – North Valiant, South Valiant, Vanguard and Vulcan – in the Southern North Sea.
- The Vulcan field has 2 unmanned platforms, Vulcan 1&2
- The Valiant field has three platforms, Valiant North 1 & 2 and Valiant South
- The Vanguard field has just one platform
- All of the platforms are normally unmanned
- Gas is transported on the Lincolnshire Offshore Gas Gathering System (LOGGS) to the Theddlethorpe Gas Processing Plant
+++ Contractors
- **Saipem:** Installation of sealines in Valiant Field
- **Heerema Marine Contractors:**
- Vanguard & Vulcan accommodation
- North Valiant I & II and Compression
+++ History
- 1986 - South Valiant, Vanguard And Vulcan approved
- 1987 - North Valiant approved
- 1988 - All of the platforms installed
+++ Geology
+++ Links