Difference between revisions of "Ust Luga LNG Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 14: | Line 14: | ||
* Storage capacity: | * Storage capacity: | ||
* Constructor: | * Constructor: | ||
− | * Licensor: | + | * Licensor: Linde |
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
Line 20: | Line 20: | ||
=== Suppliers / Customers === | === Suppliers / Customers === | ||
− | * Suppliers:Gas fields on the Yamal peninsula, including [[Tambeyskoye Gas Field]] | + | * Suppliers: Gas fields on the Yamal peninsula, including [[Tambeyskoye Gas Field]] |
* Customers: | * Customers: | ||
Latest revision as of 13:22, 10 January 2022
Contents
Summary Information
- Ownership: RusChemAlliance LLC, a 50-50 special-purpose venture of PJSC Gazprom and JSC RusGazDobycha
- Website: https://www.baltchemc.ru/
- Location: Ust Luga
- Capacity: 13 million tons/annum
- Status: Planned
Brief Description
- A two train liquefaction plant with 13 million tons of capacity
- The plant will be built together with a gas processing complex with annual capacity of 45 billion cubic metres and a major olefins/polyolefins plant
Technical Details
- Storage capacity:
- Constructor:
- Licensor: Linde
Ongoing Projects/Project Status
- Commissioning is expected in 2026
Suppliers / Customers
- Suppliers: Gas fields on the Yamal peninsula, including Tambeyskoye Gas Field
- Customers:
History
- -
Other Information
- -