Umuroa FPSO

From A Barrel Full
Revision as of 17:35, 3 February 2024 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Name: Umuroa FPSO * Field: Tui Oil Field * Country: New Zealand * Ownership: Prosafe * Website: * Operated By: * Capacity: 50 000 bpd * Year of C...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Name: Umuroa FPSO
  • Field: Tui Oil Field
  • Country: New Zealand
  • Ownership: Prosafe
  • Website:
  • Operated By:
  • Capacity: 50 000 bpd
  • Year of Completion: 2007

+++ Brief Description

  • The FPSO Umuroa will be capable of producing 120 000 barrels of fluid per day, 50 000 barrels of oil per day and 118 000 barrels of water per day, with a storage capacity of 730 000 barrels.
  • The vessel which is a converted Suezmax, is moored in 120 metres of water and is Prosafe's first FPSO offshore New Zealand

+++ Contractors

  • **Keppel:** FPSO conversion
  • **Prosafe:** Engineering, procurement, construction, installation and commissioning.
  • ** Dyna-Mac:** Three units of topside modules
  • **Technics Offshore:** Design of the process engineering, detail engineering & calculations, procurement and construction of the gas compression modules
  • **Vme Process:** Electrostatic Coalescer Internals
  • **Kavin Engineering:** Deluge Calculation and Drawing


+++ Status

  • In operation

+++ History

  • 2007 - FPSO delivered

+++ Other Information

  • -

+++ Links

  1. Kavin Engineering FPSO References
  2. VME Process FPSO References
  3. Technics Oil & Gas Limted Secures S$13.8 Million Gas Compressor Contract For New Zealand FPSO
  4. Naming ceremony of the FPSO Umuroa
  5. First oil on FPSO Umuroa