Summary Information
+
=== Summary Information ===
 
* Operator: ADMA OPCO
 
* Operator: ADMA OPCO
 
* Country: UAE - Abu Dhabi
 
* Country: UAE - Abu Dhabi
Line 9: Line 9:
 
* Production Volume:
 
* Production Volume:
  
+++ Description
+
=== Description ===
 
* In the first development phase, oil production from the Umm Lulu Oil Field has commenced by utilizing existing facilities of the Umm Al-Dalkh Oil Field
 
* In the first development phase, oil production from the Umm Lulu Oil Field has commenced by utilizing existing facilities of the Umm Al-Dalkh Oil Field
 
* The oil produced from the Umm Lulu Oil Field in the first development phase is transported via an existing subsea pipeline to Zirku Island
 
* The oil produced from the Umm Lulu Oil Field in the first development phase is transported via an existing subsea pipeline to Zirku Island
Line 15: Line 15:
 
* The project will tie into ADMA-OPCO's SARB project for further processing at the Zirku Island facilities.
 
* The project will tie into ADMA-OPCO's SARB project for further processing at the Zirku Island facilities.
  
+++ Contractors
+
=== Contractors ===
* **AMEC:** Project Management Consultancy (PMC) services contract
+
* '''AMEC:''' Project Management Consultancy (PMC) services contract
* **Fluor:**  front-end engineering and design (FEED)
+
* '''Fluor:''' front-end engineering and design (FEED)
* **Technip:** Detailed engineering, procurement, fabrication, offshore installation, commissioning and start-up of a large offshore super complex
+
* '''Technip:''' Detailed engineering, procurement, fabrication, offshore installation, commissioning and start-up of a large offshore super complex
  
+++ History
+
=== History ===
 
* 2010 - Fluor awarded the front-end engineering and design (FEED) contract
 
* 2010 - Fluor awarded the front-end engineering and design (FEED) contract
 
* 2012 - AMEC awarded PMC services contract  
 
* 2012 - AMEC awarded PMC services contract  
Line 27: Line 27:
 
* 2021 - Cepsa sold its stake to TotalEnergies
 
* 2021 - Cepsa sold its stake to TotalEnergies
  
+++ Geology
+
=== Geology ===
 
*  
 
*  
  
+++ Links
+
=== Links ===
 +
# [[NPCC Offshore Project References]]
 
# [http://killajoules.wikidot.com/blog:2153 AMEC awarded PMC services contract for ADMA OPCO’s multi-billion dollar Nasr and Umm Lulu fields, UAE]
 
# [http://killajoules.wikidot.com/blog:2153 AMEC awarded PMC services contract for ADMA OPCO’s multi-billion dollar Nasr and Umm Lulu fields, UAE]
 
# [http://killajoules.wikidot.com/archive:fluor-wins-umm-lulu-offshore-feed-contract-in-abu-dh/ Fluor Wins Umm Lulu Offshore Feed Contract in Abu Dhabi]
 
# [http://killajoules.wikidot.com/archive:fluor-wins-umm-lulu-offshore-feed-contract-in-abu-dh/ Fluor Wins Umm Lulu Offshore Feed Contract in Abu Dhabi]

Revision as of 18:22, 5 March 2024

Summary Information

  • Operator: ADMA OPCO
  • Country: UAE - Abu Dhabi
  • Location: 30 kilometers northwest of Abu Dhabi in the Arabian Gulf
  • Production start: 2014
  • Partners: Inpex, BP, Total
  • Type: Oil
  • Estimated Reserves:
  • Production Volume:

Description

  • In the first development phase, oil production from the Umm Lulu Oil Field has commenced by utilizing existing facilities of the Umm Al-Dalkh Oil Field
  • The oil produced from the Umm Lulu Oil Field in the first development phase is transported via an existing subsea pipeline to Zirku Island
  • The Umm Lulu Phase II field development includes six wellhead towers, production facilities, living quarters, infield subsea pipelines and the export pipeline to Zirku Island.
  • The project will tie into ADMA-OPCO's SARB project for further processing at the Zirku Island facilities.

Contractors

  • AMEC: Project Management Consultancy (PMC) services contract
  • Fluor: front-end engineering and design (FEED)
  • Technip: Detailed engineering, procurement, fabrication, offshore installation, commissioning and start-up of a large offshore super complex

History

  • 2010 - Fluor awarded the front-end engineering and design (FEED) contract
  • 2012 - AMEC awarded PMC services contract
  • 2013 - Technip awarded offshore super complex contract
  • 2014 - First oil produced
  • 2021 - Cepsa sold its stake to TotalEnergies

Geology

Links

  1. NPCC Offshore Project References
  2. AMEC awarded PMC services contract for ADMA OPCO’s multi-billion dollar Nasr and Umm Lulu fields, UAE
  3. Fluor Wins Umm Lulu Offshore Feed Contract in Abu Dhabi
  4. Technip awarded contract for the development of the Umm Lulu field in Abu Dhabi