Difference between revisions of "Umm Lulu Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: ADMA OPCO * Country: UAE - Abu Dhabi * Location: 30 kilometers northwest of Abu Dhabi in the Arabian Gulf * Production start: 2014 * Partners:...") |
Abarrelfull (talk | contribs) |
||
Line 25: | Line 25: | ||
* 2013 - Technip awarded offshore super complex contract | * 2013 - Technip awarded offshore super complex contract | ||
* 2014 - First oil produced | * 2014 - First oil produced | ||
+ | * 2021 - Cepsa sold its stake to TotalEnergies | ||
+++ Geology | +++ Geology | ||
Line 34: | Line 35: | ||
# [http://killajoules.wikidot.com/blog:4482 Technip awarded contract for the development of the Umm Lulu field in Abu Dhabi] | # [http://killajoules.wikidot.com/blog:4482 Technip awarded contract for the development of the Umm Lulu field in Abu Dhabi] | ||
# [http://killajoules.wikidot.com/blog:5581 INPEX Commences Oil Production from Umm Lulu Oil Field Offshore Abu Dhabi, United Arab Emirates] | # [http://killajoules.wikidot.com/blog:5581 INPEX Commences Oil Production from Umm Lulu Oil Field Offshore Abu Dhabi, United Arab Emirates] | ||
+ | # [https://abarrelfull.blogspot.com/2023/10/cepsa-accelerates-its-positive-motion.html Cepsa accelerates its Positive Motion strategy implementation with the sale of its upstream assets in Abu Dhabi to TotalEnergies] |
Revision as of 13:13, 14 October 2023
Summary Information
- Operator: ADMA OPCO
- Country: UAE - Abu Dhabi
- Location: 30 kilometers northwest of Abu Dhabi in the Arabian Gulf
- Production start: 2014
- Partners: Inpex, BP, Total
- Type: Oil
- Estimated Reserves:
- Production Volume:
+++ Description
- In the first development phase, oil production from the Umm Lulu Oil Field has commenced by utilizing existing facilities of the Umm Al-Dalkh Oil Field
- The oil produced from the Umm Lulu Oil Field in the first development phase is transported via an existing subsea pipeline to Zirku Island
- The Umm Lulu Phase II field development includes six wellhead towers, production facilities, living quarters, infield subsea pipelines and the export pipeline to Zirku Island.
- The project will tie into ADMA-OPCO's SARB project for further processing at the Zirku Island facilities.
+++ Contractors
- **AMEC:** Project Management Consultancy (PMC) services contract
- **Fluor:** front-end engineering and design (FEED)
- **Technip:** Detailed engineering, procurement, fabrication, offshore installation, commissioning and start-up of a large offshore super complex
+++ History
- 2010 - Fluor awarded the front-end engineering and design (FEED) contract
- 2012 - AMEC awarded PMC services contract
- 2013 - Technip awarded offshore super complex contract
- 2014 - First oil produced
- 2021 - Cepsa sold its stake to TotalEnergies
+++ Geology
+++ Links
- AMEC awarded PMC services contract for ADMA OPCO’s multi-billion dollar Nasr and Umm Lulu fields, UAE
- Fluor Wins Umm Lulu Offshore Feed Contract in Abu Dhabi
- Technip awarded contract for the development of the Umm Lulu field in Abu Dhabi
- INPEX Commences Oil Production from Umm Lulu Oil Field Offshore Abu Dhabi, United Arab Emirates
- Cepsa accelerates its Positive Motion strategy implementation with the sale of its upstream assets in Abu Dhabi to TotalEnergies